School District Capital Construction Projects: Letters of Intent for the Last 12 Months Report

THE STATE EDUCATION DEPARTMENT

OFFICE of FACILITIES PLANNING


LAST UPDATED ON 12/22/05 at 14:53:43
START OF REPORTING PERIOD: 12/22/04
END OF REPORTING PERIOD: 12/22/05


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows
           09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition

***ALBANY COUNTY***


ALBANY CITY SCHOOLS
District No.: 01-01-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Hackett Middle School:
Additions and Alterations    0-044-011  07/11/05   02 - 16               29,700,000   HCM

Albany High School:
Reconstruction               0-048-011  06/08/05   155                            0   HCM

Administration Bldg.:
Reconstruction               1-001-002  08/26/05   155                      268,469   HCM



COHOES CITY SCHOOLS
District No.: 01-05-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

District Wide:
Reconstruction               7-999-003  08/10/05   16                             0   JOD



SOUTH COLONIE CSD
District No.: 01-06-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Colonie Community Center:
Reconstruction               8-020-L01  05/11/05                                  0   RDR



NORTH COLONIE CSD
District No.: 01-06-05-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Bus Garage:
Reconstruction               5-015-010  06/21/05   13                        75,000   RDR



GUILDERLAND CSD
District No.: 01-08-02-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Lumber Storage Shed:
New Construction             2-020-001  02/10/05   02 - 16                        0   DDJ



BOCES ALBANY-SCHOH-SCHEN
District No.: 01-90-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Maywood School:
Reconstruction               0-018-007  01/20/05   2,7                      200,000   JOD

***ALLEGANY COUNTY***


GENESEE VALLEY CSD
District No.: 02-07-02-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

New Pre-K-12:
Reconstruction               0-012-002  06/09/05   9                        170,000   DDJ



FRIENDSHIP CSD
District No.: 02-16-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Building:
Reconstruction               0-001-013  09/28/05   2                        100,000   HCM



FILLMORE CSD
District No.: 02-20-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Fillmore Main Building:
Additions and Alterations    0-001-006  12/29/04   02 - 16                        0   HCM



SCIO CSD
District No.: 02-24-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Main Building:
Reconstruction               0-001-011  07/27/05   16                        35,000   HCM
Reconstruction               0-001-012  08/29/05   2,7,8,9,155,15,16              0   HCM

Bus Garage:
Reconstruction               5-002-006  08/29/05   15                             0   HCM



BOLIVAR-RICHBURG CSD
District No.: 02-29-02-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Bolivar 6-12 Building:
Reconstruction               0-001-018  04/06/05   7,8,9,155,15,16                0   HCM
Reconstruction               0-001-019  08/23/05   10                             0   HCM

Richburg K-5 Building:
Reconstruction               0-011-011  04/06/05   2,8,9,155,15,16                0   HCM

***BROOME COUNTY***


CHENANGO FORKS CSD
District No.: 03-01-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

:
New Construction             7-025-001  07/18/05   02 - 16                        0   JOD



BINGHAMTON CITY SCHOOLS
District No.: 03-02-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

New East Middle School:
Reconstruction               0-011-005  12/14/05   14                             0   HCM



SUSQUEHANNA VALLEY CSD
District No.: 03-06-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Cedarhurst Elem. School:
Reconstruction               0-005-004  03/30/05   2,9,13,155,15,16               0   RDR



DEPOSIT CSD
District No.: 03-13-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Press Box:
New Construction             7-014-001  02/15/05   02 - 16                   40,000   HCM

Concession Building:
New Construction             7-015-001  02/10/05   02 - 16                   60,000   HCM



UNION ENDICOTT CSD
District No.: 03-15-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Linnaeus West Elementary:
Reconstruction               0-004-008  04/11/05   2,13                      43,899   DDJ

Charles F.Johnson Elem.:
Reconstruction               0-006-011  04/11/05   2,13,15                   53,775   DDJ
Reconstruction               0-006-012  10/19/05   4,7,8,9,10,155,15,16   1,315,000   DDJ

Senior High School:
Reconstruction               0-011-024  11/29/05   15,16                    113,000   DDJ

T.J. Watson ES:
Reconstruction               0-016-010  04/11/05   2,13                     171,361   DDJ

Ann G. McGuinness Elementary:
Reconstruction               0-017-010  04/11/05   2,13                     172,165   DDJ

Softball Storage Building:
Discovered Building          2-032-001  03/18/05                                  0   DDJ

Press Box @ High School:
Discovered Building          7-031-001  03/18/05                                  0   DDJ

:
New Construction             7-033-001  09/28/05   02 - 16                        0   DDJ



JOHNSON CITY CSD
District No.: 03-15-02-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

K-8 Elementary Middle:
Additions and Alterations    0-020-002  05/02/05   02 - 16                        0   DDJ

:
New Construction             0-024-001  06/08/05   02 - 16                        0   DDJ



VESTAL CSD
District No.: 03-16-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Senior High:
Reconstruction               0-001-011  10/07/05   2,13                           0   JOD
Reconstruction               0-001-012  10/26/05   2,4,8,9,10,155,15,16           0   JOD

Clayton Avenue School:
Reconstruction               0-003-011  10/07/05   2,16                           0   JOD

Glenwood Ave. Elementary:
Reconstruction               0-010-008  10/07/05   2,16                           0   JOD

Tioga Hills Elem. School:
Reconstruction               0-012-007  10/07/05   2,16                           0   JOD

:
Reconstruction               3-002-001  10/26/05   2                              0   JOD



BOCES BROOME-TIOGA
District No.: 03-90-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

CBO-Building 2 (Admin):
Temporary Quarters           1-043-001  08/01/05                                  0   JOD

IBM-H.B. Endicott School Building:
Reconstruction               8-021-004  08/09/05   9,155,15,16                    0   JOD

***CATTARAUGUS COUNTY***


ELLICOTTVILLE CSD
District No.: 04-09-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Ellicottville Central School:
Reconstruction               0-001-010  12/07/05   2,155,16                       0   RDR

:
New Construction             2-008-001  07/27/05   02 - 16                        0   RDR



GOWANDA CSD
District No.: 04-28-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Junior/Senior High:
Reconstruction               0-001-005  01/28/05   2,4,7,8,9,155,15,16            0   HCM

Aldrich St. Elementary:
Additions and Alterations    0-006-003  01/28/05   02 - 16                        0   HCM

:
New Construction             7-006-001  09/02/05   02 - 16                        0   HCM



BOCES CATT-ALLEG-ERIE-WYOMING
District No.: 04-90-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

AF Haynes Center at Belmont:
Reconstruction               0-001-009  07/20/05   2,4,7,8,9,10,155,15,   5,615,637   JOD

Annex 3 C Wing:
Reconstruction               0-005-003  06/21/05   2,4,7,8,9,155,15,16            0   JOD

Ellicottville No. Area Occup. Center:
Reconstruction               0-006-012  06/21/05   2,4,7,8,9,10,155,15,   1,362,842   JOD

Annex 4 Bldg. B:
Reconstruction               0-007-003  07/20/05   2,7,8,9,10,155,15,16     349,720   JOD

Olean So. Area Occ. Ctr.:
Reconstruction               0-008-021  07/20/05   2,4,8,9,155,15,16      2,671,801   JOD

***CAYUGA COUNTY***


AUBURN CITY SCHOOLS
District No.: 05-01-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Genesee Street School:
Reconstruction               0-001-007  02/18/05   155,16                         0   JOD

Herman Avenue School:
Reconstruction               0-002-010  02/18/05   155,16                         0   JOD

West Middle School:
Reconstruction               0-006-006  02/18/05   155,16                         0   JOD

Owasco Elementary:
Reconstruction               0-010-011  02/18/05   155,16                         0   JOD

Casey Park Elementary:
Reconstruction               0-012-009  02/18/05   155,16                         0   JOD

Auburn High School:
Reconstruction               0-015-012  02/18/05   155,16                         0   JOD

Seward Elementary:
Reconstruction               0-017-011  02/18/05   155,16                         0   JOD

:
Discovered Building          7-035-001  09/02/05                                  0   JOD



WEEDSPORT CSD
District No.: 05-03-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Elementary School:
Reconstruction               0-001-012  05/24/05   2,7,155,15,16                  0   JOD

Junior Senior High School:
Reconstruction               0-002-017  05/24/05   2,7,155,15,16                  0   JOD



CATO-MERIDIAN CSD
District No.: 05-04-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Press Box:
Reconstruction               7-005-001  03/11/05   7,8,9,10,155,16           38,000   HCM



MORAVIA CSD
District No.: 05-13-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Athletic Storage Container:
New Construction             2-014-001  01/05/05   02 - 16                        0   RDR



BOCES CAYUGA-ONONDAGA
District No.: 05-90-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Occ. Educ. Center:
Reconstruction               0-001-004  05/03/05   13                             0   JOD
Reconstruction               0-001-005  07/26/05   2,9                            0   JOD
Reconstruction               0-001-006  08/12/05   2,9                            0   JOD

Storage Container 1:
New Construction             2-029-001  02/18/05   02 - 16                        0   JOD

:
Temporary Quarters           8-030-001  08/22/05                                  0   JOD

***CHAUTAUQUA COUNTY***


FREWSBURG CSD
District No.: 06-03-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Robert H Jackson Elem.:
Reconstruction               0-002-006  12/28/04   2,4,7,8,9,155,15,16            0   JOD

:
New Construction             7-013-001  09/02/05   02 - 16                        0   JOD



FALCONER CSD
District No.: 06-11-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Track & Field Storage Building:
Discovered Building          2-010-001  05/05/05   02 - 16                        0   JOD



FORESTVILLE CSD
District No.: 06-15-03-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

New Bus Garage:
New Construction             5-004-002  01/05/05   02 - 16                2,468,400   JOD



JAMESTOWN CITY SCHOOLS
District No.: 06-17-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Carlyle Ring Elementary:
Reconstruction               0-009-006  11/21/05   2,7,13                         0   DDJ

Clinton V Bush Elementary:
Reconstruction               0-010-006  11/21/05   2,7,13                         0   DDJ

Jefferson Jr. High:
Additions and Alterations    0-015-013  12/01/05   02 - 16                        0   DDJ
Reconstruction               0-015-014  12/09/05   2,10,16                        0   DDJ

Roger Elementary:
Reconstruction               0-018-005  11/21/05   7                              0   DDJ



FREDONIA CSD
District No.: 06-22-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Wheelock School K-3:
Reconstruction               0-001-008  10/07/05   16                             0   HCM

Main Street Campus 3-12:
Reconstruction               0-009-010  10/07/05   2,16                           0   HCM

***CHEMUNG COUNTY***


ELMIRA CITY SCHOOLS
District No.: 07-06-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Coburn Elementary:
Reconstruction               0-002-011  06/28/05   10                             0   DDJ
Reconstruction               0-002-012  08/11/05   2,4,7,9,155,15,16              0   DDJ

Booth Elementary:
Reconstruction               0-003-012  06/28/05   10                             0   DDJ

Beecher Elementary:
Reconstruction               0-005-008  06/28/05   10                             0   DDJ
Additions and Alterations    0-005-009  08/11/05   02 - 16                        0   DDJ

Diven Elementary:
Reconstruction               0-006-011  06/28/05   10                             0   DDJ

Fassett Elementary School:
Reconstruction               0-008-004  06/28/05   10                             0   DDJ
Additions and Alterations    0-008-005  08/11/05   02 - 16                        0   DDJ

Riverside Elementary:
Reconstruction               0-012-007  06/28/05   9,10                           0   DDJ
Reconstruction               0-012-008  12/21/05   2,7                            0   DDJ

Washington Elementary:
Reconstruction               0-013-011  06/28/05   10                             0   DDJ

Hendy Avenue Elementary:
Reconstruction               0-014-012  06/28/05   10                             0   DDJ

Ernie Davis Jr. High School:
Reconstruction               0-015-014  06/28/05   4,10                           0   DDJ

Southside High School:
Reconstruction               0-016-015  06/28/05   9,10                           0   DDJ

Pine City Elementary:
Reconstruction               0-033-013  06/28/05   7,10,155                       0   DDJ

Broadway ES(K-6)/MS(7-8):
Reconstruction               0-034-015  06/28/05   9,10,16                        0   DDJ

Elmira Free Academy:
Reconstruction               0-038-017  06/28/05   2,8,10,155,15                  0   DDJ
Reconstruction               0-038-018  11/30/05   2,155,16                       0   DDJ
Reconstruction               0-038-019  12/05/05   2,155,16                       0   DDJ

Storage Facility #3 @ Elmira Free Ac:
Discovered Building          2-073-001  12/22/04                                  0   DDJ

Storage Building @ Fossett:
New Construction             2-074-001  05/26/05   02 - 16                        0   DDJ

:
New Construction             2-075-001  06/28/05   02 - 16                        0   DDJ
New Construction             2-076-001  06/28/05   02 - 16                        0   DDJ
New Construction             2-077-001  06/28/05   02 - 16                        0   DDJ

Bus Garage:
Reconstruction               5-017-009  06/28/05   2,10,15,16                     0   DDJ

District Wide:
Reconstruction               7-999-006  12/19/05   16                             0   DDJ
Reconstruction               7-999-007  12/21/05   10,16                          0   DDJ



HORSEHEADS CSD
District No.: 07-09-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Senior High School South Wing:
Reconstruction               0-001-013  07/26/05   2,4,8,9,155,15,16              0   JOD

Broad Street Elementary:
Reconstruction               0-004-012  03/16/05   2                          9,700   JOD

Horseheads SHS North Wing:
Reconstruction               0-009-016  07/26/05   2,4,7,8,155,15,16              0   JOD

Middle School:
Reconstruction               0-013-017  07/26/05   2,4,8,9,10,155,15,16           0   JOD

Bus Garage:
Reconstruction               5-005-009  07/26/05   4,15,16                        0   JOD



ELMIRA HEIGHTS CSD
District No.: 07-09-02-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Bus Garage (lease):
Reconstruction               5-014-L02  02/28/05                             43,500   JOD
Reconstruction               5-014-L03  04/22/05                             48,000   JOD

***CHENANGO COUNTY***


UNADILLA VALLEY CSD
District No.: 08-10-03-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

New Pre K-12 Building:
Reconstruction               0-014-003  07/25/05   4,7                            0   RDR



NORWICH CITY SCHOOLS
District No.: 08-12-00-05
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Norwich Senior High School:
Reconstruction               0-008-008  09/08/05   155,16                         0   JOD
Reconstruction               0-008-009  09/20/05   155                            0   JOD

Guernsey Mem. Library:
Reconstruction               6-022-003  10/27/05   2,8,155,16                     0   JOD



SHERBURNE EARLVILLE CSD
District No.: 08-20-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Jr/Sr High School:
Reconstruction               0-012-009  08/23/05   2,4,7,8,9,10,13,14,1           0   RDR

New Elementary School:
Additions and Alterations    0-018-004  08/23/05   02 - 16                        0   RDR

Baseball Storage:
New Construction             2-023-001  08/22/05   02 - 16                        0   RDR

New Bus Storage:
Additions and Alterations    4-020-002  08/23/05   02 - 16                        0   RDR

New Bus Maintenance:
Reconstruction               5-019-002  08/23/05   2,9,155,15,16                  0   RDR

Press Box:
Reconstruction               7-021-002  08/23/05   2,16                           0   RDR

:
New Construction             7-022-001  08/22/05   02 - 16                        0   RDR

***CLINTON COUNTY***


AUSABLE VALLEY CSD
District No.: 09-02-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Keeseville Elementary:
Reconstruction               0-003-012  12/01/05   2,4,8,9,155,15,16              0   HCM

Middle High School:
Reconstruction               0-011-014  12/01/05   2,8,9,155,15,16                0   HCM
Reconstruction               0-011-015  12/01/05   7                              0   HCM

AuSable Forks Primary:
Reconstruction               0-012-007  12/01/05   2,4,8,9,155,15,16              0   HCM
Reconstruction               0-012-008  12/01/05   7                              0   HCM

Press Box (New Bldg.):
New Construction             7-022-001  12/21/05   02 - 16                        0   HCM



BEEKMANTOWN CSD
District No.: 09-03-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Main Building:
Reconstruction               0-003-008  04/15/05   2                              0   RDR
Reconstruction               0-003-009  08/11/05   155,16                   221,000   RDR
Reconstruction               0-003-010  08/11/05   13,16                          0   RDR

Cumberland Head Elementary:
Reconstruction               0-004-010  08/11/05   2,8,16                         0   RDR



NORTHEASTERN CLINTON CSD
District No.: 09-05-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Middle High School:
Reconstruction               0-001-005  03/03/05   155                       90,400   RDR

Rouses Point Elem.:
Reconstruction               0-002-005  11/21/05   7                              0   RDR



CHAZY UFSD
District No.: 09-06-01-02
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Chazy Rural Sch/Indust.Arts Bldg.:
Reconstruction               0-001-010  12/28/04   2,4,8,9,10,155,15,16     166,980   HCM



NORTHERN ADIRONDACK CSD
District No.: 09-09-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Ellenburgh Elementary:
Reconstruction               0-001-008  09/30/05   155,15                         0   DDJ

Jr/Sr High School:
Reconstruction               0-007-007  09/30/05   155,15                         0   DDJ



PERU CSD
District No.: 09-11-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Primary School:
Reconstruction               0-004-008  05/04/05   9,16                      27,400   RDR

Intermediate School:
Reconstruction               0-005-011  05/11/05   10,16                     35,800   RDR

Athletic Field House:
New Construction             7-018-001  05/11/05   02 - 16                   45,000   RDR



PLATTSBURGH CITY SCHOOLS
District No.: 09-12-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Concession Stand:
New Construction             7-016-001  02/18/05   02 - 16                   75,000   RDR

:
New Construction             7-017-001  08/11/05   02 - 16                   25,000   RDR



SARANAC CSD
District No.: 09-14-02-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Saranac Jr/Sr HS 7-12:
Reconstruction               0-002-010  04/06/05   4,8,9,10,155,15,16       483,530   HCM



BOCES CLINTON-ESSEX-WARR-WASH
District No.: 09-90-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Yandon Dillon Education Ctr.:
Reconstruction               0-001-006  12/28/04   2,13                           0   JOD

***COLUMBIA COUNTY***


GERMANTOWN CSD
District No.: 10-09-02-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Main Building:
Reconstruction               0-001-016  10/07/05   8,9,10,16                      0   JOD



CHATHAM CSD
District No.: 10-10-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Middle School:
Reconstruction               0-002-014  12/01/05   2,4,7,8,9,10,13,14,1           0   DDJ

High School:
Reconstruction               0-005-010  12/13/05   2,4,7,8,9,10,13,14,1           0   DDJ



ICHABOD CRANE (KINDERHOOK) CSD
District No.: 10-14-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Martin H. Glynn School:
Additions and Alterations    0-003-011  09/12/05   02 - 16                  359,000   HCM

***CORTLAND COUNTY***


CINCINNATUS CSD
District No.: 11-01-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Central School:
Reconstruction               0-001-009  06/07/05   2,4,8,9,10,13,14,155           0   DDJ
Reconstruction               0-001-010  10/19/05   2                              0   DDJ
Reconstruction               0-001-011  10/19/05   2,4,7,8,9,10,14,155,           0   DDJ

:
Discovered Building          1-012-001  09/02/05                                  0   DDJ



MCGRAW CSD
District No.: 11-03-04-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Elementary School:
Reconstruction               0-004-008  05/20/05   2,9                       99,900   RDR
Reconstruction               0-004-009  07/21/05   2,9                            0   RDR



MARATHON CSD
District No.: 11-09-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

High School:
Reconstruction               0-001-010  03/21/05   8,155,16               1,165,000   HCM

Appleby Elementary:
Reconstruction               0-005-010  03/21/05   8,9,15,16              1,182,000   HCM

New Bus Garage:
Reconstruction               5-006-003  03/21/05   10,15                    248,000   HCM




District No.: 11-16-05-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

:
Reconstruction               0-003-009  04/12/05   2,9                       92,095   HCM

***DELAWARE COUNTY***


ANDES CSD
District No.: 12-01-02-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Main Building:
Reconstruction               0-001-005  10/27/05   2,7                            0   HCM



DELHI CSD
District No.: 12-05-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Delaware Academy:
Reconstruction               0-001-007  07/20/05   4,7,8,155,15,16                0   DDJ

Delhi Elementary School:
Reconstruction               0-004-004  07/20/05   4,7,8,9,155,15,16              0   DDJ

Abraham L Kellogg:
Reconstruction               0-006-003  07/20/05   4,7,8,9,155,15,16              0   DDJ

A.L. Kellogg Elementary School:
Reconstruction               0-009-002  09/29/05   4,7,8,9,155,15,16              0   DDJ

:
New Construction             2-012-001  08/11/05   02 - 16                        0   DDJ

Bus/Maintenance Garage:
Reconstruction               5-010-002  07/20/05   4,7,8,9,155,15,16              0   DDJ



HANCOCK CSD
District No.: 12-09-06-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Jr/Sr High School:
Reconstruction               0-001-010  09/20/05   2,4,7,8,9,155,15,16            0   JOD

Elementary School:
Additions and Alterations    0-004-009  09/20/05   02 - 16                        0   JOD



SIDNEY CSD
District No.: 12-16-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Sidney Senior High:
Reconstruction               0-001-009  06/20/05   16                             0   JOD



SOUTH KORTRIGHT CSD
District No.: 12-17-02-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Central School:
Reconstruction               0-003-009  09/12/05   10                             0   DDJ

Bus Garage:
Reconstruction               5-001-007  09/12/05   10                             0   DDJ



WALTON CSD
District No.: 12-19-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Townsend School K-5:
Reconstruction               0-006-015  12/05/05   9,155,16                       0   HCM

Bus Garage:
Reconstruction               5-003-006  05/12/05   13                             0   HCM



BOCES DEL-CHEN-MADISON-OTSEGO
District No.: 12-90-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Chenango Campus (Occ Ctr 011):
Reconstruction               0-002-019  07/13/05   2,15                      21,000   JOD

W. Delaware Ed. Campus Bldg. B:
Reconstruction               0-003-012  08/29/05   4,9,155,16                     0   JOD

:
Reconstruction               1-032-001  10/26/05   4,155,16                       0   JOD

Oc. Ed. Clsrm. Bldg. W. Delwr.:
Reconstruction               8-026-003  09/01/05   9,13                           0   JOD

United Church of Christ First Congre:
Temporary Quarters           8-039-001  01/14/05                                  0   JOD

Sidney Civic Center:
Temporary Quarters           8-040-001  01/14/05                                  0   JOD

:
Reconstruction               8-041-L01  10/14/05                                  0   JOD

***DUTCHESS COUNTY***


BEACON CITY SCHOOLS
District No.: 13-02-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Howland Public Library:
New Construction             6-022-001  02/04/05   02 - 16                        0   JOD

New Press Box:
New Construction             7-023-001  04/25/05   02 - 16                   35,585   JOD



DOVER UFSD
District No.: 13-05-02-02
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Dover Middle/High School:
Reconstruction               0-001-009  04/11/05   2,8,9,15                  99,700   RDR
Reconstruction               0-001-010  10/27/05   2,10,155,15,16                 0   JOD
Reconstruction               0-001-011  10/27/05   2,10,155,15,16                 0   RDR

Dover Elem. School:
Reconstruction               0-004-008  10/27/05   2,7,9,15,16                    0   JOD

:
New Construction             7-009-001  11/10/05   02 - 16                        0   JOD
New Construction             7-010-001  11/10/05   02 - 16                        0   JOD



HYDE PARK CSD
District No.: 13-08-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Haviland Middle School(JrHigh):
Reconstruction               0-001-016  01/14/05   2,4,7,8,9,14,155,15,           0   HCM
Reconstruction               0-001-017  05/31/05   7                        128,000   HCM
Reconstruction               0-001-018  05/31/05   2,4,8,9,14,155,15,16   1,697,977   HCM

Roosevelt High School:
Reconstruction               0-002-015  01/14/05   2,4,8,9,14,155,15,16     314,100   HCM
Reconstruction               0-002-016  05/31/05   2,4,8,9,155,15,16      2,230,348   HCM
Reconstruction               0-002-017  09/28/05   16                       186,500   HCM

Ralph R. Smith Elementary:
Reconstruction               0-003-014  01/14/05   2,4,7,8,9,14,155,15,     355,116   HCM
Reconstruction               0-003-015  05/31/05   2,4,7,8,9,14,155,15,   1,629,979   HCM

Violet Avenue Elementary:
Reconstruction               0-004-013  01/14/05   2,4,7,8,9,14,155,15,     191,268   HCM
Reconstruction               0-004-014  05/31/05   2,4,7,8,9,14,155,15,   1,162,128   HCM

Hyde Park Elementary:
Reconstruction               0-005-018  01/14/05   2,4,7,8,9,14,155,15,      31,020   HCM
Reconstruction               0-005-019  05/31/05   2,4,7,8,9,14,155,15,     933,949   HCM

Netherwood Elementary School:
Reconstruction               0-007-014  01/14/05   2,4,7,8,9,14,155,15,      15,180   HCM
Reconstruction               0-007-015  05/31/05   2,4,7,8,9,14,155,15,     832,854   HCM

North Park Elementary School:
Reconstruction               0-013-015  01/14/05   2,4,7,8,9,14,155,15,      19,140   HCM
Reconstruction               0-013-016  05/31/05   2,4,7,8,9,155,15,16      480,249   HCM



NORTHEAST (WEBUTUCK) CSD
District No.: 13-11-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Millerton Elementary School:
Reconstruction               0-001-007  04/06/05   13                       320,000   JOD



PAWLING CSD
District No.: 13-12-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

:
Temporary Quarters           1-010-001  06/13/05                                  0   JOD

Office/Storage @ leased bus garage:
Temporary Quarters           1-011-001  07/19/05                                  0   JOD

Leased Bus Garage:
Reconstruction               5-009-L01  06/08/05                                  0   JOD



PINE PLAINS CSD
District No.: 13-13-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Seymour Smith School:
Reconstruction               0-001-011  08/11/05   155                            0   HCM

Cold Springs Elementary:
Reconstruction               0-002-005  01/20/05   7                        890,000   HCM



ARLINGTON CSD
District No.: 13-16-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

North Campus HS:
Reconstruction               0-008-008  03/24/05   16                       200,000   HCM
Additions and Alterations    0-008-009  08/10/05   02 - 16                        0   HCM



SPACKENKILL UFSD
District No.: 13-16-02-02
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Spackenkill High School:
Reconstruction               0-005-015  03/16/05   2,7,8,9,155,15,16              0   JOD



RED HOOK CSD
District No.: 13-17-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Senior High School:
Reconstruction               0-005-006  02/17/05   16                       278,500   DDJ

Mill Rd. Elementary:
Reconstruction               0-006-005  04/19/05   2,15                     100,000   DDJ

:
Discovered Building          7-020-001  08/22/05                                  0   HCM

Red Hook VFW:
Temporary Quarters           8-021-001  05/25/05                                  0   DDJ



RHINEBECK CSD
District No.: 13-18-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

High School:
Reconstruction               0-002-015  07/22/05   8,155,16                       0   DDJ

Livingston Elem. School:
Reconstruction               0-004-012  07/22/05   8,155,16                       0   DDJ

Administrative Building:
Temporary Quarters           1-009-001  05/02/05                                  0   DDJ



WAPPINGERS CSD
District No.: 13-21-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Evans Elementary School:
Reconstruction               0-003-016  04/15/05   155,15,16                227,920   HCM

Van Wyck Junior High School:
Reconstruction               0-017-016  04/12/05   2,15                      39,000   HCM

John Jay High School:
Reconstruction               0-020-024  04/12/05   2,15                      75,000   HCM

:
New Construction             0-045-001  12/01/05   02 - 16                        0   HCM

Laerdal:
Reconstruction               8-044-L01  05/26/05                                  0   HCM



BOCES DUTCHESS
District No.: 13-90-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Special Education Center:
Reconstruction               0-001-020  04/06/05   2,9,10,155,15,16               0   JOD
Reconstruction               0-001-021  08/09/05   2,155,15,16                    0   JOD

:
Reconstruction               8-039-L01  08/01/05                                  0   JOD

***ERIE COUNTY***


WILLIAMSVILLE CSD
District No.: 14-02-03-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Dodge Elem. School 4:
Reconstruction               0-002-010  10/26/05   2,4,9,10,14,155,15,1           0   DDJ

Maple Elem. East 6:
Reconstruction               0-003-010  10/26/05   2,4,9,10,14,155,15,1           0   DDJ

Mill Middle School 2:
Reconstruction               0-004-016  10/26/05   2,7,8,9,10,14,155,15           0   DDJ

South Senior High:
Reconstruction               0-005-017  10/26/05   2,4,7,9,10,14,155,15           0   DDJ

Forest Elementary #5:
Reconstruction               0-006-011  02/10/05   2,10                     600,000   DDJ
Reconstruction               0-006-012  10/26/05   2,8,9,10,14,155,15,1           0   DDJ

Heim Middle School 7:
Reconstruction               0-007-011  10/26/05   2,9,10,14,15,16                0   DDJ

Heim Elementary School #8:
Reconstruction               0-008-013  11/02/05   2,4,7,9,10,155,15,16           0   DDJ

Maple West Elementary School #9:
Reconstruction               0-009-009  10/26/05   2,10,14,155,15,16              0   DDJ

North Senior High:
Reconstruction               0-010-014  05/02/05   13                       500,000   DDJ
Reconstruction               0-010-015  10/26/05   2,7,8,13,14,155,15,1           0   DDJ

Country Pkwy. Elem. 11:
Reconstruction               0-011-009  10/26/05   2,8,9,10,14,155,15,1           0   DDJ

Casey Middle School:
Reconstruction               0-012-016  10/25/05   7,10,14,155,15,16              0   DDJ

Williamsville East H.S.:
Additions and Alterations    0-016-014  04/12/05   02 - 16                   20,000   DDJ
Reconstruction               0-016-015  10/26/05   2,8,9,10,15,16                 0   DDJ

Transit Middle School:
Reconstruction               0-029-009  10/24/05   2,7,10,155,15,16               0   DDJ

:
New Construction             7-049-001  07/20/05   02 - 16                        0   DDJ



SWEET HOME CSD
District No.: 14-02-07-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Sweet Home High School:
Reconstruction               0-003-007  01/14/05   2,4,7,8,9,155,15,16            0   RDR

Glendale Elementary:
Reconstruction               0-006-006  01/14/05   2,4,7,8,9,155,15,16      330,813   RDR

Maplemere Elementary:
Reconstruction               0-007-006  01/14/05   2,4,7,8,9,155,15,16            0   RDR

Willow Ridge Elementary:
Reconstruction               0-009-006  01/14/05   2,4,7,8,9,155,15,16            0   RDR

Heritage Heights Elementary:
Reconstruction               0-012-007  01/14/05   2,4,7,8,9,155,15,16      475,817   RDR



EAST AURORA UFSD
District No.: 14-03-01-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Parkdale Elementary:
Additions and Alterations    0-004-006  08/11/05   02 - 16                        0   JOD

Middle School:
Additions and Alterations    0-006-013  08/11/05   02 - 16                        0   JOD

Senior High School:
Additions and Alterations    0-010-012  08/11/05   02 - 16                        0   JOD

:
New Construction             3-013-001  08/11/05   02 - 16                        0   JOD



BUFFALO CITY SCHOOLS
District No.: 14-06-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Public School #4:
Reconstruction               0-004-008  01/20/05   155                            0   JOD

Hilary Park Academy P.S.#27:
Reconstruction               0-027-009  01/20/05   155                            0   JOD
Reconstruction               0-027-010  09/13/05   155,16                         0   JOD

Montessori/Bennett #32:
Reconstruction               0-032-010  02/25/05   8,9                            0   JOD

Public School #36:
Reconstruction               0-036-013  01/20/05   155                            0   JOD
Reconstruction               0-036-014  09/15/05   155,16                         0   JOD

Academy School #43:
Reconstruction               0-043-012  02/25/05   4,8,9,155,15,16          590,510   JOD

Fred Law Olmstead PS 56:
Reconstruction               0-056-006  01/20/05   155                            0   JOD
Reconstruction               0-056-007  09/13/05   155,16                         0   JOD

North Park Academy #66:
Reconstruction               0-066-009  01/20/05   155                            0   JOD
Reconstruction               0-066-010  09/13/05   155,16                         0   JOD

Houghton Academy #69:
Reconstruction               0-069-013  09/13/05   155,16                         0   JOD

Southside Elementary:
Reconstruction               0-093-007  01/20/05   4,8,9,155,16             583,470   JOD

Traditional High School:
Reconstruction               0-192-009  09/13/05   155,16                         0   JOD

Grover Cleveland High School:
Reconstruction               0-202-014  01/20/05   155                            0   JOD
Reconstruction               0-202-015  09/13/05   155,16                         0   JOD

Kensington High:
Reconstruction               0-203-018  02/08/05   15,16                          0   JOD

Burgard Vocational HS:
Reconstruction               0-301-017  04/11/05   4                        790,500   JOD

Hutchinson-Central Tech HS:
Reconstruction               0-304-013  02/08/05   15,16                          0   JOD

International Inst.:
Reconstruction               8-102-L01  06/24/05                                  0   JOD

Emerson-Culinary Arts/Metropole:
Reconstruction               8-308-002  01/14/05   10                             0   JOD



CHEEKTOWAGA CSD
District No.: 14-07-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Union Rd. Sch. (Offices):
Reconstruction               1-003-002  04/18/05   2,13                     177,994   JOD

District Garage:
Reconstruction               2-011-001  04/18/05   2,4,7,8,9,155,15,16            0   JOD



CHEEKTOWAGA-SLOAN UFSD
District No.: 14-07-09-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Woodrow Wilson Elem.:
Additions and Alterations    0-001-007  04/06/05   02 - 16                5,678,348   JOD

Roosevelt Elem. School:
Additions and Alterations    0-002-007  04/06/05   02 - 16                4,621,773   JOD

JF Kennedy Jr/Sr High School:
Additions and Alterations    0-004-011  04/06/05   02 - 16                6,324,755   JOD

Team Room/Garage:
Reconstruction               0-005-004  04/06/05   4,9,10,155,15,16         175,124   JOD



EDEN CSD
District No.: 14-12-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Eden Elementary:
Reconstruction               0-001-010  08/30/05   2,7,14,155                     0   DDJ

G.L. Priess Elementary:
Reconstruction               0-002-011  08/30/05   2,7,16                         0   DDJ

Senior High School:
Reconstruction               0-006-009  08/30/05   2,4,7,14,155                   0   DDJ

District Wide:
Reconstruction               7-999-003  05/26/05   16                       233,800   DDJ



IROQUOIS CSD
District No.: 14-13-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Middle School:
Reconstruction               0-002-016  07/21/05   4                              0   DDJ

Iroquois Intermediate:
Reconstruction               0-004-010  07/21/05   4                              0   DDJ

Senior High School:
Reconstruction               0-007-016  11/25/05   10                             0   DDJ

Toilet Facilities:
New Construction             7-020-001  02/04/05   02 - 16                  900,000   DDJ



GRAND ISLAND CSD
District No.: 14-15-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Kaegebein Elementary School:
Reconstruction               0-002-005  02/01/05   2,4,7,8,10,155,15,16   2,362,550   MAC



FRONTIER CSD
District No.: 14-16-04-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Amsdell Hghts. Junior High:
Reconstruction               0-013-014  02/18/05   15                       250,000   DDJ



HOLLAND CSD
District No.: 14-17-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Brumstead Elementary School:
Reconstruction               0-002-005  01/20/05   2,4,7,8,9,155,15,16      543,562   HCM

High School:
Reconstruction               0-003-010  01/20/05   2,4,7,8,155,15,16      1,568,811   HCM

Middle School:
Reconstruction               0-013-008  01/20/05   2,4,7,8,9,155,15,16    1,032,729   HCM

Bus Garage:
Reconstruction               5-004-005  01/20/05   2,8,16                   354,898   HCM



LACKAWANNA CITY SCHOOLS
District No.: 14-18-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Sr. High Lackawanna:
Reconstruction               0-001-011  01/28/05   2,4,10                         0   JOD

McKinley Elementary School:
Reconstruction               0-009-008  01/28/05   4                              0   JOD

New Elementary School(Martin Rd.):
Reconstruction               0-011-002  01/28/05   2                              0   JOD



AKRON CSD
District No.: 14-21-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

K-12 Main Building:
Reconstruction               0-001-007  01/21/05   2,4,7,9,155,15,16        552,972   JOD



ORCHARD PARK CSD
District No.: 14-23-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Senior High School:
Reconstruction               0-002-014  03/11/05   7,155                  1,328,909   JOD
Reconstruction               0-002-015  03/17/05   7,155                  2,320,307   JOD

Middle School:
Reconstruction               0-003-015  03/11/05   7,155                    834,827   JOD
Reconstruction               0-003-016  03/17/05   7,155                  1,653,269   JOD

South Davis Elementary:
Reconstruction               0-004-016  03/11/05   7,155                    622,053   JOD
Reconstruction               0-004-017  03/17/05   7,155                    840,635   JOD



KENMORE UFSD
District No.: 14-26-01-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Kenmore Middle:
Reconstruction               0-017-014  03/23/05   4                         81,850   DDJ

Bus Garage @ Military Rd.:
Alterations                  5-034-001  09/02/05   02 - 16                        0   DDJ



WEST SENECA CSD
District No.: 14-28-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

West Junior High:
Reconstruction               0-002-012  04/11/05   155                      165,006   HCM

Winchester Elementary School:
Reconstruction               0-009-016  04/11/05   8,155                    604,942   HCM

Potters Road Elem. School:
Reconstruction               0-014-010  04/11/05   155                      190,306   HCM



BOCES ERIE I
District No.: 14-91-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Potter School Occ Center:
Reconstruction               0-008-009  12/22/04   4,9,155,15,16            210,900   JOD
Reconstruction               0-008-010  07/22/05   4,9,155,15,16                  0   JOD



BOCES ERIE II-CHAUTAUQUA-CATTARAUGUS
District No.: 14-92-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Hewes C Building:
Reconstruction               0-001-009  09/02/05   7                        199,200   JOD

Hewes A Building:
Reconstruction               0-002-011  09/02/05   7                        698,600   JOD

Hewes B Bldg.:
Reconstruction               0-003-011  09/02/05   7                        382,100   JOD

Hewes E Building:
Reconstruction               0-005-010  05/31/05   2,8,9,155,15,16          985,100   JOD

Willis H Carrier:
Reconstruction               0-006-013  06/01/05   2,4,8,9,155,16         1,030,900   JOD

Ormsby Voc. Tech. Ctr.:
Reconstruction               0-007-009  06/01/05   2,4,8,9,155,16           617,900   JOD

Hewes T Building:
Reconstruction               0-011-007  06/01/05   2,4,7,155,15,16          156,000   JOD

Loguidice A Building:
Reconstruction               0-013-013  06/01/05   2,4,8,9,155,16           703,600   JOD

Loguidice B Bldg.:
Reconstruction               0-014-011  07/21/05   4,7                      355,500   JOD

Louidice Building C:
Reconstruction               0-015-009  07/21/05   4,7                      138,500   JOD

Loguidice D Bldg:
Reconstruction               0-016-006  06/01/05   2,4,13,155,16            238,300   JOD

Loguidice E Building:
Reconstruction               0-017-013  06/01/05   2,155,15,16              505,800   JOD

Loguidice T Bldg:
Reconstruction               0-018-009  06/01/05   2,13,155,15,16           218,800   JOD

The Park Associates:
Reconstruction               8-066-L01  06/08/05                                  0   JOD

***ESSEX COUNTY***


MORIAH CSD
District No.: 15-09-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Main Building:
Reconstruction               0-008-013  10/21/05   2,4,7,8,9,10,155,15,           0   HCM

Bus Garage:
Reconstruction               5-007-004  10/24/05   2,4,7,8,10,155,15,16           0   HCM



LAKE PLACID CSD
District No.: 15-11-02-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Annex Building - Jr./Sr. High School:
Additions and Alterations    1-008-003  12/01/05   02 - 16                        0   JOD

Restrooms - Athletic Fields:
Additions and Alterations    7-009-002  12/01/05   02 - 16                        0   JOD



SCHROON LAKE CSD
District No.: 15-14-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Central School:
Additions and Alterations    0-001-006  01/19/05   02 - 16                        0   HCM

Bus Garage:
Reconstruction               5-002-002  01/19/05   2,4,7,8,9,155,15,16            0   HCM



WILLSBORO CSD
District No.: 15-17-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

New K-12:
Reconstruction               0-007-002  09/13/05   16                             0   DDJ

***FRANKLIN COUNTY***


SALMON RIVER CSD
District No.: 16-12-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Main Bldg. Campus:
Reconstruction               0-001-015  01/03/05   2,8,9,155,15             700,000   DDJ



MALONE CSD
District No.: 16-15-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Malone Junior High School:
Reconstruction               0-001-008  03/17/05   8                         55,000   JOD

St.Joseph's Elem. School:
Reconstruction               0-011-004  03/17/05   2,7                      295,000   JOD



BRUSHTON MOIRA CSD
District No.: 16-16-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Central School Building:
Reconstruction               0-001-008  11/21/05   8,155                          0   DDJ

Bus Garage:
Reconstruction               5-003-008  11/21/05   8,10,15                        0   DDJ



ST. REGIS FALLS CSD
District No.: 16-18-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Bus Garage (lease):
Reconstruction               5-004-L02  02/22/05                             37,400   HCM

***FULTON COUNTY***


GLOVERSVILLE CITY SCHOOLS
District No.: 17-05-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

High School:
Reconstruction               0-010-014  01/28/05   2,10                     290,595   DDJ

Storage Bldg. @ Middle School:
New Construction             2-029-001  03/30/05   02 - 16                   55,000   DDJ

Bus Garage (lease):
Reconstruction               5-024-L02  07/11/05                                  0   DDJ
Reconstruction               5-024-L03  07/11/05                                  0   DDJ
Reconstruction               5-024-L04  07/11/05                                  0   DDJ

Districtwide:
Reconstruction               7-999-002  04/06/05   16                             0   DDJ



JOHNSTOWN CITY SCHOOL DISTRICT
District No.: 17-06-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Warren Street School:
Reconstruction               0-003-005  03/15/05   2,13                           0   RDR

Knox Junior High School:
Reconstruction               0-006-004  02/17/05   2,155,16                       0   RDR

Pleasant Ave. School:
Reconstruction               0-007-009  02/17/05   7,155                          0   RDR
Reconstruction               0-007-010  09/12/05   13,15                          0   RDR

Senior High School:
Additions and Alterations    0-009-006  02/17/05   02 - 16                        0   RDR
Reconstruction               0-009-007  10/07/05   2,4,13,155                     0   RDR

Glebe Street Elem.:
Reconstruction               0-010-005  02/17/05   2,7,155,16                     0   RDR

Jansen Avenue Elem. School:
Reconstruction               0-011-003  02/17/05   2,7,155,16                     0   RDR

Warehouse ABCD-Transportation Fac.:
Reconstruction               5-033-L02  04/07/05                                  0   RDR

Dugout #1 @ Baseball Field:
New Construction             7-034-001  05/13/05   02 - 16                        0   RDR

Dugout #2 @ Baseball Field:
New Construction             7-035-001  05/13/05   02 - 16                        0   RDR

Dugout #1 @ Softball Field:
New Construction             7-036-001  05/13/05   02 - 16                        0   RDR

Dugout #2 @ Softball Field:
New Construction             7-037-001  05/13/05   02 - 16                        0   RDR

GJSD Transportation/Maintenance Faci:
Reconstruction               8-038-L01  12/01/05                                  0   RDR



MAYFIELD CSD
District No.: 17-08-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Jr/Sr High School:
Reconstruction               0-001-015  03/23/05   2,4,8,9,10,155,15,16           0   DDJ

Elementary School:
Reconstruction               0-002-011  03/30/05   2,8,9,10,155,15,16             0   DDJ

Storage Shed @ Elementary School:
Reconstruction               2-004-002  03/30/05   2,7,8,9,16                     0   DDJ

Storage Bldg.@ JR/SR High School:
New Construction             2-009-001  03/30/05   02 - 16                        0   DDJ

Storage Building @ Elementary School:
New Construction             2-010-001  03/30/05   02 - 16                        0   DDJ

Bus Garage:
Reconstruction               5-003-006  04/05/05   2,15,16                        0   DDJ



NORTHVILLE CSD
District No.: 17-09-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Storage Shed/Mini Bus Garage:
Discovered Building          2-011-001  12/22/04                                  0   HCM

***GENESEE COUNTY***


BATAVIA CITY SCHOOLS
District No.: 18-03-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Batavia Middle School:
Additions and Alterations    0-002-009  04/04/05   02 - 16                        0   HCM

Robert Morris School:
Reconstruction               0-005-006  04/04/05   2,4,8,9,10,155,15,16           0   HCM

Richmond Memorial Library:
Reconstruction               6-003-003  04/04/05   2,4,7,155,15,16                0   HCM



PAVILION CSD
District No.: 18-12-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Jr/Sr High School:
Reconstruction               0-001-005  09/28/05   2,13,16                        0   HCM

:
New Construction             2-007-001  09/28/05   02 - 16                        0   HCM
New Construction             7-008-001  09/28/05   02 - 16                        0   HCM



PEMBROKE CSD
District No.: 18-13-02-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Bus Garage:
Additions and Alterations    5-004-003  08/22/05   02 - 16                        0   HCM

***GREENE COUNTY***


CATSKILL CSD
District No.: 19-04-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Senior/Junior High School:
Reconstruction               0-005-013  01/14/05   2,155,15,16              776,634   HCM
Reconstruction               0-005-014  03/17/05   8,9,15,16                      0   HCM

Gazebo #2:
Discovered Building          7-031-001  05/26/05                                  0   HCM



GREENVILLE CSD
District No.: 19-07-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

District Office:
New Construction             1-017-001  02/23/05   02 - 16                        0   DDJ

Storage Building:
New Construction             2-018-001  02/23/05   02 - 16                        0   DDJ



HUNTER-TANNERSVILLE CSD
District No.: 19-09-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Junior Senior High:
Reconstruction               0-001-010  12/22/04   155                       89,000   DDJ



WINDHAM-ASHLAND-JEWETT CSD
District No.: 19-14-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Main Building:
Additions and Alterations    0-001-012  10/07/05   02 - 16                        0   HCM



BOCES OTSEGO NORTHERN CATSKILLS
District No.: 19-90-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Otsego Occupational Center:
Reconstruction               0-016-009  05/02/05   7                        663,502   JOD

***HAMILTON COUNTY***


INDIAN LAKE CSD
District No.: 20-04-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Indian Lake Central:
Reconstruction               0-001-014  10/07/05   4                              0   JOD

Town of Indian Lk. Highway Garage:
Reconstruction               5-006-L01  02/10/05                                  0   JOD



LAKE PLEASANT CSD
District No.: 20-06-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Bus Storage/Maintenance Building:
Reconstruction               5-004-L03  12/12/05                                  0   RDR



LONG LAKE CSD
District No.: 20-07-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Main Building K-12:
Reconstruction               0-001-016  03/30/05   16                        62,975   HCM
Reconstruction               0-001-017  03/30/05   2,155                    200,000   HCM

***HERKIMER COUNTY***


WEST CANADA VALLEY CSD
District No.: 21-03-02-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Jr/Sr High:
Reconstruction               0-003-008  07/19/05   8,10,13,16                84,500   HCM
Reconstruction               0-003-009  07/25/05   8,10,13                        0   HCM



DOLGEVILLE CSD
District No.: 21-10-03-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

James A Green School:
Reconstruction               0-001-013  09/20/05   2,4,7,8,9,10,13,155,           0   RDR



POLAND CSD
District No.: 21-11-03-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Main Building:
Reconstruction               0-002-016  07/26/05   8,155,16                 409,988   RDR

Bus Storage Garage:
Reconstruction               4-001-005  07/26/05   155,16                    52,446   RDR

***JEFFERSON COUNTY***


ALEXANDRIA CSD
District No.: 22-02-02-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Alexandria Central:
Reconstruction               0-001-010  07/20/05   2,155,15,16              830,621   JOD

Bus Garage:
Reconstruction               0-004-002  07/21/05   16                        10,969   JOD



THOUSAND ISLANDS CSD
District No.: 22-07-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Junior Senior High:
Reconstruction               0-011-006  04/19/05   9,16                      60,000   RDR



BELLEVILLE HENDERSON CSD
District No.: 22-09-09-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

K-12 School:
Additions and Alterations    0-010-004  12/01/05   02 - 16                        0   DDJ



SACKETS HARBOR CSD
District No.: 22-10-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Sackets Harbor Central:
Reconstruction               0-001-007  10/07/05   2,4,7,8,9,10,155,15,           0   RDR



WATERTOWN CITY SCHOOLS
District No.: 22-20-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

North Elementary:
Reconstruction               0-010-005  05/13/05   4,8,9,10,14,155,15,1           0   HCM

Knickerbocker Elementary:
Additions and Alterations    0-011-003  05/13/05   02 - 16                        0   HCM

Sherman Elementary School:
Additions and Alterations    0-012-003  05/13/05   02 - 16                        0   HCM

Watertown High School:
Additions and Alterations    0-015-005  05/13/05   02 - 16                        0   HCM

Ohio Street Elementary:
Reconstruction               0-016-003  05/13/05   9,155,15,16                    0   HCM
Additions and Alterations    0-016-003  05/13/05   02 - 16                        0   HCM

H.T.Wiley Elementary:
Reconstruction               0-021-008  05/13/05   2,4,7,8,9,10,14,155,           0   HCM



CARTHAGE CSD
District No.: 22-22-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Great Bend Grade School:
Reconstruction               0-008-005  10/19/05   7                              0   JOD

***LEWIS COUNTY***


COPENHAGEN CSD
District No.: 23-02-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Main Building:
Reconstruction               0-001-013  11/29/05   4,8,9                          0   DDJ

***LIVINGSTON COUNTY***


CALEDONIA MUMFORD CSD
District No.: 24-02-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Jr/Sr High School:
Reconstruction               0-001-004  03/14/05   2,4,7,8,9,14,155,15,   3,424,540   JOD

Elementary School:
Reconstruction               0-003-006  03/23/05   2,4,7,8,9,14,155,15,   1,696,160   JOD

Admin/Classroom Bldg.:
Reconstruction               1-002-005  03/23/05   2,4,7,8,9,14,155,15,           0   JOD

New Bus Garage:
Reconstruction               5-006-003  03/23/05   2,4,8,9,14,155,15,16           0   JOD

:
New Construction             7-010-001  12/01/05   02 - 16                        0   JOD
New Construction             7-013-001  08/22/05   02 - 16                   10,000   JOD
New Construction             7-014-001  08/22/05   02 - 16                   96,000   JOD



DALTON-NUNDA CSD
District No.: 24-11-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

:
Reconstruction               7-999-001  04/06/05   16                             0   JOD



YORK CSD
District No.: 24-17-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Athletic Storage:
Discovered Building          2-006-001  05/11/05                                  0   DDJ



BOCES GENESEE VALLEY (GEN-LIV-STEU-)
District No.: 24-90-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

C.May Occup Ctr at Mt Morris:
Additions and Alterations    0-002-008  02/15/05   02 - 16                        0   JOD

Area Occup. Bldg. A:
Additions and Alterations    0-019-002  02/15/05   02 - 16                        0   JOD

Saw Mill Barn:
New Construction             2-042-001  04/13/05   02 - 16                        0   JOD

Animal Barn:
New Construction             2-043-001  04/13/05   02 - 16                        0   JOD

Districtwide:
Reconstruction               7-999-003  02/15/05   16                             0   JOD
Reconstruction               7-999-004  10/28/05   16                             0   JOD

***MONROE COUNTY***


BRIGHTON CSD
District No.: 26-01-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Brighton Senior High:
Reconstruction               0-003-018  08/26/05   10                     1,410,000   DDJ



GATES CHILI CSD
District No.: 26-04-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Gates Chili High:
Additions and Alterations    0-001-011  12/22/04   02 - 16                        0   DDJ

Florence Brasser:
Reconstruction               0-002-009  12/22/04   2,4,7,8,9,14,155,15,           0   DDJ
Reconstruction               0-002-010  11/21/05   13,155,15,16                   0   DDJ

Washington Irving School:
Additions and Alterations    0-005-009  12/22/04   02 - 16                        0   DDJ
Reconstruction               0-005-010  11/21/05   10,155,15,16                   0   DDJ

Middle School:
Additions and Alterations    0-006-007  12/22/04   02 - 16                        0   DDJ
Reconstruction               0-006-008  11/21/05   10,155,15,16                   0   DDJ

Paul Rd Elementary:
Reconstruction               0-007-010  12/22/04   2,10,155,15,16                 0   DDJ
Reconstruction               0-007-011  11/21/05   10,155,15,16                   0   DDJ

Walt Disney School:
Additions and Alterations    0-008-009  12/22/04   02 - 16                        0   DDJ
Reconstruction               0-008-010  11/21/05   10,155,15,16                   0   DDJ

Neil Armstrong Elementary:
Additions and Alterations    0-009-009  12/22/04   02 - 16                        0   DDJ
Reconstruction               0-009-010  11/21/05   10,155,15,16                   0   DDJ

:
New Construction             0-017-001  12/07/05   02 - 16                        0   DDJ

Administration Building:
Reconstruction               1-003-006  12/22/04   2,4,9,155,15,16                0   DDJ

Trans.& Facilities Complex:
Reconstruction               5-004-007  12/22/04   2,4,7,8,9,155,15,16            0   DDJ

New Transportation Building:
New Construction             5-016-001  12/22/04   02 - 16                4,647,830   DDJ



GREECE CSD
District No.: 26-05-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Greece Olympia High School:
Reconstruction               0-004-025  12/20/05   10                             0   HCM

Odyssey Mid/High (fmly Hoover):
Reconstruction               0-005-016  12/20/05   2,10,155,15,16                 0   HCM

Paddy Hill School:
Reconstruction               0-007-012  12/20/05   8,9,10,155,15,16               0   HCM

West Ridge School:
Reconstruction               0-008-011  12/20/05   10,16                          0   HCM

Arcadia High/Middle School:
Reconstruction               0-012-029  12/20/05   2,7,8,9,10,155,15,16           0   HCM

Holmes Road Elementary:
Reconstruction               0-016-006  12/20/05   2,7,10,15                      0   HCM

Athena Middle/High School:
Reconstruction               0-017-029  12/20/05   2,7,8,9,10,155,15,16           0   HCM

Kirk Road Elem.:
Reconstruction               0-018-014  12/20/05   10                             0   HCM

Apollo Middle School:
Reconstruction               0-031-016  12/20/05   2,8,10                         0   HCM

Pine Brook Elementary:
Reconstruction               0-036-004  12/20/05   10                             0   HCM

Bldg Grounds/Bus Storage:
Reconstruction               5-024-008  12/20/05   8,9,155,15,16                  0   HCM



EAST IRONDEQUOIT CSD
District No.: 26-08-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Bishop Kearney High School:
Reconstruction               8-015-L01  02/17/05                                  0   RDR



WEST IRONDEQUOIT CSD
District No.: 26-08-03-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Irondequoit High School:
Reconstruction               0-001-020  03/14/05   8                        404,400   RDR
Reconstruction               0-001-021  04/19/05   16                         3,500   RDR

Ruben Dake JH School 7-8:
Reconstruction               0-002-008  03/14/05   8                        195,600   RDR
Reconstruction               0-002-009  04/19/05   9,16                      23,500   RDR

Rogers/Southlawn School:
Reconstruction               0-003-010  04/19/05   16                         3,500   RDR

Iroquois/Colebrook School:
Reconstruction               0-004-008  04/19/05   10,16                     88,800   RDR

Seneca Elem School K-3:
Reconstruction               0-006-005  04/19/05   9,10,16                      500   RDR

New Listwood School:
Reconstruction               0-027-002  04/19/05   16                           500   RDR

New Brookview Elementary:
Reconstruction               0-028-002  04/19/05   16                           500   RDR

New Briarwood Elementary:
Reconstruction               0-029-002  04/19/05   16                           500   RDR

Colebrook:
Reconstruction               0-032-002  04/19/05   16                           500   RDR



HILTON CSD
District No.: 26-11-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

West Avenue Elementary:
Reconstruction               0-001-009  11/23/05   2,8,9,155,15,16                0   RDR

Northwood Elementary School:
Reconstruction               0-003-010  11/23/05   2,8,9,16                       0   RDR

Village Elementary:
Reconstruction               0-004-008  11/23/05   2,8,15,16                      0   RDR

Merton Williams Middle School:
Reconstruction               0-005-009  11/23/05   2,4,8,10,15,16                 0   RDR

High School:
Reconstruction               0-007-010  11/23/05   2,4,8,10,155,15,16             0   RDR

Transportation Maint. Facility:
Reconstruction               5-010-010  11/23/05   2,8,16                         0   RDR



PENFIELD CSD
District No.: 26-12-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Indian Landing Elementary:
Reconstruction               0-002-008  08/25/05   2,4,7,8,9,10,13,155,           0   RDR

Penfield Senior High:
Reconstruction               0-005-011  03/24/05   2                        100,000   RDR
Additions and Alterations    0-005-012  08/25/05   02 - 16                        0   RDR

Cobbles Elementary:
Reconstruction               0-006-010  08/25/05   2,4,7,8,9,10,13,155,           0   RDR

Scribner Rd Elem:
Reconstruction               0-007-008  08/25/05   2,4,7,8,9,10,13,155,           0   RDR

Bay Trail Junior High School:
Additions and Alterations    0-008-008  08/12/05   02 - 16                        0   RDR

Harris Hill Elementary:
Reconstruction               0-009-011  08/12/05   2,4,7,8,9,10,13,155,           0   RDR

District Office:
Additions and Alterations    1-001-005  08/25/05   02 - 16                        0   RDR

Maintenance Bldg:
Additions and Alterations    3-004-002  08/25/05   02 - 16                        0   RDR

:
New Construction             3-026-001  09/28/05   02 - 16                        0   RDR

Bus Garage:
Additions and Alterations    5-010-004  08/25/05   02 - 16                        0   RDR

:
New Construction             5-027-001  09/28/05   02 - 16                        0   RDR
New Construction             7-025-001  08/22/05   02 - 16                        0   RDR



FAIRPORT CSD
District No.: 26-13-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

J. Perrin Middle School:
Reconstruction               0-001-011  07/06/05   7                              0   DDJ

Minerva Deland HS (9-12):
Reconstruction               0-002-015  07/06/05   7                              0   DDJ

Martha Brown Middle School:
Reconstruction               0-003-011  06/24/05   7                              0   DDJ

Brooks Hill Elem (K-5):
Reconstruction               0-004-010  07/06/05   7                              0   DDJ
Additions and Alterations    0-004-011  07/06/05   02 - 16                        0   DDJ

Jefferson Ave Elem (K-5):
Reconstruction               0-006-012  07/06/05   7                              0   DDJ
Additions and Alterations    0-006-013  07/06/05   02 - 16                        0   DDJ

Fairport HS (9-12):
Additions and Alterations    0-007-013  07/06/05   02 - 16                        0   DDJ

Northside Elem (3-5):
Additions and Alterations    0-008-006  07/06/05   02 - 16                        0   DDJ
Reconstruction               0-008-007  06/24/05   7                              0   DDJ

Dudley Elem (K-2):
Reconstruction               0-009-010  06/24/05   2,4,8,9,155,15,16              0   DDJ
Reconstruction               0-009-011  07/06/05   7                              0   DDJ

Streppa Building:
Additions and Alterations    1-005-003  06/30/05   02 - 16                        0   DDJ

New Administration Office Bldg.:
Reconstruction               1-023-003  07/06/05   2,7,8,9,155,15,16              0   DDJ

Maintenance Bldg.:
Reconstruction               3-011-003  07/06/05   2,8,9,155,15,16                0   DDJ

Bus Center:
Reconstruction               5-010-009  04/12/05   2,155,16                 100,000   DDJ
Additions and Alterations    5-010-010  07/06/05   02 - 16                        0   DDJ

:
New Construction             5-024-001  06/27/05   02 - 16                        0   DDJ
New Construction             7-025-001  06/27/05   02 - 16                        0   DDJ

Press Box @ Fairport High School:
New Construction             7-026-001  06/27/05   02 - 16                        0   DDJ



EAST ROCHESTER UFSD
District No.: 26-13-13-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

E. Rochester Educ. Cmplx.(O'Bourn):
Additions and Alterations    0-001-015  04/06/05   02 - 16                        0   RDR

Morgan Middle School:
Reconstruction               0-002-009  12/05/05   2,4,7,9                        0   JOD

Lois E. Bird Elementary:
Reconstruction               0-003-008  11/02/05   2,4,7,9                        0   JOD



PITTSFORD CSD
District No.: 26-14-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Jefferson Rd. Elementary:
Reconstruction               0-002-021  05/26/05   155,15,16                112,000   JOD

Pittsford High Sch. (Mendon):
Reconstruction               0-009-019  05/26/05   15                             0   JOD



ROCHESTER CITY SCHOOLS
District No.: 26-16-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

#2 Clara Barton K-6:
Reconstruction               0-002-014  07/27/05   2,4,9,16                       0   RDR

#3 Nathaniel Rochester Cmmty K-8:
Reconstruction               0-003-015  07/27/05   8,9,155,16                     0   RDR

#4 G.M.Forbes K-6:
Reconstruction               0-004-018  07/27/05   4,8,9,155,15,16                0   RDR

#5 J.Williams K-5:
Reconstruction               0-005-020  07/28/05   2,4,7,8,9,155,15,16            0   RDR

#6 Dag Hammarskjold K-6:
Reconstruction               0-006-016  07/28/05   4,8,9                          0   RDR

#7 Virgil Grissom K-6:
Reconstruction               0-007-015  07/28/05   2,8,9,155,15,16          795,000   RDR

#28 Henry Hudson K-6:
Reconstruction               0-028-020  07/28/05   4,9,155,15,16                  0   RDR

#29 Adlai Stevenson K-6:
Reconstruction               0-029-019  07/28/05   2,8,9                          0   RDR

#30 Gen E.S.Otis K-6:
Reconstruction               0-030-019  07/28/05   2,8,9,16                       0   RDR

Dr. Freddie Thomas Lrng. Ctr.:
Reconstruction               0-031-008  07/28/05   2,4,7,8,9,155,16               0   RDR

Audubon K-6:
Reconstruction               0-033-019  07/28/05   2,4,7,8,9,155,15,16            0   RDR

#39 A.J.Townson K-6:
Reconstruction               0-039-015  07/28/05   2,8,155,16                     0   RDR

#42 Abelard Reynolds K-6:
Reconstruction               0-042-013  01/14/05   155,15,16                      0   RDR

#46 C.Carroll K-6:
Reconstruction               0-046-018  07/28/05   7,10                           0   RDR

Franklin HS 9-12:
Reconstruction               0-101-026  08/01/05   4,8,9,155,15,16                0   RDR

Charlotte M.S. 6-8:
Reconstruction               0-102-025  07/28/05   9,10,155,15,16         1,580,000   RDR

East High School  9-12:
Reconstruction               0-103-024  04/08/05   2,9                      500,000   RDR
Reconstruction               0-103-025  07/28/05   2,4,9,155,15,16                0   RDR

Jefferson M.S. 6-8:
Reconstruction               0-105-022  08/01/05   2,4,8,9,155,15,16              0   RDR

Edison Tech/Occ H.S. 9-12:
Reconstruction               0-111-022  07/28/05   9,155,15,16                    0   RDR

Service Station:
Reconstruction               0-117-002  12/29/04   4,8,9,16                       0   RDR

Central Office:
Reconstruction               1-053-010  08/01/05   4,7                            0   RDR

Trans. Bldg. @ Service Center:
Reconstruction               5-078-105  08/01/05   2                              0   RDR

Recreation Bldg:
Reconstruction               7-058-001  07/27/05   2,4,8,9,15,16                  0   RDR

Rochester Bus. Institute-RBI Tutoria:
Reconstruction               8-121-004  10/14/05   2,8,9,155,15,16                0   RDR



RUSH HENRIETTA CSD
District No.: 26-17-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Roth Middle School:
Reconstruction               0-003-021  09/02/05   2,4,7,8,9,155,15,16            0   HCM

David Crane Elementary:
Reconstruction               0-009-016  03/03/05   7                        703,500   HCM

Burger Middle School:
Additions and Alterations    0-010-012  09/02/05   02 - 16                        0   HCM

Rush Henrietta Sperry School:
Additions and Alterations    0-011-024  09/02/05   02 - 16                        0   HCM



BROCKPORT CSD
District No.: 26-18-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Middle School:
Reconstruction               0-001-012  04/06/05   2,4,7,8,9,15,16        1,238,591   JOD

E. Barclay Elementary School:
Reconstruction               0-002-011  04/06/05   2,4,7,8,9,10,13,14,1   1,918,568   JOD

J. Ginther Elementary:
Reconstruction               0-004-010  04/06/05   2,8,155,15,16            448,443   JOD

Senior High School:
Reconstruction               0-007-019  04/06/05   2,4,9,10,155,15,16     2,596,362   JOD

Fred Hill Intermediate School:
Reconstruction               0-010-012  04/06/05   2,7,8,9,155,15,16        969,320   JOD

New Storage Bldg.:
Reconstruction               2-012-002  04/06/05   2                         79,641   JOD

Buildings & Grounds Facility:
Reconstruction               3-011-003  04/06/05   2                         79,641   JOD

Bus Garage(see 1-003):
Reconstruction               5-003-009  04/06/05   2,16                      48,173   JOD



WEBSTER CSD
District No.: 26-19-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Spry MS 7-9:
Additions and Alterations    0-001-009  07/26/05   02 - 16                        0   JOD

Klem Road North Elementary:
Additions and Alterations    0-003-007  07/26/05   02 - 16                        0   JOD

Plank Road North Elementary:
Additions and Alterations    0-009-009  07/26/05   02 - 16                        0   JOD

hewitt Road Elementary:
Additions and Alterations    0-010-006  07/26/05   02 - 16                        0   JOD

Thomas MS 7-9:
Additions and Alterations    0-011-019  07/26/05   02 - 16                        0   JOD

State Road Elementary:
Additions and Alterations    0-012-008  07/26/05   02 - 16                        0   JOD

Schroeder HS 10-12:
Reconstruction               0-013-018  07/26/05   2,8,9,10,155,15,16             0   JOD

Plank Road South Elementary:
Additions and Alterations    0-016-005  07/26/05   02 - 16                        0   JOD

Klem Road South Elementary:
Additions and Alterations    0-017-005  07/26/05   02 - 16                        0   JOD

Schlegel Road Elementary:
Additions and Alterations    0-018-005  07/26/05   02 - 16                        0   JOD

Maintenance Storage Building:
Additions and Alterations    2-015-002  09/28/05   02 - 16                        0   JOD

Bus Garage Annex:
Reconstruction               5-007-004  09/28/05   2,7,8,9,155,15,16              0   JOD

New Bus Garage:
Reconstruction               5-028-002  09/28/05   2,9                            0   JOD



WHEATLAND CHILI CSD
District No.: 26-20-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Thomas J. Connor Elementary:
Reconstruction               0-002-010  03/22/05   2,7,8,9,15,16          1,649,500   RDR

Junior Senior High School:
Reconstruction               0-003-010  03/22/05   2,7,8,9,10,155,15,16   5,929,700   RDR

Bus Garage:
Reconstruction               5-004-005  03/22/05   2,4,7,8,9,155,15,16    1,417,800   RDR



BOCES MONROE II-ORLEANS
District No.: 26-92-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

:
Reconstruction               8-047-L01  07/19/05                                  0   JOD
Temporary Quarters           8-048-001  10/21/05                                  0   JOD

***MONTGOMERY COUNTY***


AMSTERDAM CITY SCHOOLS
District No.: 27-01-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Wilbur H Lynch Middle School:
Reconstruction               0-028-022  05/31/05   155,15                         0   HCM

Administration Bldg.:
Reconstruction               1-001-003  12/21/05   13,16                          0   HCM



FONDA FULTONVILLE CSD
District No.: 27-06-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

K-4 Elementary:
Reconstruction               0-002-002  03/22/05   2,9,13,155,15,16       2,500,000   DDJ

***NASSAU COUNTY***


GLEN COVE CITY SCHOOLS
District No.: 28-01-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Middle School:
Reconstruction               0-003-007  01/07/05   8,9,155,15,16                  0   RDR
Reconstruction               0-003-008  03/11/05   10,155,16              3,169,450   RDR
Reconstruction               0-003-009  12/14/05   10,16                          0   RDR

Deasy School:
Reconstruction               0-005-006  01/07/05   8,9,155,15,16                  0   RDR
Reconstruction               0-005-007  03/11/05   10,155,16              1,362,921   RDR

Connolly Elementary School:
Reconstruction               0-007-010  01/07/05   8,155,15,16                    0   RDR
Additions and Alterations    0-007-011  02/17/05   02 - 16                  381,277   RDR
Additions and Alterations    0-007-011  02/17/05   02 - 16                  381,277   RDR
Reconstruction               0-007-012  03/11/05   10,155,16                100,090   RDR
Reconstruction               0-007-013  12/14/05   10,16                          0   RDR

Landing Elementary School:
Reconstruction               0-008-010  01/07/05   8,9,155,15,16                  0   RDR
Additions and Alterations    0-008-011  02/17/05   02 - 16                        0   RDR
Additions and Alterations    0-008-011  02/17/05   02 - 16                        0   RDR
Additions and Alterations    0-008-011  02/17/05   02 - 16                  505,266   RDR
Reconstruction               0-008-012  03/11/05   10,155,16                168,770   RDR

Glen Cove High School:
Reconstruction               0-010-007  01/07/05   8,9,155,15,16                  0   RDR
Reconstruction               0-010-008  03/11/05   10,155,16              3,296,453   RDR
Reconstruction               0-010-009  12/14/05   10,16                          0   RDR

Eugene J. Gribbin Elementary:
Reconstruction               0-013-006  01/07/05   8,9,155,15,16                  0   RDR
Reconstruction               0-013-007  03/11/05   10,155,16                155,281   RDR
Reconstruction               0-013-008  12/14/05   10,16                          0   RDR

Thayer House:
Reconstruction               1-001-004  01/07/05   8,9,155,15,16                  0   RDR
Reconstruction               1-001-005  03/11/05   10,155,16                 35,400   RDR

Carriage House:
Reconstruction               1-002-002  03/11/05   10,155,16                  9,928   RDR

Bus Garage:
Reconstruction               5-009-001  01/10/05   8,9,155,16                     0   RDR
Reconstruction               5-009-002  03/11/05   10,155,16                 28,579   RDR



HEMPSTEAD UFSD
District No.: 28-02-01-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Senior High School:
Reconstruction               0-020-020  11/10/05   4,13                           0   JOD
Reconstruction               0-020-021  11/21/05   4,13                           0   JOD



UNIONDALE PUBLIC SCHOOLS
District No.: 28-02-02-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Northern Parkway School:
Reconstruction               0-002-025  03/03/05   2,4,10,16                 34,000   RDR
Reconstruction               0-002-026  09/14/05   4,8,9,16                       0   RDR
Reconstruction               0-002-027  10/21/05   2,4,8,9                        0   RDR

California Avenue Elementary:
Reconstruction               0-003-028  10/21/05   2,4,7,9,16                     0   RDR

Smith Street School:
Reconstruction               0-004-021  01/10/05   4,8                            0   RDR
Reconstruction               0-004-022  10/21/05   2,9                            0   RDR

Cornelius Court School:
Reconstruction               0-005-011  10/21/05   2,4,8,9                        0   RDR

Grand Avenue School:
Reconstruction               0-006-019  02/17/05   2,4,10,16                 34,000   RDR

Walnut Street Elementary:
Reconstruction               0-007-022  10/21/05   2,8,9,15,16                    0   RDR

Lawrence Road Junior High:
Reconstruction               0-008-026  10/21/05   2,4,9                          0   RDR

Uniondale High School:
Additions and Alterations    0-009-040  09/14/05   02 - 16                        0   RDR
Reconstruction               0-009-041  10/21/05   2,4,7,9,16                     0   RDR

Turtle Hook Junior High:
Reconstruction               0-010-022  10/21/05   2,7,8,9,15,16                  0   RDR



EAST MEADOW UFSD
District No.: 28-02-03-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Parkway Elementary:
Reconstruction               0-001-026  11/17/05   2,7,9                          0   DDJ

Meadowbrook Elementary:
Reconstruction               0-002-024  11/17/05   2,9                            0   DDJ

W T Clarke Middle/High School:
Reconstruction               0-004-034  04/21/05   2,4                       65,000   DDJ
Reconstruction               0-004-035  11/17/05   2,10                           0   DDJ

Barnum Woods Elementary:
Reconstruction               0-006-025  11/17/05   2,9                            0   DDJ

East Meadow High School:
Reconstruction               0-007-036  11/17/05   2,8,9,10                       0   DDJ

Woodland Middle School:
Reconstruction               0-009-029  11/17/05   2,9,16                         0   DDJ

George McVey Elementary:
Reconstruction               0-011-021  11/17/05   2,9                            0   DDJ

Bowling Green #1:
Reconstruction               0-012-023  11/17/05   2,9,10                         0   DDJ



NORTH BELLMORE UFSD
District No.: 28-02-04-02
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Jacob Gunther Elementary:
Reconstruction               0-001-017  01/05/05   2,13                      90,326   HCM

Martin Avenue:
Reconstruction               0-002-011  01/05/05   4,7                      360,750   HCM

Newbridge Road School:
Reconstruction               0-003-020  01/05/05   8,9,155,15,16             48,174   HCM

Park Avenue School:
Reconstruction               0-004-016  01/05/05   7                         67,250   HCM

Saw Mill Road School:
Reconstruction               0-005-022  01/05/05   2,7                            0   HCM

J.G. Dinkelmeyer Elementary:
Reconstruction               0-006-017  01/05/05   2,4,15                   149,850   HCM
Reconstruction               0-006-018  05/04/05   2,7                      401,500   HCM



LEVITTOWN UFSD
District No.: 28-02-05-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Jonas E. Salk MS/HS:
Reconstruction               0-002-018  09/02/05   2,9,155,15,16                  0   RDR

Division Avenue High School:
Reconstruction               0-003-016  09/02/05   2,16                           0   RDR

Horizon School (Laurel Ln.):
Reconstruction               0-007-005  09/06/05   2                              0   RDR

Northside School:
Reconstruction               0-008-011  09/02/05   13                             0   RDR

Wisdom Lane Middle School:
Reconstruction               0-011-016  09/02/05   2,7,13,16                      0   RDR

East Broadway:
Reconstruction               0-014-012  09/02/05   2                              0   RDR

Abbey Lane School:
Reconstruction               0-015-013  08/29/05   2,155,15,16                    0   RDR

General Douglas MacArthur HS:
Reconstruction               0-018-021  09/02/05   16                             0   RDR



ROOSEVELT UFSD
District No.: 28-02-08-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

High School Renovation:
Reconstruction               0-005-016  05/12/05   4,9,14,155,16                  0   RDR
Reconstruction               0-005-017  05/12/05   155,16                         0   RDR
Reconstruction               0-005-018  05/12/05   16                             0   RDR
Reconstruction               0-005-019  08/24/05   14,15,16                 850,000   RDR



FREEPORT UFSD
District No.: 28-02-09-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Freeport Memorial Library:
Reconstruction               6-008-005  10/27/05   7,155                          0   HCM



BALDWIN UNION FREE SD
District No.: 28-02-10-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Brookside Elementary:
Reconstruction               0-001-010  03/11/05   16                             0   DDJ
Reconstruction               0-001-011  03/11/05   2,155                     75,000   DDJ
Reconstruction               0-001-012  03/11/05   155,16                   658,300   DDJ
Reconstruction               0-001-013  12/06/05   16                             0   DDJ
Reconstruction               0-001-014  12/06/05   2                              0   DDJ
Reconstruction               0-001-015  12/06/05   2,15,16                        0   DDJ

Lenox School:
Reconstruction               0-005-012  03/11/05   16                             0   DDJ
Reconstruction               0-005-013  12/06/05   155,15,16                      0   DDJ
Reconstruction               0-005-014  12/06/05   2,15                           0   DDJ
Reconstruction               0-005-015  12/06/05   16                             0   DDJ

Milburn School:
Reconstruction               0-006-012  03/11/05   16                             0   DDJ
Reconstruction               0-006-013  12/06/05   16                             0   DDJ
Reconstruction               0-006-014  12/06/05   2,15,16                        0   DDJ
Reconstruction               0-006-015  12/06/05   9                              0   DDJ
Reconstruction               0-006-016  12/06/05   155,15,16                      0   DDJ

Plaza Elementary:
Reconstruction               0-007-015  03/11/05   16                             0   DDJ
Reconstruction               0-007-016  12/06/05   16                             0   DDJ
Reconstruction               0-007-017  12/06/05   2,15                           0   DDJ

Baldwin Senior High School:
Reconstruction               0-009-023  03/11/05   13,16                          0   DDJ
Reconstruction               0-009-024  03/11/05   2,155                    125,000   DDJ
Reconstruction               0-009-025  03/11/05   155,16                 1,138,475   DDJ
Reconstruction               0-009-026  08/10/05   16                       396,303   DDJ
Reconstruction               0-009-027  08/11/05   14,16                          0   DDJ
Reconstruction               0-009-027  12/06/05   8                              0   DDJ
Reconstruction               0-009-028  12/06/05   2,16                           0   DDJ
Reconstruction               0-009-029  12/06/05   16                             0   DDJ

Shubert Elementary:
Reconstruction               0-010-014  12/06/05   16                             0   DDJ
Reconstruction               0-010-015  12/06/05   2,15                           0   DDJ
Reconstruction               0-010-016  12/06/05   9                              0   DDJ

Steele Elementary:
Reconstruction               0-011-016  03/11/05   16                             0   DDJ
Reconstruction               0-011-017  12/06/05   16                             0   DDJ
Reconstruction               0-011-018  12/06/05   2,15,16                        0   DDJ
Reconstruction               0-011-019  12/06/05   155,16                         0   DDJ

Baldwin Middle School:
Reconstruction               0-012-019  03/11/05   16                             0   DDJ
Reconstruction               0-012-020  07/26/05   16                       320,727   DDJ
Reconstruction               0-012-021  12/06/05   8                              0   DDJ
Reconstruction               0-012-022  12/06/05   16                             0   DDJ

Meadow Elementary School:
Reconstruction               0-013-015  03/11/05   155,16                   681,000   DDJ
Reconstruction               0-013-016  03/11/05   2                         87,555   DDJ
Reconstruction               0-013-017  12/06/05   16                             0   DDJ
Reconstruction               0-013-018  12/06/05   2,15                           0   DDJ
Reconstruction               0-013-019  12/06/05   155                            0   DDJ

District Office:
Reconstruction               1-002-008  12/06/05   2,155                          0   DDJ
Reconstruction               1-002-008  12/06/05   155,15,16                      0   DDJ

District Wide:
Reconstruction               7-999-003  06/29/05   16                             0   DDJ



MALVERNE UFSD
District No.: 28-02-12-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Malverne Senior High:
Reconstruction               0-001-010  01/19/05   10,15,16                  50,000   DDJ
Reconstruction               0-001-011  01/19/05   155,15,16                404,560   DDJ
Reconstruction               0-001-012  08/11/05   2,16                           0   HCM

H.T. Herber Middle School:
Reconstruction               0-002-012  01/19/05   155,15,16              1,053,935   DDJ

M W Downing School:
Reconstruction               0-003-008  01/19/05   155,15,16                637,060   DDJ

Davison Ave School:
Reconstruction               0-004-007  01/19/05   155,15,16                355,975   DDJ

:
New Construction             7-029-001  10/03/05   02 - 16                        0   DDJ



VALLEY STREAM 13 UFSD
District No.: 28-02-13-02
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

James A. Dever School:
Reconstruction               0-001-022  07/20/05   7                        184,000   JOD

Howell Road School:
Reconstruction               0-002-012  07/20/05   7                         67,000   JOD
Reconstruction               0-002-013  07/20/05   16                        72,000   JOD

District Wide:
Reconstruction               7-999-003  07/20/05   16                       125,000   JOD



HEWLETT-WOODMERE UFSD
District No.: 28-02-14-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Recreation Building:
Reconstruction               0-007-005  03/23/05   15                         7,665   RDR



LAWRENCE UFSD
District No.: 28-02-15-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

New Peninsula Library:
Reconstruction               6-029-002  05/12/05   2                              0   HCM
Reconstruction               6-029-003  08/22/05   2                              0   HCM



ELMONT UFSD
District No.: 28-02-16-02
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Clara H Carlson School:
Reconstruction               0-002-018  10/19/05   16                             0   HCM



GARDEN CITY UFSD
District No.: 28-02-18-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Garden City Jr. High:
Reconstruction               0-006-011  12/29/04   2,10,13,15,16                  0   RDR
Reconstruction               0-006-012  12/29/04   8,9,13,15,16             250,000   RDR

Garden City Sr. High:
Reconstruction               0-007-012  12/29/04   8,9,13,15,16             250,000   RDR
Reconstruction               0-007-013  05/02/05   8,9,13,155,15,16               0   RDR

Field House @ Athletic Field:
New Construction             7-020-001  12/29/04   02 - 16                        0   RDR



EAST ROCKAWAY UFSD
District No.: 28-02-19-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Junior Senior High School:
Reconstruction               0-001-023  04/06/05   7                         47,200   DDJ
Additions and Alterations    0-001-024  04/06/05   02 - 16               10,527,801   DDJ
Reconstruction               0-001-025  04/06/05   2,8,9,155,15,16                0   DDJ

Centre Ave School:
Reconstruction               0-003-013  04/06/05   2,4,8,9,155,15,16              0   DDJ



LYNBROOK UFSD
District No.: 28-02-20-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

South Lynbrook Middle:
Reconstruction               0-002-013  04/11/05   16                             0   DDJ

West End Elementary:
Reconstruction               0-006-018  04/11/05   16                        50,000   DDJ



ROCKVILLE CENTRE UFSD
District No.: 28-02-21-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Southside Middle:
Reconstruction               0-002-016  04/07/05   2,7                      268,151   JOD
Reconstruction               0-002-017  08/22/05   4                        615,989   JOD
Reconstruction               0-002-018  08/23/05   8                        777,357   JOD

Wilson Elementary:
Reconstruction               0-004-017  08/23/05   8                        395,094   JOD
Reconstruction               0-004-018  08/23/05   4                        454,382   JOD
Reconstruction               0-004-019  08/23/05   4                              0   JOD

South Side Senior High:
Reconstruction               0-005-020  04/07/05   2,7,8                  1,148,645   JOD
Reconstruction               0-005-021  08/23/05   4                        138,840   JOD
Reconstruction               0-005-022  08/23/05   8                      1,097,038   JOD

Hewitt School:
Reconstruction               0-007-012  04/07/05   2,4,7                    539,907   JOD
Reconstruction               0-007-013  08/23/05   4                        439,318   JOD
Reconstruction               0-007-014  08/23/05   8                        503,170   JOD

Administration Bldg:
Reconstruction               1-006-005  08/23/05   4                        119,295   JOD



FLORAL PARK-BELLEROSE UFSD
District No.: 28-02-22-02
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

John Lewis Childs School:
Reconstruction               0-001-020  04/06/05   2,9                       13,400   HCM

Floral Pk-Bellerose School:
Reconstruction               0-002-021  04/06/05   2,9,10,16                106,600   HCM



VALLEY STREAM 24 UFSD
District No.: 28-02-24-02
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

William L. Buck School:
Reconstruction               0-001-011  07/13/05   7                        260,610   JOD

Robert W. Carbonaro:
Reconstruction               0-004-012  07/13/05   7                        144,102   JOD



MERRICK UFSD
District No.: 28-02-25-02
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

 Norman J. Levy Lakeside School (ES):
Reconstruction               0-001-023  05/31/05   155,15,16                781,287   DDJ

Chatterton Elementary:
Reconstruction               0-002-026  05/31/05   155,15,16                668,026   DDJ

Birch Elementary:
Reconstruction               0-003-022  05/31/05   155,15,16                796,520   DDJ

Merrick Library Wing:
Reconstruction               6-004-002  01/07/05   4,7,8,9,10,155,15,16     579,000   DDJ
Reconstruction               6-004-003  08/26/05   7,8,9,155,15,16                0   DDJ



NORTH MERRICK UFSD
District No.: 28-02-29-02
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

North Merrick Public Library:
Reconstruction               6-003-005  07/21/05   7,9,155,15,16            209,875   HCM



VALLEY STREAM CENTRAL H.S. DISTRICT
District No.: 28-02-51-07
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Central High School:
Reconstruction               0-001-030  04/19/05   4,10                     324,000   JOD
Reconstruction               0-001-031  06/29/05   4                         27,000   JOD

Memorial Junior High School:
Reconstruction               0-002-027  06/29/05   7                         32,400   JOD

North High School:
Reconstruction               0-003-027  06/29/05   4,16                     102,600   JOD



SEWANHAKA CSD
District No.: 28-02-52-07
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Sewanhaka High School:
Reconstruction               0-002-032  06/29/05   4,14,15,16                     0   RDR
Reconstruction               0-002-033  12/01/05   14,16                          0   RDR

Floral Park Memorial High:
Reconstruction               0-003-032  06/29/05   8                              0   RDR

Hyde Park Memorial High:
Reconstruction               0-004-030  06/29/05   10                             0   RDR

Elmont Memorial High School:
Reconstruction               0-006-035  06/29/05   2,7,16                         0   RDR



BELLMORE-MERRICK CSD
District No.: 28-02-53-07
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Grand Ave Jr. High School:
Reconstruction               0-001-025  12/19/05   8,9,10,15,16                   0   RDR

Merrick Ave Jr. High School:
Reconstruction               0-003-031  12/19/05   8,9,10,16                      0   RDR

Calhoun High School:
Reconstruction               0-004-042  12/19/05   8,9,10,15,16                   0   RDR

Mepham High School:
Reconstruction               0-005-041  12/19/05   8,9,10,15,16                   0   RDR

Kennedy High School:
Reconstruction               0-007-029  12/19/05   2,8,9,10,16                    0   RDR



LONG BEACH CITY SCHOOL DISTRICT
District No.: 28-03-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

High  School:
Reconstruction               0-011-033  07/22/05   2,10,16                        0   RDR



WESTBURY UFSD
District No.: 28-04-01-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Drexel Elementary:
Reconstruction               0-001-014  02/01/05   10,16                    286,394   RDR

Westbury Middle/Jr High 6-8:
Reconstruction               0-002-018  02/01/05   10,16                    690,375   RDR

Powell's Lane Elementary:
Reconstruction               0-005-014  02/01/05   10,155,16              1,146,371   RDR

Westbury High School:
Reconstruction               0-007-019  02/01/05   10,16                    769,428   RDR

Park Avenue School:
Reconstruction               0-010-014  02/01/05   10,16                    377,226   RDR

Dryden St ES(K/Pre Sch):
Reconstruction               0-012-013  02/01/05   10,16                    284,798   RDR

Administration Building:
Reconstruction               1-003-007  02/01/05   10,16                    223,351   RDR

(The Star Center) Facility Building:
Reconstruction               3-004-004  02/01/05   10,16                     23,406   RDR



ROSLYN UFSD
District No.: 28-04-03-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

East Hills School:
Reconstruction               0-001-017  03/24/05   2,4,7                    475,000   DDJ

Roslyn High School:
Reconstruction               0-002-022  03/24/05   4                              0   DDJ
Reconstruction               0-002-023  03/24/05   8,9,10,16                      0   DDJ
Reconstruction               0-002-024  03/24/05   2,4,7                  1,500,000   DDJ
Reconstruction               0-002-025  10/14/05   2,8,9,10,155,15,16             0   DDJ
Reconstruction               0-002-026  10/28/05   2,16                           0   DDJ

Roslyn Middle School:
Reconstruction               0-006-018  03/24/05   2,4                      434,000   DDJ
Reconstruction               0-006-019  04/08/05   2,15                      40,000   DDJ

Roslyn Heights Elementary:
Reconstruction               0-007-015  03/24/05   2,4,7                    325,000   DDJ

Harbor Hill Elementary:
Reconstruction               0-009-014  03/24/05   2,4,7                    340,000   DDJ
Additions and Alterations    0-009-015  03/24/05   02 - 16                        0   DDJ
Additions and Alterations    0-009-016  10/14/05   02 - 16                        0   DDJ

Maintenance Building:
Reconstruction               3-003-004  03/24/05   2,7                      100,000   DDJ



PORT WASHINGTON UFSD
District No.: 28-04-04-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Paul D Schreiber High School:
Reconstruction               0-001-021  03/21/05   2                              0   HCM

F.E. Guggenheim Elementary:
Reconstruction               0-010-024  07/05/05   2                         75,000   HCM



NEW HYDE PARK-GARDEN CITY UFSD
District No.: 28-04-05-02
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Garden City Park School:
Reconstruction               0-001-016  12/19/05   4                              0   DDJ

New Hyde Park Road School:
Reconstruction               0-004-015  11/21/05   4,7,9                          0   DDJ



MANHASSET PUBLIC SCHOOLS
District No.: 28-04-06-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Portable #1 @ Munsey Park ES:
New Construction             0-027-001  12/13/05   02 - 16                        0   RDR

Portable #2 @ Munsey Park ES:
New Construction             0-028-001  12/13/05   02 - 16                        0   RDR

Portable #3 @ Munsey Park ES:
New Construction             0-029-001  12/13/05   02 - 16                        0   RDR



GREAT NECK UFSD
District No.: 28-04-07-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Lakeville Elementary:
Reconstruction               0-010-016  11/18/05   10,16                          0   HCM

North Middle School:
Reconstruction               0-011-020  11/18/05   10,16                          0   HCM

Saddle Rock School:
Reconstruction               0-015-016  11/18/05   10,16                          0   HCM

South Senior High:
Reconstruction               0-018-013  11/21/05   10,16                          0   HCM



MINEOLA UFSD
District No.: 28-04-10-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Meadow Drive School:
Reconstruction               0-001-009  03/16/05   16                       490,646   HCM
Reconstruction               0-001-010  12/21/05   2,155,16                       0   HCM

Hampton St. Elementary:
Reconstruction               0-003-016  12/21/05   2,7,155,16                     0   HCM

Jackson Ave. Elementary:
Reconstruction               0-004-017  12/21/05   2,155,16                       0   HCM

Mineola Middle School:
Reconstruction               0-005-019  05/31/05   2,4,7,8,9,10,14,155,           0   HCM
Reconstruction               0-005-020  12/21/05   4,8,9,155,16                   0   HCM

Mineola High School:
Reconstruction               0-007-012  03/16/05   8                              0   HCM
Reconstruction               0-007-013  12/21/05   2,4,8,9,155,16                 0   HCM

Cross Street Elementary:
Reconstruction               0-015-015  12/21/05   2,155,16                       0   HCM



CARLE PLACE UFSD
District No.: 28-04-11-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

MS/HS:
Reconstruction               0-001-031  03/17/05   2,4,8,9,10,155,15,16   2,011,850   DDJ



NORTH SHORE CSD
District No.: 28-05-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

North Shore Middle School:
Reconstruction               0-001-018  12/07/05   2,9,10,155,15,16               0   RDR

North Shore High School:
Reconstruction               0-004-020  12/07/05   4,7                            0   RDR

Districtwide:
Reconstruction               7-999-002  03/24/05   16                       803,301   RDR



SYOSSET CSD
District No.: 28-05-02-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Syosset High School:
Reconstruction               0-010-030  03/16/05   2,13                     302,818   HCM
Reconstruction               0-010-031  12/21/05   2,8,9,10,15,16                 0   DDJ



OYSTER BAY-EAST NORWICH CSD
District No.: 28-05-06-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Administration Building:
Reconstruction               1-006-003  04/06/05   13                       100,000   DDJ



JERICHO UFSD
District No.: 28-05-15-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Jericho MS/HS:
Reconstruction               0-003-032  03/18/05   2,7                      300,000   JOD
Reconstruction               0-003-033  03/18/05   2,7                            0   JOD

Jericho Public Library:
Reconstruction               6-013-005  04/19/05   155                      100,000   JOD



HICKSVILLE UFSD
District No.: 28-05-17-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Burns Avenue Elementary:
Reconstruction               0-001-016  01/14/05   8,9,16                    51,785   DDJ
Reconstruction               0-001-017  06/29/05   2,4,9,10,16                    0   DDJ

Dutch Lane School:
Reconstruction               0-002-015  01/14/05   2,8,9,16                  37,625   DDJ
Reconstruction               0-002-016  06/29/05   16                             0   DDJ

East Street Elementary:
Reconstruction               0-003-014  01/14/05   2,15,16                  103,840   DDJ
Reconstruction               0-003-015  01/14/05   8,9,16                    22,757   DDJ
Reconstruction               0-003-016  06/29/05   16                             0   DDJ

Fork Lane School:
Reconstruction               0-004-016  01/14/05   8,9,16                    49,425   DDJ
Reconstruction               0-004-017  06/29/05   16                             0   DDJ

Lee Avenue School:
Reconstruction               0-005-016  01/14/05   2,8,9,16                  54,637   DDJ
Reconstruction               0-005-017  06/29/05   2,4,8,9,10,16                  0   DDJ

Old Country Rd. School:
Reconstruction               0-007-014  01/14/05   8,9,16                    49,425   DDJ
Reconstruction               0-007-015  06/29/05   16                             0   DDJ

Woodland Avenue School:
Reconstruction               0-008-015  01/14/05   8,9,16                    55,796   DDJ
Reconstruction               0-008-016  06/29/05   16                             0   DDJ

Hicksville Middle School:
Reconstruction               0-009-024  06/29/05   2,4,8,9,10,155,15,16           0   DDJ
Reconstruction               0-009-025  06/29/05   16                        80,000   DDJ
Reconstruction               0-009-026  11/29/05   4                              0   DDJ

Hicksville High School:
Reconstruction               0-010-027  12/29/04   2,4                            0   DDJ
Reconstruction               0-010-028  01/14/05   2,9,16                   300,876   DDJ
Reconstruction               0-010-029  06/29/05   2,4,8,9,16                     0   DDJ



PLAINEDGE UFSD
District No.: 28-05-18-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Sylvia Packard Jr High School:
Reconstruction               0-012-011  06/29/05   2                              0   JOD



BETHPAGE UFSD
District No.: 28-05-21-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Bethpage High School:
Reconstruction               0-001-021  07/22/05   2,8,9,10,155,16                0   JOD

John F. Kennedy Middle School:
Reconstruction               0-002-019  07/22/05   2,4,7,8,9,10,155,15,           0   JOD

Central Blvd Elementary:
Reconstruction               0-003-015  07/22/05   2,4,7,8,9,10,155,15,           0   JOD

Kramer Lane Elementary:
Reconstruction               0-004-011  07/22/05   2,4,7,8,9,10,155,15,           0   JOD

Charles Campagne Elementary:
Reconstruction               0-007-014  07/22/05   2,4,7,8,9,10,155,15,           0   JOD



MASSAPEQUA UFSD
District No.: 28-05-23-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

McKenna Elem. (f'ly JHS):
Reconstruction               0-008-025  04/06/05   2                        232,000   JOD

Ames Campus:
Reconstruction               0-009-015  02/01/05   7,9                      161,250   JOD

Massapequa High School:
Reconstruction               0-010-027  02/01/05   2,8,9,155,16             638,000   JOD
Reconstruction               0-010-028  02/01/05   2,4,7,8,9,155,15,16            0   JOD



BOCES NASSAU ADMINISTRATIVE CENTER
District No.: 28-90-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Rosemary Kennedy Ctr Bldg:
Reconstruction               0-017-015  08/01/05   7                      1,460,470   JOD

:
Reconstruction               8-146-L01  08/09/05                                  0   JOD

*** COUNTY***



District No.: 38-02-10-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________
Reconstruction               0-009-026  07/14/05   16                       396,303   DDJ

***NIAGARA COUNTY***


NIAGARA FALLS CITY SCHOOLS
District No.: 40-08-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

DeVeauz Campus Administration Comple:
Temporary Quarters           1-048-001  04/06/05                                  0   HCM

St. Joseph's:
Temporary Quarters           8-046-001  03/11/05                                  0   HCM

St. Stanislaus School:
Temporary Quarters           8-047-001  03/11/05                                  0   HCM



NORTH TONAWANDA SCHOOLS
District No.: 40-09-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Meadow Dr ES K-5/NT HS 9-12:
Reconstruction               0-015-011  06/29/05   2,155,15,16              198,189   JOD
Reconstruction               0-015-012  07/06/05   2,8                            0   JOD



STARPOINT CSD
District No.: 40-10-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Main Building(JR/SR):
Reconstruction               0-001-017  03/24/05   2,7,155,15,16            760,500   DDJ

Fricano Elementary School:
Reconstruction               0-002-006  03/24/05   2,7                      117,000   DDJ

***ONEIDA COUNTY***


CAMDEN CSD
District No.: 41-06-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Middle School:
Additions and Alterations    0-001-020  03/23/05   02 - 16               10,890,000   HCM
Additions and Alterations    0-001-020  03/23/05   02 - 16               10,890,000   HCM

Camden Elementary:
Reconstruction               0-003-015  03/23/05   2,8,9,155,15,16                0   HCM

Camden High School:
Reconstruction               0-012-016  03/23/05   2,8,10,155,15,16         789,700   HCM

Bus Maintenance Facility:
Additions and Alterations    5-008-006  03/23/05   02 - 16                        0   HCM



NEW HARTFORD CSD
District No.: 41-15-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Oxford Rd. ES/SHS:
Reconstruction               0-005-014  12/21/05   2,4,9,10,155,15,16             0   HCM

Hughes Elementary:
Reconstruction               0-006-010  12/21/05   2,4,7,8,9,10,155,15,           0   HCM

Robert E. Myles Elementary:
Reconstruction               0-007-010  12/21/05   2,7,155,15,16                  0   HCM

Ralph W. Perry Jr. High:
Reconstruction               0-008-008  12/21/05   2,7,9,155,15,16                0   HCM

Office @ 29 Oxford Rd.:
Temporary Quarters           1-014-001  01/05/05                                  0   HCM



ROME CITY SCHOOLS
District No.: 41-18-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Strough Junior High:
Reconstruction               0-012-019  06/29/05   2,8,9,155,15,16          223,000   JOD

New High School:
Reconstruction               0-026-002  03/14/05   2,8,9,10,16              170,000   JOD



WATERVILLE CSD
District No.: 41-19-02-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Memorial Park School:
Reconstruction               0-003-010  03/17/05   2,8,9,16                       0   DDJ

MS/High School:
Additions and Alterations    0-008-009  03/17/05   02 - 16                        0   DDJ

Bus Garage:
Additions and Alterations    5-001-006  03/17/05   02 - 16                        0   DDJ



UTICA CITY SCHOOLS
District No.: 41-23-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

M. L. King School:
Additions and Alterations    0-016-007  12/13/05   02 - 16                        0   HCM



ORISKANY CSD
District No.: 41-29-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Junior Senior High:
Reconstruction               0-004-009  03/03/05   2,4,8,9,10,155,15,16   1,334,000   JOD

N. Walbran Elementary:
Reconstruction               0-005-008  03/11/05   2,4,8,9,155,15,16      1,166,000   JOD

***ONONDAGA COUNTY***


WEST GENESEE CSD AT CAMILLUS
District No.: 42-01-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Press Box @ High School-Old Field:
Reconstruction               7-008-001  12/22/04   8                         20,500   JOD

 Existing Concession Stand:
Additions and Alterations    7-011-002  03/29/05   02 - 16                  101,000   JOD

Locker Rooms & Storage:
New Construction             7-018-001  12/22/04   02 - 16                  421,500   JOD



NORTH SYRACUSE CSD
District No.: 42-03-03-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Storage Bldg. @ Roxboro Rd. M. S.:
New Construction             2-045-001  04/13/05   02 - 16                   75,000   HCM

Maintenance Bldg 1:
Additions and Alterations    3-033-009  06/29/05   02 - 16                        0   HCM

Transportation Bus Bldg.#7:
Reconstruction               5-037-010  08/22/05   155,16                   442,200   HCM



EAST SYRACUSE-MINOA CSD
District No.: 42-04-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Pine Grove Middle:
Additions and Alterations    0-023-004  08/11/05   02 - 16                        0   HCM



WESTHILL CSD
District No.: 42-07-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Onondaga Hill School:
Reconstruction               0-001-006  06/29/05   2                         40,500   RDR

Cherry Road School:
Reconstruction               0-003-006  06/29/05   2                         40,500   RDR



FAYETTEVILLE-MANLIUS CSD
District No.: 42-10-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Wellwood Middle:
Additions and Alterations    0-003-010  03/23/05   02 - 16                  521,450   HCM
Reconstruction               0-003-011  08/25/05   8,16                           0   HCM

Fayetteville Elementary:
Reconstruction               0-004-010  08/25/05   8,16                           0   HCM

Mott Road Elementary:
Reconstruction               0-006-009  08/25/05   8,16                           0   HCM

Fayetteville-Manlius High:
Reconstruction               0-007-019  08/25/05   8,16                           0   HCM

Enders Road Elementary:
Reconstruction               0-009-010  03/23/05   2,13,16                  156,550   HCM
Reconstruction               0-009-011  08/25/05   8,16                           0   HCM

Eagle Hill Middle School:
Reconstruction               0-010-011  08/25/05   8,16                           0   HCM

Office Building:
Additions and Alterations    1-014-003  06/29/05   02 - 16                  106,625   HCM
Reconstruction               1-014-004  08/25/05   8,16                           0   HCM

Transportation Shop Bus Garage:
Reconstruction               5-002-004  10/28/05   8,16                           0   HCM

Transportation Office:
Reconstruction               7-001-003  10/28/05   8,16                           0   HCM

New Maintenance Center:
Reconstruction               7-022-002  08/25/05   8,16                           0   HCM



ONONDAGA CSD
District No.: 42-12-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Junior Senior High School:
Additions and Alterations    0-001-009  12/14/05   02 - 16                        0   DDJ

Wheeler ES K-6:
Reconstruction               0-002-010  12/05/05   2,4,8,9,10,155,15,16           0   DDJ

Industrial Arts Bldg:
Reconstruction               0-003-003  12/05/05   2,4,7,155,15,16                0   DDJ

Rockwell ES K-2:
Reconstruction               0-004-006  12/14/05   2,4,8,9,10,155,16              0   DDJ
Reconstruction               0-004-903  12/05/05   2,4,8,9,10,155,16              0   DDJ

District Office:
Reconstruction               2-009-002  04/06/05   7                              0   DDJ

Bus Garage:
Reconstruction               5-005-004  12/05/05   2,13,16                        0   DDJ



LIVERPOOL CSD
District No.: 42-15-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Nate Perry Elementary:
Reconstruction               0-007-007  04/11/05   2,4,7,8,9,155          5,435,506   DDJ
Reconstruction               0-007-008  04/12/05   2,4,7,8,9,155,16               0   DDJ
Reconstruction               0-007-008  10/27/05   8,15                           0   DDJ

Long Branch Rd Elementary:
Reconstruction               0-009-008  11/21/05   155                            0   DDJ

Donlin Drive Elementary:
Reconstruction               0-010-010  11/21/05   155                            0   DDJ

Alt.Ed.@ Craven Crawford Admin Bldg:
Reconstruction               0-012-005  10/27/05   7                              0   DDJ

Hickory St. Bldg.:
Reconstruction               3-006-004  10/27/05   7                              0   DDJ

TC Bus Svc. & Office Bldg.:
Reconstruction               5-008-003  02/15/05   2,4,7,8,9,155,15,16    5,704,844   DDJ



LYNCOURT UFSD
District No.: 42-15-04-02
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

K-8 School:
Reconstruction               0-002-006  01/28/05   155                       55,000   JOD
Reconstruction               0-002-007  10/19/05   4,7,8,9,10,155,15,16           0   JOD



SKANEATELES CSD
District No.: 42-16-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

High School/Middle School:
Reconstruction               0-001-016  04/27/05   2,4                      127,500   JOD

Waterman Elementary School:
Reconstruction               0-007-008  04/27/05   2,9                      122,000   JOD



SYRACUSE CITY SCHOOL DISTRICT
District No.: 42-18-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

William Beard:
Reconstruction               0-005-007  03/23/05   2,155,15,16              290,000   RDR

Huntington Elem./Middle School:
Reconstruction               0-017-011  03/23/05   2,155,15,16              291,500   RDR

Ed Smith Elementary:
Reconstruction               0-022-013  03/23/05   2,155,15,16              254,000   RDR

Webster School:
Reconstruction               0-027-006  03/23/05   2,155,15,16              264,000   RDR

Lincoln Middle School:
Reconstruction               0-105-009  03/23/05   2,155,16                 247,500   RDR

George Fowler High School:
Reconstruction               0-122-022  03/23/05   2,155,16                 297,000   RDR

:
New Construction             2-152-001  06/15/05   02 - 16                   27,000   RDR

School Service Ctr.:
Reconstruction               3-002-002  03/23/05   2,155,15,16              258,500   RDR

:
New Construction             7-151-001  07/14/05   02 - 16                   82,500   RDR

St. John's School:
Reconstruction               8-131-L02  02/08/05                                  0   RDR



BOCES ONONDAGA-CORTLAND-MADISON
District No.: 42-90-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

McEvoy Education Center:
Reconstruction               0-001-010  04/06/05   2,9,155,15,16                  0   JOD

Henry Center Bldg. A:
Reconstruction               0-008-010  04/12/05   7                        150,655   JOD

***ONTARIO COUNTY***


EAST BLOOMFIELD CSD
District No.: 43-05-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Jr. Sr. High School:
Reconstruction               0-001-010  03/11/05   2,8,9,155,15,16          495,256   DDJ
Reconstruction               0-001-011  09/20/05   10,16                          0   DDJ

Elementary School:
Reconstruction               0-006-010  03/11/05   2,4,7,8,9,10,155,15,   1,043,915   DDJ
Reconstruction               0-006-011  03/11/05   2,8,9,155,15,16                0   DDJ

Bus Garage/Admin.:
Reconstruction               5-002-007  01/03/05   2,4,7                    144,769   DDJ
Reconstruction               5-002-008  03/11/05   2,8,9,155,15,16           72,027   DDJ



GORHAM-MIDDLESEX CSD
District No.: 43-09-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Marcus Whitman Jr/Sr High:
Reconstruction               0-012-013  10/07/05   2,8,10,155,15,16       3,135,440   HCM

:
New Construction             2-017-001  08/09/05   02 - 16                   83,160   HCM

Cumming Nature Center:
Reconstruction               8-016-L01  06/08/05                                  0   HCM



PHELPS CLIFTON SPRINGS CSD
District No.: 43-13-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

District Maintenance Facility:
Discovered Building          3-015-001  02/17/05                                  0   DDJ



VICTOR CSD
District No.: 43-17-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Jr/Sr High(fmly Sr. High):
Additions and Alterations    0-005-013  04/08/05   02 - 16               14,468,500   DDJ

Intermediate:
Reconstruction               0-008-007  04/08/05   2,4,7,8,9,10,155,15,   1,786,000   DDJ

Health & Wellness Center:
New Construction             0-027-001  03/14/05   02 - 16                        0   DDJ

Bus Storage Facility:
New Construction             4-028-001  04/08/05   02 - 16                  267,011   DDJ



BOCES WAYNE-FINGER LAKES
District No.: 43-90-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Finger Lakes Educ. Center:
Reconstruction               0-001-014  07/20/05   8,155,15,16                    0   JOD

Alt. HS Flint Campus(Admin):
Reconstruction               0-002-004  07/20/05   155,15,16                      0   JOD

Occup. Center/Williamson:
Reconstruction               0-014-013  03/24/05   2,4,16                         0   JOD
Reconstruction               0-014-014  07/20/05   155,15,16                      0   JOD

Education Center Williamson:
Reconstruction               0-025-004  07/20/05   155,15,16                      0   JOD

Voc Training/Alt HS FL:
Reconstruction               0-027-003  07/20/05   155,15,16                      0   JOD

Techniplex III - Suite 2:
Temporary Quarters           8-051-001  02/04/05                                  0   JOD

***ORANGE COUNTY***


WASHINGTONVILLE CSD
District No.: 44-01-02-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Washingtonville 5/6 School:
Reconstruction               0-001-012  06/17/05   2,9,10,13                      0   JOD

Taft Elementary School:
Reconstruction               0-002-010  07/11/05   2,10                           0   JOD

Little Britain Elementary:
Reconstruction               0-004-011  07/11/05   2,10                           0   JOD

Senior High School:
Reconstruction               0-007-013  07/11/05   2,7,10                         0   JOD

Round Hill Elementary:
Reconstruction               0-008-010  07/11/05   2,7,10                         0   JOD



CORNWALL CSD
District No.: 44-03-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Baseball Field Dugouts:
New Construction             7-016-001  12/22/04   02 - 16                        0   HCM



GOSHEN CSD
District No.: 44-06-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Main St. Panelfab:
Reconstruction               7-009-001  10/19/05   2,10,15,16                     0   RDR



HIGHLAND FALLS CSD
District No.: 44-09-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Ft. Montgomery Elementary:
Reconstruction               0-005-005  01/18/05   2,15                     556,000   JOD

James O'Neill High School:
Reconstruction               0-008-010  03/02/05   10                       130,000   JOD
Reconstruction               0-008-011  06/07/05   2,10,16                  253,605   JOD



MIDDLETOWN CITY SCHOOLS
District No.: 44-10-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Twin Towers Middle School (JHS):
Reconstruction               0-001-022  04/19/05   4                              0   HCM

Districtwide:
Reconstruction               7-999-001  04/19/05                                  0   HCM



MINISINK VALLEY CSD
District No.: 44-11-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Slate Hill ES/MS:
Reconstruction               0-001-005  07/05/05   2,4,8,14,155,15,16             0   HCM

:
New Construction             0-021-001  08/26/05   02 - 16                        0   HCM

New Pole Barn #2:
New Construction             2-022-001  09/28/05   02 - 16                        0   HCM



MONROE WOODBURY CSD
District No.: 44-12-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Pine Tree Elementary:
Reconstruction               0-006-004  03/18/05   2                              0   JOD

Smith Clove Elem.(fmly Cent.Valley):
Reconstruction               0-012-005  07/11/05   16                       353,100   JOD

Sapphire Lake Elementary School:
Reconstruction               0-015-004  02/17/05   2,15                     638,000   JOD



KIRYAS JOEL VILLAGE UFSD
District No.: 44-12-02-02
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Kiryas Joel Public School:
New Construction             0-013-001  02/18/05   02 - 16                        0   DDJ



VALLEY CSD
District No.: 44-13-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Maybrook Elementary School:
Reconstruction               0-002-010  04/06/05   7                              0   JOD

Montgomery Elementary:
Reconstruction               0-004-012  04/25/05   7                              0   JOD

Walden Elementary School:
Reconstruction               0-009-014  04/06/05   7                              0   JOD

East Coldenham Elementary:
Reconstruction               0-013-013  04/25/05   7,16                     856,213   JOD

Valley Central High School:
Reconstruction               0-015-017  04/06/05   7                              0   JOD

Valley Middle School:
Reconstruction               0-016-016  04/06/05   7                              0   JOD

Berea Elementary:
Reconstruction               0-017-009  04/06/05   16                             0   JOD



NEWBURGH CITY SCHOOLS
District No.: 44-16-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Newburgh Free Academy:
Reconstruction               0-001-014  01/19/05   2,4,7,8,9,10,155,15,           0   RDR

North Junior High School:
Reconstruction               0-002-010  01/19/05   2,4,7,8,9,10,155,15,           0   RDR

South Junior High School:
Reconstruction               0-003-012  01/19/05   2,4,7,9,10,155,15,16           0   RDR
Reconstruction               0-003-013  10/05/05   7                              0   RDR

Chestnut Street:
Additions and Alterations    0-005-004  01/19/05   02 - 16                        0   RDR

Gidney Ave Memorial School:
Reconstruction               0-006-008  01/19/05   2,8,9,10,155,15,16             0   RDR

The Primary School:
Reconstruction               0-009-006  01/19/05   2,7,8,9,10,14,155,15           0   RDR

West Street School:
Reconstruction               0-010-006  01/19/05   2,4,7,8,9,10,14,155,           0   RDR

Horizons on the Hudson:
Reconstruction               0-017-010  01/19/05   2,4,7,8,9,10,155,15,           0   RDR

Vails Gate Elementary:
Reconstruction               0-018-006  01/19/05   2,7,8,9,10,14,155,15           0   RDR

New Windsor School:
Reconstruction               0-022-005  01/19/05   2,4,7,8,9,10,14,155,   8,780,150   RDR

New Balmville School:
Reconstruction               0-023-009  01/19/05   2,7,8,9,10,155,15,16   7,630,000   RDR

Meadow Hill School:
Reconstruction               0-035-009  01/19/05   2,4,7,8,9,10,155,15,           0   RDR

Temple Hill School:
Reconstruction               0-036-009  01/19/05   2,4,7,8,9,10,155,15,           0   RDR

Heritage Junior High School:
Reconstruction               0-039-006  01/19/05   2,9,16                         0   RDR

Stewart Airport Bldg. 105:
Reconstruction               8-042-002  01/19/05   2,4,7,8,9,10,155,15,           0   RDR



PORT JERVIS CITY SCHOOLS
District No.: 44-18-00-05
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Bus Garage:
Reconstruction               5-002-004  10/20/05   10,16                          0   DDJ



WARWICK VALLEY CSD
District No.: 44-21-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Warwick Valley Public Library:
Reconstruction               6-021-002  08/22/05   9,16                      56,380   DDJ
Reconstruction               6-021-003  08/24/05   9,155,16                       0   DDJ

New Library:
New Construction             6-024-001  02/04/05   02 - 16                        0   DDJ



GREENWOOD LAKE UFSD
District No.: 44-21-11-02
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Greenwood Lake School:
Reconstruction               0-002-008  08/23/05   15                             0   HCM

:
Reconstruction               7-999-001  08/25/05   16                             0   HCM



BOCES ORANGE-ULSTER
District No.: 44-90-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Chester HS @ Chester UFSD:
Reconstruction               8-033-002  02/23/05   7                        575,500   JOD
Reconstruction               8-033-003  11/02/05   155,16                         0   JOD

***ORLEANS COUNTY***


KENDALL CSD
District No.: 45-06-07-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Athletic/Track Storage Building:
Discovered Building          2-007-001  02/15/05                                  0   RDR

***OSWEGO COUNTY***


HANNIBAL CSD
District No.: 46-07-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Fairley Elementary:
Reconstruction               0-003-013  04/15/05   2,4,7,8,9,155,15,16    3,600,000   JOD



MEXICO CSD
District No.: 46-09-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Palermo Elementary School:
Reconstruction               0-002-009  07/22/05   2,15,16                  146,834   HCM



OSWEGO CITY SCHOOLS
District No.: 46-13-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Middle School:
Reconstruction               0-001-013  07/18/05   2,13                      75,000   JOD



BOCES OSWEGO
District No.: 46-90-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

North 520 (Bus Garage Maint):
Reconstruction               5-004-002  08/29/05   2,9,155,15,16                  0   JOD

Lease @ Oswego Co. Airport:
Temporary Quarters           8-049-001  09/02/05                                  0   JOD

***OTSEGO COUNTY***


MORRIS CSD
District No.: 47-12-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Morris Central School:
Reconstruction               0-001-008  12/01/05   7,9,155,15,16                  0   DDJ



COOPERSTOWN CSD
District No.: 47-17-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Elementary School:
Reconstruction               0-002-008  12/30/04   2,4,7,16               1,027,400   RDR
Additions and Alterations    0-002-009  07/05/05   02 - 16                        0   RDR

Junior/Senior High School:
Reconstruction               0-006-006  01/03/05   2,4,7,9,16             1,997,600   RDR
Additions and Alterations    0-006-007  07/05/05   02 - 16                        0   RDR

Bus Storage:
New Construction             4-012-001  07/05/05   02 - 16                        0   RDR

Bus Garage:
Reconstruction               5-003-008  07/05/05   2                              0   RDR

:
New Construction             5-011-001  07/05/05   02 - 16                        0   RDR



WORCESTER CSD
District No.: 47-25-06-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Main Building:
Reconstruction               0-001-006  04/04/05   4,7,9,155,16             277,051   DDJ

***PUTNAM COUNTY***


MAHOPAC CSD
District No.: 48-01-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Fulmar Road Elementary:
Reconstruction               0-005-009  12/22/04   155,16                   233,450   RDR
Reconstruction               0-005-010  03/03/05   8,9,10,155,15,16               0   RDR

Mahopac Middle School:
Additions and Alterations    0-006-009  12/22/04   02 - 16                        0   RDR
Reconstruction               0-006-010  04/11/05   4,8,9,10,155,15,16       183,000   RDR



CARMEL CSD
District No.: 48-01-02-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

:
Reconstruction               8-016-L01  09/20/05                                  0   RDR



BREWSTER CSD
District No.: 48-06-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Henry G Wells Middle:
Reconstruction               0-001-015  01/18/05   4,9,13                   160,000   RDR
Reconstruction               0-001-016  01/18/05   10                             0   RDR

Garden Street School:
Reconstruction               0-002-008  01/18/05   10                             0   RDR

John F Kennedy Elementary:
Reconstruction               0-003-008  01/18/05   10                             0   RDR

Brewster High School:
Reconstruction               0-004-010  01/18/05   10                             0   RDR

Administration Bldg:
Reconstruction               1-005-005  01/18/05   10                             0   RDR

Bus Garage:
Reconstruction               5-006-005  01/18/05   10                             0   RDR

***RENSSELAER COUNTY***


BERLIN CSD
District No.: 49-01-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Stephentown Elementary:
Reconstruction               0-005-005  12/29/04   2,4,7,8,9,155,15,16            0   RDR

Berlin Elementary-Main Bldg.:
Additions and Alterations    0-007-008  12/29/04   02 - 16                        0   RDR

Grafton Elementary:
Reconstruction               0-008-004  12/29/04   2,4,7,8,9,155,15,16            0   RDR

Cherry Plain Jr/Sr High:
Reconstruction               0-009-005  12/29/04   2,4,7,8,9,155,15,16            0   RDR

Bus Garage:
Additions and Alterations    5-001-005  12/29/04   02 - 16                        0   RDR



EAST GREENBUSH CSD
District No.: 49-03-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Goff Middle School:
Reconstruction               0-001-009  03/23/05   10                        32,682   HCM

Green Meadow School:
Reconstruction               0-002-012  03/23/05   8,10                      32,682   HCM

Citizen Genet School:
Reconstruction               0-003-010  03/23/05   10,13                     56,213   HCM

Sutherland School:
Reconstruction               0-006-009  03/23/05   10,13                     71,900   HCM
Reconstruction               0-006-010  08/23/05   4                              0   HCM

Red Mill School:
Reconstruction               0-007-008  03/23/05   10                        15,687   HCM

Bell Top School:
Reconstruction               0-008-008  03/23/05   10                        19,609   HCM



LANSINGBURGH CSD
District No.: 49-06-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Lansingburgh Elementary:
Reconstruction               0-003-003  07/01/05   9,155,15,16                    0   HCM

Knickerbacker Junior High:
Reconstruction               0-006-006  06/30/05   8,9,155,15,16                  0   HCM

High School:
Additions and Alterations    0-010-012  06/30/05   02 - 16                        0   HCM

Rensselaer Park Elementary:
Reconstruction               0-014-006  07/01/05   2,8,9,155,15,16                0   HCM

Turnpike Elem School:
Reconstruction               0-015-006  07/01/05   2,8,9,155,15,16                0   HCM



NORTH GREENBUSH COMMON SCHOOL
District No.: 49-08-01-08
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Gardner Dickinson Sch. @ Wynantskill:
Temporary Quarters           8-006-001  11/08/05                                  0   JOD



AVERILL PARK CSD
District No.: 49-13-02-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

High School:
Reconstruction               0-001-006  05/20/05   2,9,10,155,16            275,500   HCM

Algonquin Middle:
Reconstruction               0-009-006  05/20/05   2,7                            0   HCM



HOOSIC VALLEY CSD
District No.: 49-14-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Elementary School:
Additions and Alterations    0-001-007  08/23/05   02 - 16                        0   HCM

High School:
Reconstruction               0-002-010  03/24/05   2,4,7                    221,000   HCM
Reconstruction               0-002-011  05/20/05   9,10,16                        0   HCM
Reconstruction               0-002-012  06/08/05   16                             0   HCM
Additions and Alterations    0-002-013  08/23/05   02 - 16                        0   HCM
Reconstruction               0-002-014  09/20/05   2,7,155,15,16                  0   HCM



SCHODACK CSD
District No.: 49-15-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Castleton Elementary:
Additions and Alterations    0-001-014  06/30/05   02 - 16                        0   DDJ

Maple Hill High School:
Reconstruction               0-002-017  06/22/05   2,4,7,8,9,155,15,16            0   DDJ

Middle School:
Reconstruction               0-004-010  06/30/05   2,4,7,8,9,155,15,16            0   DDJ

Bus Garage:
Reconstruction               5-005-007  06/30/05   2,13,15                        0   DDJ

District Wide:
Reconstruction               7-999-002  06/30/05   16                        50,000   DDJ



TROY CITY SCHOOLS
District No.: 49-17-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

School-14:
Reconstruction               0-006-005  12/29/04   7,8,9                    851,400   JOD

Troy High School:
Reconstruction               0-011-017  12/22/04   7,155,15,16              161,661   JOD
Reconstruction               0-011-018  12/22/04   14                             0   JOD
Reconstruction               0-011-019  08/09/05   2,4,7,8,9                      0   JOD

W. K. Doyle Middle School:
Reconstruction               0-012-011  08/09/05   2,8,9,155,15,16                0   JOD



BOCES QUESTAR III
District No.: 49-90-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Storage Shed @ Sackets School:
Discovered Building          2-073-001  03/30/05                                  0   JOD

***ROCKLAND COUNTY***


CLARKSTOWN CENTRAL SCHOOLS
District No.: 50-01-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Congers Elementary:
Additions and Alterations    0-001-010  09/13/05   02 - 16                        0   HCM

New City Elementary:
Reconstruction               0-003-011  12/21/05   2,155,15,16                    0   HCM

Little Tor Elementary School:
Reconstruction               0-004-011  12/21/05   2,155,15,16                    0   HCM

West Nyack Elementary School:
Reconstruction               0-006-014  12/21/05   2,155,15,16                    0   HCM

Bardonia Elementary School:
Reconstruction               0-007-009  04/19/05   2                              0   HCM
Reconstruction               0-007-010  06/09/05   2,9                            0   HCM
Reconstruction               0-007-011  07/13/05   2,15                           0   HCM
Reconstruction               0-007-012  12/21/05   2,9,155,15,16                  0   HCM

Laurel Plains Elementary:
Reconstruction               0-011-007  12/21/05   2,155,15,16                    0   HCM

Felix Festa Junior High:
Reconstruction               0-012-018  06/20/05   2,9                            0   HCM
Reconstruction               0-012-019  07/11/05   13                       244,000   HCM

Dina Link Elementary:
Reconstruction               0-013-011  07/11/05   2,9                            0   HCM

Senior High School South:
Reconstruction               0-018-015  08/22/05   9,14,16                   45,475   HCM

:
New Construction             7-030-001  09/13/05   02 - 16                        0   HCM

Districtwide-Elementary:
Reconstruction               7-999-006  08/29/05   16                             0   HCM



NANUET UFSD
District No.: 50-01-08-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Nanuet Senior High:
Reconstruction               0-003-016  06/08/05   2,9,16                   304,000   HCM



NORTH ROCKLAND/HAVERSTRAW-STONY PT
District No.: 50-02-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Railroad Avenue School (Alt. Ed. Bld:
Reconstruction               0-013-002  02/18/05   7                        154,250   HCM

North Rockland High School:
Reconstruction               0-016-020  05/31/05   10,16                          0   HCM
Reconstruction               0-016-021  07/21/05   10,16                          0   HCM

West Haverstraw Elementary:
Reconstruction               0-024-008  01/20/05   7                        948,000   HCM



SOUTH ORANGETOWN CSD
District No.: 50-03-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Press Box:
New Construction             7-018-001  02/04/05   02 - 16                        0   RDR

Field House:
New Construction             7-019-001  02/04/05   02 - 16                  259,895   RDR



NYACK UFSD
District No.: 50-03-04-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Nyack Jr. High School:
Reconstruction               0-004-005  04/13/05   2,10                      31,950   DDJ

Upper Nyack Elementary:
Reconstruction               0-007-011  05/11/05   2,10                      62,000   DDJ



PEARL RIVER UFSD
District No.: 50-03-08-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

New Storage Shed:
New Construction             2-016-001  02/18/05   02 - 16                        0   HCM



RAMAPO CSD
District No.: 50-04-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Suffern Middle School:
Reconstruction               0-002-020  06/29/05   2,4,8,9,155,16                 0   HCM

Suffern High School:
Reconstruction               0-020-024  06/29/05   2,8,9,10,155,15,16             0   HCM



EAST RAMAPO CSD
District No.: 50-04-02-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Spring Valley Senior High:
Reconstruction               0-003-014  07/21/05   155,16                 2,145,303   HCM

Admin. Bldg.(fmly S.Madison):
Reconstruction               0-005-010  07/21/05   8,155,16                 288,775   HCM

Hempstead School:
Reconstruction               0-006-010  07/21/05   13                             0   HCM
Reconstruction               0-006-011  07/21/05   8,155,16                 104,609   HCM

Pomona Middle(fmlyPomonaJR):
Reconstruction               0-008-013  07/21/05   8,155,16                 551,956   HCM

Hillcrest Elementary:
Reconstruction               0-011-009  07/21/05   8,155,16               1,868,763   HCM

Ramapo Fresh.Ctr.(frmlyKakiat):
Reconstruction               0-013-014  07/21/05   8,155,16                 345,075   HCM

Fleetwood Elementary School:
Reconstruction               0-014-012  07/21/05   8,155,16                 181,614   HCM

Summit Park Elementary:
Reconstruction               0-015-013  07/21/05   8,155,16                 232,945   HCM

Grandview Elementary:
Reconstruction               0-016-010  07/21/05   8,155,16                 189,508   HCM

Margetts Road Elementary:
Reconstruction               0-020-009  07/21/05   8,155,16                 314,752   HCM

Ramapo Senior High School:
Reconstruction               0-022-014  07/21/05   8,155,16                 520,188   HCM

Lime Kiln School:
Reconstruction               0-027-011  07/21/05   8,155,16                 173,963   HCM

Elmwood Elementary School:
Reconstruction               0-030-009  07/21/05   8,155,16                 141,324   HCM

Chestnut Ridge Middle(frmlySpring Va:
Reconstruction               0-034-016  07/21/05   8,155,16                 314,294   HCM

Eldorado Elementary:
Reconstruction               0-037-011  07/21/05   8,155,16                 108,081   HCM

Colton Elementary School:
Reconstruction               0-038-011  07/21/05   8,155,16                 128,219   HCM

Transportation Office:
Reconstruction               1-010-003  07/21/05   8,155,16                   7,231   HCM

Central Warehouse Bldg.:
Reconstruction               2-009-004  07/21/05   13                        16,610   HCM

Bldgs Grounds Bldg 1:
Reconstruction               3-002-007  07/21/05   8,155,16                  22,984   HCM

Transportation Garage:
Reconstruction               5-001-008  07/21/05   8,155,16                  64,684   HCM

Central Kitchen Bldg 1:
Reconstruction               7-017-003  07/21/05   8,155,16                  18,203   HCM

Central Kitchen Bldg 3:
Reconstruction               7-019-003  07/21/05   8,155,16                       0   HCM



BOCES ROCKLAND
District No.: 50-90-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

#3 Ctr Of Occ Educ:
Reconstruction               0-003-007  10/24/05   155,15,16                      0   JOD

Jessie J Kaplan #9:
Reconstruction               0-010-004  10/24/05   4,15                           0   JOD

:
Discovered Building          2-024-001  08/10/05                                  0   JOD

C Storage Trailer West:
Discovered Building          2-025-001  08/10/05                                  0   JOD

C Storage Trailer East:
Discovered Building          2-026-001  08/10/05                                  0   JOD

C Storage Trailer South:
Discovered Building          2-027-001  08/10/05                                  0   JOD

C Storage Trailer CTE:
Discovered Building          2-028-001  08/10/05                                  0   JOD

***ST LAWRENCE COUNTY***


MASSENA CSD
District No.: 51-20-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Louisville Elementary:
Reconstruction               0-003-005  07/13/05   2                              0   HCM

Madison Elementary:
Reconstruction               0-004-007  06/29/05   2                              0   HCM

Massena Senior High:
Reconstruction               0-008-006  06/29/05   2,15                           0   HCM



NORWOOD-NORFOLK CSD
District No.: 51-22-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

K-12 Building(fmly HS):
Reconstruction               0-001-011  03/17/05   2,4,10,13,155,15,16            0   DDJ

Bus Garage:
Reconstruction               5-004-004  03/17/05   10,16                     13,800   DDJ



OGDENSBURG CITY SCHOOLS
District No.: 51-23-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Free Academy:
Reconstruction               0-007-012  05/05/05   7                        162,360   RDR

Madill Elementary School:
Reconstruction               0-014-009  05/05/05   7                        543,906   RDR



POTSDAM CSD
District No.: 51-29-02-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Potsdam High School:
Additions and Alterations    0-001-012  09/23/05   02 - 16                        0   RDR

Lawrence Ave. Elementary:
Reconstruction               0-002-011  09/23/05   2,4,7,8,9,10,155,15,           0   RDR

Middle School:
Reconstruction               0-005-011  09/23/05   2,4,7,8,9,10,155,15,           0   RDR

Bus Garage:
Reconstruction               5-004-009  09/23/05   2,10,155,15,16                 0   RDR

:
New Construction             7-010-001  10/03/05   02 - 16                        0   RDR



EDWARDS-KNOX CSD
District No.: 51-31-02-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Central Building:
Reconstruction               0-004-006  09/02/05   15,16                     78,000   HCM
Reconstruction               0-004-007  09/02/05   2,15,16                  178,000   HCM



BOCES ST. LAWRENCE-LEWIS
District No.: 51-90-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Washington Ed. Ctr.(was 004):
Reconstruction               0-034-003  05/02/05   7                        283,140   JOD

Storage @ Richville Insurance Office:
Discovered Building          2-044-001  05/04/05                                  0   JOD

***SARATOGA COUNTY***


BURNT HILLS BALLSTON LAKE CSD
District No.: 52-01-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

:
Discovered Building          7-014-001  08/22/05                                  0   HCM



SHENENDEHOWA CSD
District No.: 52-03-02-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Arcadia-Gowana-Koda M.Schools:
Additions and Alterations    0-001-022  04/11/05   02 - 16                        0   RDR
Reconstruction               0-001-023  08/23/05   4                              0   RDR

Skano-Tesago E.S.:
Reconstruction               0-006-015  02/23/05   7                      1,578,000   RDR



CORINTH CSD
District No.: 52-04-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Oak Street Elem/High School:
Reconstruction               0-001-023  05/02/05   2,9,10,155,15,16               0   RDR



MECHANICVILLE CITY SCHOOLS
District No.: 52-12-00-05
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Middle School/High School:
Reconstruction               0-006-008  09/01/05   155,15,16                      0   DDJ
Reconstruction               0-006-009  09/20/05   155,15                         0   DDJ

Bus Garage:
Reconstruction               5-005-003  09/01/05   155,15,16                      0   DDJ



BALLSTON SPA CSD
District No.: 52-13-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Ballston Ave. Complex (HS/MS):
Reconstruction               0-001-025  06/08/05   10,16                     60,600   HCM

Malta Avenue School:
Reconstruction               0-002-018  06/08/05   7,10,16                   73,400   HCM

Wood Rd Complex(Prim. Middle):
Reconstruction               0-006-015  06/08/05   2,155,15                  63,500   HCM

Milton Terrace Primary:
Reconstruction               0-009-014  06/08/05   10,15                      5,000   HCM

Modular @ Middle School:
Temporary Quarters           0-021-001  02/17/05                                  0   HCM

New Bus Garage-Site B:
Reconstruction               5-015-002  06/08/05   7                         20,000   HCM



SCHUYLERVILLE CSD
District No.: 52-17-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Jr/Sr High School:
Additions and Alterations    0-001-012  12/01/05   02 - 16                        0   RDR

Elementary Sch K-6:
Reconstruction               0-002-010  01/11/05   2,8                            0   RDR
Additions and Alterations    0-002-011  12/01/05   02 - 16                        0   RDR

:
New Construction             7-013-001  12/01/05   02 - 16                        0   RDR



WATERFORD-HALFMOON UFSD
District No.: 52-21-01-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Main Building:
Reconstruction               0-004-018  06/02/05   10                       100,000   DDJ

***SCHENECTADY COUNTY***


DUANESBURG CSD
District No.: 53-01-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

High School:
Reconstruction               0-001-011  05/02/05   10,15,16                 100,000   JOD
Reconstruction               0-001-012  05/02/05   10,16                          0   JOD

Annex former Bus. Off. 1-003:
New Construction             0-003-001  04/05/05   02 - 16                        0   JOD
Reconstruction               0-003-002  07/11/05   2,4,8,9                        0   JOD



NISKAYUNA CSD
District No.: 53-03-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Van Antwerp Middle School:
Additions and Alterations    0-001-011  07/22/05   02 - 16                        0   JOD

Craig Elementary School:
Additions and Alterations    0-002-013  07/22/05   02 - 16                        0   JOD

Glencliff Elementary:
Additions and Alterations    0-003-010  07/22/05   02 - 16                        0   JOD

Rosendale Elementary:
Additions and Alterations    0-004-011  07/22/05   02 - 16                        0   JOD

High School:
Additions and Alterations    0-006-021  07/22/05   02 - 16                        0   JOD
Reconstruction               0-006-022  12/09/05   7                              0   JOD

Hillside Elementary:
Additions and Alterations    0-007-011  07/22/05   02 - 16                        0   JOD

Iroquois Middle School:
Additions and Alterations    0-008-013  07/22/05   02 - 16                        0   JOD

Birchwood Elementary:
Additions and Alterations    0-021-007  07/22/05   02 - 16                        0   JOD



ROTTERDAM-MOHONASEN CSD
District No.: 53-05-15-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Herman L Bradt Elementary:
Reconstruction               0-004-013  11/10/05   7                              0   RDR

***SCHOHARIE COUNTY***


GILBOA CONESVILLE CSD
District No.: 54-08-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Main Building:
Reconstruction               0-001-007  07/22/05   2,155,15,16               51,000   RDR



SCHOHARIE CSD
District No.: 54-12-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

High School:
Reconstruction               0-001-007  04/06/05   2,7,10                         0   RDR

Elementary School:
Reconstruction               0-002-006  04/06/05   2,7,10                         0   RDR

***SCHUYLER COUNTY***


WATKINS GLEN CSD
District No.: 55-03-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

:
Reconstruction               2-003-001  08/03/05   7                         75,000   DDJ



BOCES SCHUYLER-CHEMUNG-TIOGA
District No.: 55-90-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Bldg 5:
Reconstruction               0-005-012  08/11/05   7                        105,000   JOD

Bldg 6:
Reconstruction               0-006-012  08/11/05   7                        119,000   JOD

Bldg 7:
Reconstruction               0-007-008  08/11/05   7                        152,000   JOD

Bldg 8:
Reconstruction               0-008-005  08/11/05   2,4,7,8                  179,450   JOD

Building #9:
Reconstruction               1-017-002  08/12/05   155                       21,775   JOD

Administration Bldg #10:
Reconstruction               1-019-002  08/12/05   155                       21,775   JOD

***SENECA COUNTY***


SOUTH SENECA CSD
District No.: 56-05-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Ovid Jr/Sr High School:
Additions and Alterations    0-001-009  06/29/05   02 - 16                        0   HCM

Interlaken Elementary:
Reconstruction               0-004-009  06/29/05   2,4,7,8,9,10,155,15,           0   HCM

Bus Storage-Interlaken:
Additions and Alterations    4-007-004  07/13/05   02 - 16                        0   HCM

Bus Garage at Ovid:
Additions and Alterations    5-002-004  06/29/05   02 - 16                        0   HCM

***STEUBEN COUNTY***


ADDISON CSD
District No.: 57-01-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Valley Elementary School:
Additions and Alterations    0-004-009  07/11/05   02 - 16                        0   JOD

High School:
Additions and Alterations    0-005-009  07/11/05   02 - 16                        0   JOD

Tuscarora Elementary:
Additions and Alterations    0-006-009  07/11/05   02 - 16                        0   JOD

District Business Office:
Reconstruction               1-015-001  03/14/05   2,7,15                         0   JOD
Reconstruction               1-015-002  07/11/05   2,4,7,8,155,15,16              0   JOD

Bus Storage:
Reconstruction               4-002-004  07/11/05   155,15,16                      0   JOD

Bus Garage:
Reconstruction               5-001-005  06/15/05   155,15,16                      0   JOD



AVOCA CSD
District No.: 57-02-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Main Bldg:
Additions and Alterations    0-002-008  05/24/05   02 - 16                        0   JOD

Bus Maintenance:
Additions and Alterations    5-011-006  06/27/05   02 - 16                        0   JOD



CORNING-PAINTED POST SCHOOL DIST.
District No.: 57-10-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Fred Carder Elementary:
Reconstruction               0-005-016  01/03/05   4,7,9,155,16             455,450   HCM
Reconstruction               0-005-017  11/30/05   16                             0   HCM

Corning Academy M.S.:
Reconstruction               0-007-019  11/30/05   7,9,10,15,16                   0   HCM

Hugh W. Gregg Elementary:
Reconstruction               0-010-015  01/03/05   2,7,155,15,16            660,592   HCM
Reconstruction               0-010-016  11/30/05   8,9,16                         0   HCM

Lindley-Presho School:
Reconstruction               0-011-016  01/03/05   2,7,155,15,16            368,751   HCM
Reconstruction               0-011-017  11/30/05   7,15,16                        0   HCM

Northside Blodgett M.S.:
Reconstruction               0-013-017  11/30/05   9,15,16                        0   HCM

Phillips Elementary:
Reconstruction               0-016-014  11/30/05   7,15,16                        0   HCM

Frank F Pierce Elementary:
Reconstruction               0-017-009  11/30/05   9,16                           0   HCM

Wm E. Severn Elementary:
Reconstruction               0-018-012  01/03/05   2,4,7,9,155,15,16      1,181,542   HCM
Reconstruction               0-018-013  12/01/05   4,16                           0   HCM

Winfield Elementary School:
Reconstruction               0-021-012  01/03/05   2,7,155,15,16            412,502   HCM
Reconstruction               0-021-013  11/30/05   7,9,10,15,16                   0   HCM

East High School:
Reconstruction               0-023-026  11/30/05   7,8,10,16                      0   HCM

West High School:
Reconstruction               0-024-023  11/30/05   10,155,16                      0   HCM

Bus Garage:
Reconstruction               5-015-005  01/03/05   2,7                      202,416   HCM



CANISTEO-GREENWOOD CSD
District No.: 57-15-02-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

:
New Construction             2-025-001  12/01/05   02 - 16                        0   HCM



PRATTSBURGH CSD
District No.: 57-23-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Main Building:
Reconstruction               0-001-008  09/02/05   2,9,15                         0   HCM

Well House Building:
New Construction             7-010-001  02/04/05   02 - 16                        0   HCM



JASPER-TROUPSBURG CSD
District No.: 57-27-02-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Main Building Jasper:
Additions and Alterations    0-002-012  02/15/05   02 - 16                        0   RDR

New Bus Garage Storage:
Reconstruction               4-009-003  02/15/05   4,9,155,15,16                  0   RDR

Bus Garage Service:
Reconstruction               5-004-006  02/15/05   2,7,8,155,16                   0   RDR



HAMMONDSPORT CSD
District No.: 57-29-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Curtiss School:
Reconstruction               0-001-006  09/01/05   2,4                            0   RDR

High School:
Additions and Alterations    0-002-010  08/26/05   02 - 16                        0   RDR

Storage @ Curtis Elementary School:
Reconstruction               2-005-002  03/16/05   8,16                           0   RDR

:
New Construction             5-006-001  08/29/05   02 - 16                        0   RDR

***SUFFOLK COUNTY***


BABYLON UFSD
District No.: 58-01-01-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Junior-Senior High School:
Reconstruction               0-001-011  07/22/05   2,16                           0   HCM



NORTH BABYLON UFSD
District No.: 58-01-03-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

P.J. Brennan - Boces:
Reconstruction               0-009-009  12/29/04   2,4,7,8                4,495,736   DDJ



WYANDANCH UFSD
District No.: 58-01-09-02
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Wyandanch Memorial High School:
Reconstruction               0-004-013  07/22/05   15                        32,500   DDJ

Olive Middle School:
Reconstruction               0-005-014  07/22/05   15                        32,500   DDJ

Wyandanch Youth Center:
Temporary Quarters           8-009-001  02/04/05                                  0   DDJ



THREE VILLAGE CSD
District No.: 58-02-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Arrowhead Lane Elementary:
Reconstruction               0-007-016  07/01/05   4,155                     50,000   DDJ

Ward Melville Senior High:
Reconstruction               0-009-026  07/13/05   155                       60,000   DDJ



BROOKHAVEN-COMSEWOGUE UFSD
District No.: 58-02-03-02
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

John F Kennedy Jr. Middle:
Reconstruction               0-003-010  06/29/05   155                            0   DDJ
Additions and Alterations    0-003-011  11/23/05   02 - 16                        0   DDJ

Comsewogue Senior High School:
Reconstruction               0-010-013  04/21/05   155                            0   JOD
Additions and Alterations    0-010-014  11/23/05   02 - 16                        0   DDJ

New Field House:
New Construction             7-016-001  04/25/05   02 - 16                  250,000   JOD



MILLER PLACE UFSD
District No.: 58-02-08-02
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

No.Country Road MS(former ES):
Reconstruction               0-001-013  01/28/05   8,9,155,15,16                  0   DDJ

Sound Beach School:
Reconstruction               0-003-011  02/25/05   8,9,155,15,16                  0   DDJ

Miller Place High School:
Reconstruction               0-006-020  01/28/05   8,9,155,15,16                  0   DDJ
Reconstruction               0-006-021  01/28/05   8,9,155,15,16                  0   DDJ

Facilities Trailer:
Discovered Building          1-022-001  01/07/05                                  0   DDJ

Administration Building:
Discovered Building          1-025-001  01/07/05                                  0   DDJ

High School Field Storage Container:
Discovered Building          2-023-001  01/07/05                                  0   DDJ

North Country Barn:
Discovered Building          2-027-001  01/11/05                                  0   DDJ

Maintenance Barn:
Discovered Building          3-026-001  01/07/05                                  0   DDJ

Concession Stand/Storage Container:
Discovered Building          7-024-001  01/07/05                                  0   DDJ



ROCKY POINT UFSD
District No.: 58-02-09-02
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

District Office:
Temporary Quarters           1-010-001  01/05/05                                  0   DDJ



MIDDLE COUNTRY CSD
District No.: 58-02-11-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Oxhead Road Elementary:
Reconstruction               0-001-016  03/15/05   2,7,14,155,15,16               0   JOD

Holbrook Road Elementary:
Reconstruction               0-002-012  03/15/05   2,7,14,155,15,16               0   JOD

Unity Dr. Pre-K Kdgtn. Ctr.:
Reconstruction               0-003-011  03/15/05   2,7,8,9,14,155,15,16           0   JOD

Bicycle Path Pre-K Kdgtn. Ctr.:
Reconstruction               0-005-009  03/15/05   2,7,155,15,16                  0   JOD

Newfield High School:
Reconstruction               0-006-018  03/23/05   2,7,8,9,155,15,16              0   JOD

Dawnwood Middle School:
Reconstruction               0-008-016  03/23/05   2,7,9,14,155,15,16             0   JOD

Hawkins Path Elementary:
Reconstruction               0-009-008  03/15/05   2,7,8,14,155,15,16             0   JOD

Selden Middle School:
Reconstruction               0-010-015  03/15/05   2,7,9,155,15,16                0   JOD

North Coleman Elementary:
Reconstruction               0-011-012  03/15/05   2,7,9,155,15,16                0   JOD

Stagecoach Rd. Elementary:
Reconstruction               0-012-009  03/15/05   2,7,9,15,16                    0   JOD

Auer Elementary:
Reconstruction               0-013-011  03/15/05   2,7,9,155,15,16                0   JOD

Jericho Elementary:
Reconstruction               0-014-009  03/15/05   2,7,8,9,14,155,15,16           0   JOD

Centereach High School:
Reconstruction               0-015-016  03/23/05   2,7,8,9,155,15,16              0   JOD

New Lane Memorial Elementary:
Reconstruction               0-016-012  03/15/05   2,7,8,9,155,15,16              0   JOD

:
New Construction             7-031-001  09/28/05   02 - 16                  100,000   JOD



LONGWOOD CSD
District No.: 58-02-12-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Longwood Junior High School:
Reconstruction               0-009-008  07/22/05   155                      450,000   DDJ

Ridge Elem.Annex 1(Intermediate):
Reconstruction               0-011-006  03/14/05   7                              0   DDJ



PATCHOGUE-MEDFORD UFSD
District No.: 58-02-24-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Medford Avenue School:
Reconstruction               0-002-010  09/14/05   2,4,8,9,13,16                  0   JOD

South Ocean Middle School:
Reconstruction               0-004-014  05/13/05   2,8,9,155,15,16                0   JOD

Saxton Middle School:
Reconstruction               0-005-015  01/19/05   2,9,155,15,16          3,711,123   JOD

Tremont Ave School:
Reconstruction               0-010-010  09/14/05   4,8,9,13,16                    0   JOD

Eagle Drive Elementary:
Additions and Alterations    0-011-009  09/14/05   02 - 16                        0   JOD
Reconstruction               0-011-010  09/14/05   4,8,9,13,16                    0   JOD

Canaan Elementary School:
Reconstruction               0-013-010  09/14/05   2,4,8,9,13,16                  0   JOD



WILLIAM FLOYD UFSD
District No.: 58-02-32-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Nathaniel Woodhull Elementary:
Reconstruction               0-003-010  12/05/05   2,8,155,16                     0   HCM

William Floyd Elementary:
Reconstruction               0-004-014  12/05/05   2,4,16                         0   HCM

William Floyd Jr/Sr High:
Additions and Alterations    0-005-020  07/05/05   02 - 16                        0   HCM

Moriches Elementary School:
Reconstruction               0-009-009  02/17/05   9                              0   HCM
Reconstruction               0-009-010  12/14/05   2,16                           0   HCM

Tangier Smith Elementary:
Reconstruction               0-010-011  12/05/05   2,155,16                       0   HCM

Wm. Paca Jr. HS/7-9:
Reconstruction               0-011-012  12/05/05   2,8                            0   HCM

New Middle School:
Reconstruction               0-053-002  12/05/05   2,16                           0   HCM



SOUTH COUNTRY CSD
District No.: 58-02-35-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

South Haven Primary School:
Reconstruction               0-001-004  01/24/05   2,7,8,9,155,15,16              0   RDR

Kreamer Street Elementary:
Additions and Alterations    0-002-007  01/21/05   02 - 16                        0   RDR

Brookhaven Elementary:
Additions and Alterations    0-003-007  01/21/05   02 - 16                        0   RDR

Bellport Middle School:
Additions and Alterations    0-004-009  01/24/05   02 - 16               23,044,800   RDR

Frank P Long Inter.(frmr Hampton):
Additions and Alterations    0-005-007  01/24/05   02 - 16                        0   RDR

Senior High School:
Additions and Alterations    0-006-007  01/21/05   02 - 16                        0   RDR

Verne W. Critz Elementary:
Additions and Alterations    0-007-007  01/21/05   02 - 16                        0   RDR

Bellport Lidcs (Old Adm.):
Reconstruction               0-008-002  01/28/05   2,8,9,155,15,16                0   RDR

Brookhaven Elem. Annex:
Reconstruction               0-010-003  01/21/05   2,9,16                         0   RDR

Administration Bldg (New):
Reconstruction               1-018-002  01/24/05   2,4,7,8,9,155,15,16            0   RDR

Maintenance/Storage Building:
New Construction             2-023-002  02/03/05   02 - 16                        0   RDR

Garage Rental (lease):
Reconstruction               5-021-L02  05/05/05                            165,000   RDR

High School Press Box:
New Construction             7-024-001  02/03/05   02 - 16                        0   RDR



EAST HAMPTON UFSD
District No.: 58-03-01-02
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Middle School:
Reconstruction               0-003-016  02/18/05   2,4,7,8,9,10,14,15,1           0   HCM

John Marshall Elementary:
Reconstruction               0-004-013  12/05/05   4,8                            0   HCM

High School/Modular @ HS:
Additions and Alterations    0-006-021  03/23/05   02 - 16                        0   HCM
Additions and Alterations    0-006-022  12/01/05   02 - 16                        0   HCM

New Middle School:
New Construction             0-019-001  02/18/05   02 - 16                        0   HCM

:
New Construction             0-020-001  12/01/05   02 - 16                        0   HCM

Administration Building:
Discovered Building          1-018-001  02/03/05                                  0   HCM



WAINSCOTT COMMON SCHOOL
District No.: 58-03-02-08
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

New Wainscott School:
New Construction             0-002-001  09/20/05   02 - 16                        0   HCM



SAG HARBOR UFSD
District No.: 58-03-05-02
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Pierson High School:
Reconstruction               0-001-016  02/17/05   7                         82,125   RDR



ELWOOD UFSD
District No.: 58-04-01-02
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

James Boyd Elem. Primary:
Reconstruction               0-003-013  04/19/05   16                             0   JOD

John H. Glen High School:
Reconstruction               0-004-017  04/19/05   16                             0   JOD

Harley Avenue Elementary:
Reconstruction               0-005-011  04/19/05   16                             0   JOD

Elwood Jr High:
Reconstruction               0-006-014  04/19/05   16                             0   JOD



COLD SPRING HARBOR CSD
District No.: 58-04-02-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Junior/Senior High:
Reconstruction               0-007-028  02/17/05   7,15,16                  346,920   DDJ
Reconstruction               0-007-029  03/18/05   9,16                     409,477   DDJ



HUNTINGTON UFSD
District No.: 58-04-03-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Huntington High School:
Reconstruction               0-001-034  12/12/05   2,8,9,10,155,15,16             0   JOD

Southdown Elementary:
Reconstruction               0-003-012  01/14/05   15                             0   JOD
Reconstruction               0-003-013  07/22/05   15                             0   JOD
Reconstruction               0-003-014  07/26/05   15                             0   JOD

Washington Elementary:
Reconstruction               0-009-012  07/22/05   15                             0   JOD
Reconstruction               0-009-013  07/26/05   15                             0   JOD

J. Taylor Finley:
Reconstruction               0-014-018  07/22/05   15                             0   JOD
Reconstruction               0-014-019  07/26/05   8                              0   JOD

Huntington Inter. School:
Reconstruction               0-017-009  07/22/05   8                              0   JOD
Reconstruction               0-017-010  07/26/05   8                              0   JOD



NORTHPORT-EAST NORTHPORT UFSD
District No.: 58-04-04-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Fifth Ave. Elementary:
Reconstruction               0-004-016  08/05/05   155                            0   HCM
Reconstruction               0-004-017  08/05/05   2,9                            0   HCM

Norwood Ave. Elementary:
Reconstruction               0-005-015  08/05/05   155                            0   HCM
Reconstruction               0-005-016  08/05/05   8                              0   HCM

Northport Middle School:
Reconstruction               0-008-017  08/05/05   10                             0   HCM

Pulaski Rd. Elementary:
Reconstruction               0-009-014  08/05/05   155                            0   HCM



HALF HOLLOW HILLS CSD
District No.: 58-04-05-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Half Hollow Hills Community Library:
Reconstruction               6-009-003  05/02/05   2                        449,700   HCM
Reconstruction               6-009-004  05/04/05   2                              0   HCM



COMMACK UFSD
District No.: 58-04-10-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Hubbs Administration:
Reconstruction               1-015-003  03/18/05   15                             0   RDR



SOUTH HUNTINGTON UFSD
District No.: 58-04-13-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Birchwood Intermediate:
Additions and Alterations    0-001-017  01/07/05   02 - 16                        0   DDJ
Reconstruction               0-001-018  05/31/05   13,15                          0   DDJ

Maplewood Intermediate School:
Additions and Alterations    0-005-017  01/07/05   02 - 16                        0   DDJ
Reconstruction               0-005-018  05/31/05   2,13,15                        0   DDJ

Oakwood Elementary:
Additions and Alterations    0-006-016  01/07/05   02 - 16                        0   DDJ
Reconstruction               0-006-017  01/19/05   2,13                      82,125   DDJ

Silas Wood School:
Reconstruction               0-008-024  12/29/04   2,9,15,16                 45,132   DDJ

Countrywood Elementary:
Additions and Alterations    0-011-017  01/10/05   02 - 16                        0   DDJ
Reconstruction               0-011-018  01/19/05   2,13                      82,125   DDJ

Memorial Junior High School:
Reconstruction               7-009-011  03/15/05   9,10,16                        0   DDJ
Reconstruction               7-009-012  05/31/05   2,13,15                        0   DDJ



BAY SHORE UFSD
District No.: 58-05-01-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Brook Avenue School:
Reconstruction               0-001-009  12/07/05   4,8,155                        0   DDJ

Fifth Avenue Elementary:
Reconstruction               0-002-010  12/07/05   4,8,155                        0   DDJ

South Country Elementary:
Reconstruction               0-004-008  12/07/05   2,8,155,16                     0   DDJ

Middle School:
Reconstruction               0-005-015  12/07/05   2                              0   DDJ

Bay Shore Senior High:
Reconstruction               0-006-021  10/12/05   2,9,15                         0   DDJ

Mary G Clarkson:
Reconstruction               0-007-007  12/07/05   2                              0   DDJ

Vehicle Storage @ Maint.-5th Ave. El:
Additions and Alterations    2-011-002  05/31/05   02 - 16                  850,000   DDJ

Public Library:
Additions and Alterations    6-010-004  03/23/05   02 - 16                        0   DDJ

Press Box @ High School:
New Construction             7-018-001  04/07/05   02 - 16                  379,566   DDJ



ISLIP UFSD
District No.: 58-05-02-02
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Winganhauppauge Elementary:
Reconstruction               0-003-013  12/21/05   7                              0   JOD

Senior High School:
Reconstruction               0-007-009  12/21/05   7,9,10,155,15,16               0   JOD

Junior High School:
Reconstruction               0-011-009  12/21/05   7,8,10,155,15,16               0   JOD

Districtwide:
Reconstruction               7-999-002  12/21/05   16                             0   DDJ



SAYVILLE UFSD
District No.: 58-05-04-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

District Wide:
Reconstruction               7-999-004  07/13/05   16                       400,000   RDR



BAYPORT BLUE POINT UFSD
District No.: 58-05-05-02
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Bayport High School:
Reconstruction               0-004-018  07/20/05   155,15,16                 70,000   DDJ



HAUPPAUGE UFSD
District No.: 58-05-06-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Hauppauge High School:
Reconstruction               0-008-030  04/11/05   2,4,10,16                 36,401   JOD
Reconstruction               0-008-031  10/27/05   8,9,13,155,15,16               0   JOD
Reconstruction               0-008-032  11/21/05   4,8,9,16                       0   JOD

Container #1 @ High School:
Discovered Building          2-012-001  05/04/05                                  0   JOD

Container #2 @ High School:
Discovered Building          2-013-001  05/04/05                                  0   JOD

Container #3 @ High School:
Discovered Building          2-014-001  05/04/05                                  0   JOD

Container #4 @ High School:
Discovered Building          2-015-001  05/04/05                                  0   JOD

Container #5 @ Middle School:
Discovered Building          2-016-001  05/04/05                                  0   JOD

Container #6 @ Middle School:
Discovered Building          2-017-001  05/04/05                                  0   JOD

Container #7 @ Middle School:
Discovered Building          2-018-001  05/04/05                                  0   JOD



WEST ISLIP UFSD
District No.: 58-05-09-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Udall Road Jr. High School:
Reconstruction               0-007-012  11/02/05   2,4,8,9,155,16                 0   RDR

West Islip Senior High School:
Reconstruction               0-008-022  11/02/05   4,8,9,155,16                   0   RDR

Westbrook Elementary:
Reconstruction               0-009-013  04/06/05   2,9                       33,000   RDR

Bayview School:
Reconstruction               0-011-011  04/06/05   2,9                       34,000   RDR

Oquenock School:
Reconstruction               0-012-013  04/06/05   2,9                       33,000   RDR



SHOREHAM-WADING RIVER CSD
District No.: 58-06-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Shoreham-Wading River Middle:
Reconstruction               0-005-008  09/08/05   7                              0   HCM



RIVERHEAD CSD
District No.: 58-06-02-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Phillips Avenue School:
Reconstruction               0-001-009  06/08/05   16                             0   HCM
Reconstruction               0-001-010  06/08/05   8,9,16                         0   HCM

Pulaski Street Elementary:
Reconstruction               0-004-012  06/08/05   4                              0   HCM

Riley Ave. Elementary:
Reconstruction               0-009-011  06/08/05   8,9,16                         0   HCM

Middle School:
Reconstruction               0-010-011  06/08/05   155                            0   HCM
Reconstruction               0-010-012  06/08/05   13                             0   HCM

Riverhead Senior High:
Reconstruction               0-012-014  06/08/05   155                            0   HCM
Reconstruction               0-012-015  06/08/05   4                              0   HCM
Reconstruction               0-012-016  06/08/05   10                             0   HCM

4 Double Units @ Riverhead HS:
New Construction             0-047-001  04/15/05   02 - 16                1,100,000   HCM

Districtwide:
Reconstruction               7-999-003  06/08/05   16                             0   HCM
Reconstruction               7-999-004  06/08/05   16                             0   HCM

St. John The Evangelist School:
Reconstruction               8-048-L01  05/26/05                                  0   HCM



SMITHTOWN CSD
District No.: 58-08-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Nesconset Elementary School:
Reconstruction               0-001-019  05/26/05   4,8,155,16                     0   DDJ

Smithtown Elementary:
Reconstruction               0-006-021  05/26/05   4,8,155,16                     0   DDJ

St. James Elementary:
Reconstruction               0-016-019  05/26/05   4,8,155,16                     0   DDJ

Smithtown Middle School (H.S. East):
Reconstruction               0-023-022  05/26/05   8,155,16                       0   DDJ

Dogwood Elementary School:
Reconstruction               0-024-015  05/26/05   4,8,155,16                     0   DDJ

Mt. Pleasant Elementary:
Reconstruction               0-025-017  05/26/05   4,8,155,16                     0   DDJ

Great Hollow Jr. High:
Reconstruction               0-027-014  05/26/05   8,155,16                       0   DDJ

Mills Pond Elementary:
Reconstruction               0-028-007  05/26/05   4,8,155,16                     0   DDJ

Accompsett Elementary:
Reconstruction               0-029-018  05/26/05   4,8,155,16                     0   DDJ

Branch Brook Elementary:
Reconstruction               0-030-016  05/26/05   4,8,155,16                     0   DDJ

Tackan Elementary School:
Reconstruction               0-031-016  05/26/05   4,8,155,16                     0   DDJ

Nesaquake Intermediate:
Reconstruction               0-033-012  05/24/05   8,155,16                       0   DDJ

Smithtown 9th Grade Annex:
Reconstruction               0-034-023  05/26/05   8,155,16                       0   DDJ

Smithtown H.S. West:
Reconstruction               0-038-018  05/26/05   8,155,16                       0   DDJ

J. Barton Admin./Ahern Annex:
Reconstruction               1-008-013  05/26/05   8,155,16                       0   DDJ



WESTHAMPTON BEACH UFSD
District No.: 58-09-02-02
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Middle High (fmly Jr. High):
Additions and Alterations    0-002-010  08/11/05   02 - 16                        0   DDJ

Elementary (fmly Primary Sch):
Reconstruction               0-003-013  01/24/05   8                        136,550   DDJ
Reconstruction               0-003-014  09/13/05   2                              0   DDJ

Senior High School:
Reconstruction               0-004-015  04/11/05   2,10                           0   DDJ
Reconstruction               0-004-016  09/08/05   16                       250,000   DDJ



SOUTHAMPTON UFSD
District No.: 58-09-06-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Southampton Elementary:
Additions and Alterations    0-001-018  07/21/05   02 - 16                        0   JOD

Intermediate School:
Additions and Alterations    0-003-015  07/21/05   02 - 16                        0   JOD

High School:
Additions and Alterations    0-007-010  07/21/05   02 - 16                        0   JOD

Administration Bldg:
Additions and Alterations    2-002-004  07/21/05   02 - 16                        0   JOD



BRIDGEHAMPTON UFSD
District No.: 58-09-09-02
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Bridgehampton High:
Reconstruction               0-001-014  04/12/05   10                             0   HCM



EASTPORT-SOUTH MANOR CSD
District No.: 58-09-12-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Eastport Elem/High:
Additions and Alterations    0-001-001  08/25/05   02 - 16                        0   DDJ
Reconstruction               0-001-002  11/23/05   4,7,8,16                       0   DDJ

South Manor School:
Reconstruction               0-012-001  12/01/05   7,16                           0   DDJ
Additions and Alterations    0-012-002  12/01/05   02 - 16                        0   DDJ

Dayton Ave. School:
Reconstruction               0-014-001  12/01/05   2,16                           0   DDJ
Additions and Alterations    0-014-002  12/01/05   02 - 16                        0   DDJ

:
New Construction             0-022-001  12/06/05   02 - 16                        0   DDJ



EAST QUOGUE UFSD
District No.: 58-09-17-02
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

East Quogue Elementary:
Reconstruction               0-001-012  03/17/05   2,10                      63,900   HCM



MATTITUCK-CUTCHOGUE UFSD
District No.: 58-10-12-02
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

:
Discovered Building          0-020-001  11/03/05                                  0   HCM
Discovered Building          0-021-001  11/03/05                                  0   HCM



BOCES EASTERN SUFFOLK
District No.: 58-91-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Carmine Antonelli (Central):
Reconstruction               0-001-007  05/02/05   10                        11,029   JOD

Shop Bldg - Riverhead Vocational:
Reconstruction               0-002-007  05/02/05   10                         3,786   JOD

Food Service & Buss:
Reconstruction               0-003-005  05/02/05   10,155                    59,294   JOD

Hort./Small Engine Building:
Reconstruction               0-004-008  05/02/05   10,155                    91,146   JOD

Special Education Annex:
Reconstruction               0-011-008  05/02/05   10                         2,891   JOD

Special Education Center:
Reconstruction               0-013-008  02/17/05   8,9                            0   JOD
Reconstruction               0-013-009  05/02/05   10                        13,156   JOD

Cranberry Bldg:
Reconstruction               0-014-005  05/02/05   10,155                    55,581   JOD

BOCES I Learning Center:
Reconstruction               0-022-008  05/02/05   10                         4,448   JOD

High School Ward Tech Cen.:
Reconstruction               0-025-004  05/02/05   10                         1,251   JOD

Brookhaven Technical Center:
Reconstruction               0-048-008  05/02/05   10,155,16                511,153   JOD
Reconstruction               0-048-009  07/22/05   15                             0   JOD

Edward J. Milliken Technical Center:
Reconstruction               0-049-011  04/27/05   10,16                    401,276   JOD
Reconstruction               0-049-012  07/22/05   15                             0   JOD
Reconstruction               0-049-013  07/22/05   2                              0   JOD

Islip Learning Center:
Reconstruction               0-057-002  05/02/05   10,16                     80,835   JOD
Reconstruction               0-057-003  07/22/05   15                             0   JOD

Brookhaven Learning Center:
Reconstruction               0-058-003  05/02/05   10,16                     77,981   JOD
Reconstruction               0-058-004  08/03/05   155                            0   JOD

Brookhaven Career Center:
Reconstruction               0-059-004  05/02/05   10,155,16                441,768   JOD
Reconstruction               0-059-005  07/22/05   15                             0   JOD

Islip Career Center:
Reconstruction               0-061-006  04/29/05   10,155,16                654,593   JOD
Reconstruction               0-061-007  07/22/05   15                             0   JOD

Dr. R. DeFeo Admin. Bldg.:
Reconstruction               1-005-008  05/02/05   10,155                     2,908   JOD

Spec Ed Support Serv:
Reconstruction               1-018-001  05/06/05   10                           898   JOD

Roanoke Avenue Offices:
Reconstruction               1-034-003  05/02/05   10                           599   JOD

James Hines Administration Center:
Reconstruction               1-039-001  05/02/05   10,155,16                331,119   JOD

Administration Bldg. Garage:
Reconstruction               2-006-004  05/02/05   10                         1,711   JOD



BOCES WESTERN SUFFOLK
District No.: 58-93-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

McGuire Hall #1:
Reconstruction               0-001-008  03/24/05   155                       75,000   JOD
Reconstruction               0-001-009  06/29/05   155                      300,000   JOD

McGuire Hall #2:
Reconstruction               0-021-006  03/24/05   155                      400,000   JOD

Jones Hall #1:
Reconstruction               0-022-006  03/24/05   155                      150,000   JOD

Manor Plains School:
Reconstruction               0-029-012  04/13/05   16                       100,000   JOD
Reconstruction               0-029-013  04/13/05   13                        90,000   JOD

***SULLIVAN COUNTY***


FALLSBURG CSD
District No.: 59-05-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Junior-Senior High School:
Reconstruction               0-001-016  08/22/05   2,4,7                          0   DDJ

Benjamin Cosor Elementary:
Reconstruction               0-007-014  08/22/05   2,7                            0   DDJ



ELDRED CSD
District No.: 59-08-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Eldred School:
Reconstruction               0-001-009  12/19/05   2                              0   JOD

Mackenzie Elementary School:
Reconstruction               0-009-005  06/10/05   2                        380,000   JOD



LIBERTY CSD
District No.: 59-09-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Middle School:
Reconstruction               0-013-005  07/13/05   2,4,7,8,9,10,13,14,1     375,000   RDR



LIVINGSTON MANOR CSD
District No.: 59-13-02-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Livingston Manor Central:
Reconstruction               0-001-018  01/20/05   7                        100,000   HCM



MONTICELLO CSD
District No.: 59-14-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Senior High School:
Reconstruction               0-007-009  10/24/05   8,155,16                       0   RDR



SULLIVAN WEST CSD
District No.: 59-15-02-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

New High School:
Reconstruction               0-026-002  12/22/04   13                        19,250   HCM



BOCES SULLIVAN
District No.: 59-90-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Youngsville Elementary:
Reconstruction               0-030-002  07/27/05   7                         21,600   JOD

***TIOGA COUNTY***


CANDOR CSD
District No.: 60-03-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Bus Garage:
Additions and Alterations    4-004-004  08/22/05   02 - 16                        0   HCM

:
New Construction             5-012-001  08/22/05   02 - 16                        0   HCM



TIOGA CSD
District No.: 60-09-03-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Nichols Elementary:
Reconstruction               0-003-008  11/29/05   2,7,8,9,155,15,16              0   JOD

K/12 Bldg.(Fmly SHS/MS/Elem):
Reconstruction               0-007-008  11/29/05   2,7,155,15,16                  0   JOD

Bus Garage:
New Construction             5-026-000  12/22/05                                  0   JOD

:
New Construction             7-027-001  12/12/05   02 - 16                        0   JOD

***TOMPKINS COUNTY***


DRYDEN CSD
District No.: 61-03-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Junior Senior High:
Reconstruction               0-005-017  06/08/05   7                         90,000   HCM
Reconstruction               0-005-018  12/01/05   8,9,155,15,16                  0   HCM



ITHACA CITY SCHOOLS
District No.: 61-06-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

High School(9-12):
Reconstruction               0-015-013  03/23/05   2,13,16                  525,000   DDJ
Reconstruction               0-015-014  06/29/05   2,4,8,9,16                     0   DDJ
Reconstruction               0-015-015  08/23/05   4,15                           0   DDJ



LANSING CSD
District No.: 61-08-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Lansing Middle:
Additions and Alterations    0-001-014  10/07/05   02 - 16                        0   DDJ

School Shop:
Reconstruction               0-002-003  10/07/05   2                              0   DDJ

Lansing Elementary:
Reconstruction               0-003-009  10/07/05   2,7,8,9,155,15,16              0   DDJ

Senior High:
Additions and Alterations    0-004-012  10/07/05   02 - 16                        0   DDJ

District Office:
Reconstruction               1-005-004  10/07/05   2                              0   DDJ

Bus Maintenance Garage:
Reconstruction               5-006-008  12/21/05   2,4,8,9,10,13,14,155           0   DDJ



TRUMANSBURG CSD
District No.: 61-10-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Trumansburg Elementary:
Reconstruction               0-003-007  09/20/05   2,7,9,155,15,16                0   HCM



BOCES TOMPKINS-SENECA-TIOGA
District No.: 61-90-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

F Bldg Greenhouse:
Reconstruction               0-008-003  11/18/05   2,7,155,15,16                  0   JOD

G Powell Bldg B:
Reconstruction               0-009-005  11/18/05   2,7,155,15,16                  0   JOD

Occ Ed Bldg C:
Reconstruction               0-010-004  11/18/05   2,7,155,15,16                  0   JOD

Occ Ed Bldg D:
Reconstruction               0-011-004  11/18/05   2,7,155,15,16                  0   JOD

Smith Special Ed Blg:
Additions and Alterations    0-012-008  10/19/05   02 - 16                        0   JOD
Reconstruction               0-012-009  11/18/05   2,7,155,15,16                  0   JOD

Admin Bldg:
Reconstruction               1-001-004  11/18/05   2,7,155,15,16                  0   JOD

G Bldg Warehouse:
Reconstruction               2-007-003  10/19/05   2,13                           0   JOD
Reconstruction               2-007-004  11/18/05   2,7,155,15,16                  0   JOD

***ULSTER COUNTY***


HIGHLAND CSD
District No.: 62-08-03-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Junior/Senior High School:
Reconstruction               0-009-006  07/22/05   155                       50,000   JOD



NEW PALTZ CSD
District No.: 62-11-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Transportation Facility:
New Construction             5-015-001  01/05/05   02 - 16                        0   DDJ



BOCES ULSTER
District No.: 62-90-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Port Ewen Ed Center (Votec):
Reconstruction               0-014-012  07/21/05   2,4,8,9,10,155,15,16           0   JOD

Instructional Center:
Reconstruction               1-002-002  07/20/05   7,10,155,15,16            50,000   JOD

Administration Building:
Reconstruction               1-003-010  07/21/05   2,4,8,9,10                94,000   JOD

:
Temporary Quarters           8-034-001  07/11/05                                  0   JOD

***WARREN COUNTY***


GLENS FALLS CITY SCHOOLS
District No.: 63-03-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Middle/High School:
Reconstruction               0-001-017  10/07/05   2,7,8,9,13,155,15,16           0   JOD

Big Cross St. Elementary:
Reconstruction               0-003-008  10/07/05   10,155,15,16                   0   JOD

Jackson Heights Elementary:
Reconstruction               0-005-007  10/07/05   2,10,13,155,15,16              0   JOD

Sanford St. Elementary:
Reconstruction               0-006-008  10/07/05   4,10,155,15,16                 0   JOD

Kensington Road Elementary:
Reconstruction               0-007-007  10/07/05   2,4,8,10                       0   JOD

Administration Bldg:
Additions and Alterations    1-008-003  10/07/05   02 - 16                        0   JOD



WARRENSBURG CSD
District No.: 63-12-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Main Building:
Additions and Alterations    0-001-005  01/20/05   02 - 16                        0   DDJ

***WASHINGTON COUNTY***


ARGYLE CSD
District No.: 64-01-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Argyle Central School:
Reconstruction               0-001-007  07/20/05   2                              0   RDR



FORT EDWARD UFSD
District No.: 64-06-01-02
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

High School:
Reconstruction               0-001-007  10/03/05   4                              0   RDR



GRANVILLE CSD
District No.: 64-07-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________
Reconstruction               0-001-011  02/22/05   13,16                     40,000   DDJ

Mary J. Tanner Elementary:
Reconstruction               0-014-004  01/28/05   155,15,16                370,000   DDJ



GREENWICH CSD
District No.: 64-08-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Primary Bldg:
Additions and Alterations    0-004-007  02/10/05   02 - 16                        0   DDJ

:
Discovered Building          2-014-001  07/20/05                                  0   DDJ



HARTFORD CSD
District No.: 64-10-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Hartford Bus Garage:
Reconstruction               5-004-L02  04/27/05                             12,000   RDR



HUDSON FALLS CSD
District No.: 64-13-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Senior High School:
Reconstruction               0-001-012  10/04/05   10,155,15,16                   0   HCM

Football Field House:
Reconstruction               7-013-001  10/04/05   9,10,155,15,16                 0   HCM

:
Reconstruction               7-018-001  10/04/05   10,155,15,16                   0   HCM



WHITEHALL CSD
District No.: 64-17-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Junior-Senior High School:
Additions and Alterations    0-008-014  02/17/05   02 - 16                2,650,000   DDJ



BOCES WASH-WARREN-HAMLTON-ESSEX
District No.: 64-90-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

F. Donald Myers Educ. Ctr.:
Reconstruction               0-006-014  05/13/05   7                        252,000   JOD

Education Svcs. Ctr. Complex:
Reconstruction               0-014-016  05/13/05   8,9,155,15,16                  0   JOD

***WAYNE COUNTY***


CLYDE-SAVANNAH CSD
District No.: 65-03-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Jr/Sr High School:
Reconstruction               0-001-008  08/29/05   15                       100,000   HCM



MARION CSD
District No.: 65-07-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________
Reconstruction               0-005-011  12/29/04   155                      145,700   DDJ

New Athletic Storage Facility:
New Construction             2-008-001  05/02/05   02 - 16                  175,000   DDJ

Press Box @ Marion Jr/Sr High School:
New Construction             7-009-001  05/02/05   02 - 16                   41,000   DDJ



WAYNE CSD
District No.: 65-08-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

James A Beneway High School:
Reconstruction               0-001-007  10/07/05   155,15                         0   RDR

Ontario Elementary School:
Reconstruction               0-002-009  10/07/05   155,15                         0   RDR

Ontario Primary School:
Reconstruction               0-004-010  10/07/05   155,15                         0   RDR

Armstrong Middle School:
Reconstruction               0-006-008  10/07/05   155,15                         0   RDR

Freewill Elementary:
Reconstruction               0-007-007  10/07/05   155,15                         0   RDR

Maintenance Building:
Reconstruction               3-003-007  10/07/05   155,15                         0   RDR

Bus Garage:
Reconstruction               5-005-009  10/07/05   155,15                         0   RDR



NORTH ROSE-WOLCOTT CSD
District No.: 65-15-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Middle School:
Reconstruction               0-001-013  08/05/05   16                             0   HCM

Florentine-Hendrick Elem.:
Additions and Alterations    0-002-010  08/05/05   02 - 16                        0   HCM

North Rose Elementary School:
Reconstruction               0-007-010  08/05/05   16                             0   HCM

High School:
Additions and Alterations    0-010-011  08/05/05   02 - 16                        0   HCM

Bd Of Educ Office(District Of.):
Reconstruction               1-003-004  08/05/05   9,16                           0   HCM

Bus Garage Storage (Mdl Sch):
Reconstruction               4-008-008  08/05/05   9,16                           0   HCM

North Rose Bus Garage (Maint):
Reconstruction               5-009-009  08/05/05   16                             0   HCM

***WESTCHESTER COUNTY***


KATONAH LEWISBORO UFSD
District No.: 66-01-01-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Lewisboro Elementary:
Reconstruction               0-002-009  11/02/05   2,15                           0   DDJ

Katonah Elementary:
Reconstruction               0-003-008  12/21/05   2,15                           0   DDJ



BEDFORD CSD
District No.: 66-01-02-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Pound Ridge Elementary:
Reconstruction               0-001-010  03/23/05   2,10,16                        0   RDR
Reconstruction               0-001-011  03/23/05   2,10,15,16                     0   RDR

Bedford Village Elementary:
Reconstruction               0-002-009  03/23/05   2,9,10                   117,200   RDR

Fox Lane Middle School:
Reconstruction               0-007-006  12/08/05   2,9                            0   RDR

West Patent Rd Elem:
Reconstruction               0-009-007  03/23/05   2,9,10                    95,000   RDR

Press Box @ Fox Lane High School:
New Construction             7-022-001  03/23/05   02 - 16                   65,000   RDR



TUCKAHOE UFSD
District No.: 66-03-02-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Tuckahoe High School:
Reconstruction               0-002-014  06/29/05   4                        155,046   DDJ

Administration @ 29 Elm Street:
Temporary Quarters           1-004-001  03/17/05                                  0   DDJ



BRONXVILLE UFSD
District No.: 66-03-03-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Bronxville School:
Reconstruction               0-001-013  03/24/05   16                       159,500   HCM



TARRYTOWN UFSD
District No.: 66-04-01-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

New Bus Garage-Lease RENEWAL:
Reconstruction               5-013-L02  04/07/05                            243,564   JOD



IRVINGTON UFSD
District No.: 66-04-02-02
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Irvington High School:
Reconstruction               0-007-012  09/08/05   2                              0   DDJ

:
New Construction             2-018-001  09/08/05   02 - 16                        0   DDJ
New Construction             2-019-001  09/08/05   02 - 16                        0   DDJ



EDGEMONT UFSD
District No.: 66-04-06-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Greenville Elementary School:
Reconstruction               0-008-011  04/21/05   2                        420,000   JOD

HS Administration Building:
Reconstruction               1-011-004  04/21/05   2                         28,500   JOD



GREENBURGH-GRAHAM UFSD
District No.: 66-04-10-02
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

New Elementary School:
Reconstruction               0-008-003  05/04/05   2,8,16                         0   DDJ



MAMARONECK UFSD
District No.: 66-07-01-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Mamaroneck High School:
Reconstruction               0-001-025  04/11/05   8,9,10,155,15,16      10,000,000   DDJ

Hommocks Junior High School:
Reconstruction               0-011-021  01/21/05   2,4,7,8,9,10,13,155,           0   DDJ



MT PLEASANT CSD
District No.: 66-08-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Westlake HS:
Reconstruction               0-005-011  07/22/05   8,9,155,15,16                  0   DDJ



PLEASANTVILLE UFSD
District No.: 66-08-09-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

High School:
Reconstruction               0-001-010  05/02/05   7                        116,000   RDR

Modular @ Pleasantville High School:
New Construction             0-010-001  02/04/05   02 - 16                   34,000   RDR



MOUNT VERNON CITY SCHOOLS
District No.: 66-09-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Thornton Elem.(fmly Wash.):
Additions and Alterations    0-003-009  04/06/05   02 - 16                        0   HCM

Cecil Parker Elementary:
Reconstruction               0-004-008  04/06/05   7                              0   HCM

A.B. Davis HS Annex:
Reconstruction               0-011-011  01/10/05   2,8,9,155,15,16                0   HCM

Franko Middle(form. Nichols):
Additions and Alterations    0-014-013  04/06/05   02 - 16                        0   HCM

Mount Vernon High School:
Additions and Alterations    0-017-015  04/06/05   02 - 16                        0   HCM

Grimes Elementary School:
Additions and Alterations    0-029-002  04/06/05   02 - 16                  778,700   HCM

:
New Construction             2-033-001  07/01/05   02 - 16                        0   HCM

District Wide:
Reconstruction               7-999-004  08/11/05   16                             0   HCM
Reconstruction               7-999-005  08/11/05   16                             0   HCM



CHAPPAQUA CSD
District No.: 66-10-04-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Chappaqua Library:
Additions and Alterations    6-022-005  08/02/05   02 - 16                1,155,197   JOD



NEW ROCHELLE CITY SCHOOLS
District No.: 66-11-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

New Rochelle High School:
Reconstruction               0-001-011  03/11/05   2,10,13,155,15,16              0   HCM

Albert Leonard Jr. High:
Reconstruction               0-002-007  03/14/05   13,16                          0   HCM

Isaac E. Young Jr. High:
Reconstruction               0-003-008  03/14/05   13,15,16                       0   HCM

Henry Barnard Elementary:
Reconstruction               0-004-005  03/14/05   2,15,16                        0   HCM

Columbus Elementary:
Reconstruction               0-005-006  03/14/05   155,15,16                      0   HCM

G. Davis Elementary:
Reconstruction               0-006-005  03/14/05   2,8,13,16                      0   HCM

Jefferson Elementary:
Reconstruction               0-007-005  03/14/05   7                              0   HCM

Trinity Elementary:
Reconstruction               0-012-007  03/11/05   7,16                           0   HCM

W. Ward Elementary:
Reconstruction               0-013-007  03/14/05   2,8,155,15,16                  0   HCM

Daniel Webster Elementary:
Reconstruction               0-015-007  03/11/05   155,15,16                      0   HCM



BYRAM HILLS CSD
District No.: 66-12-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Relocated portables @ Coman Hill:
New Construction             0-043-001  02/09/05   02 - 16                  498,000   DDJ



OSSINING UFSD
District No.: 66-14-01-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Ossining Sr. High:
Reconstruction               0-003-015  03/18/05   2                              0   JOD
Reconstruction               0-003-016  03/18/05   2,16                           0   JOD
Reconstruction               0-003-017  08/11/05   4                              0   JOD

Park School:
Reconstruction               0-004-011  08/11/05   8,15,16                        0   JOD

Dorner Middle School:
Reconstruction               0-008-011  03/18/05   2,16                   3,147,500   JOD
Reconstruction               0-008-012  03/18/05   2                              0   JOD
Reconstruction               0-008-013  03/18/05   2,16                     239,000   JOD

Storage/Concession @ M/School:
New Construction             7-015-001  07/11/05   02 - 16                  236,000   JOD

Press Box @ HS:
New Construction             7-017-001  07/26/05   02 - 16                   52,500   JOD

Press Box @ Middle School:
New Construction             7-018-001  07/19/05   02 - 16                   52,500   JOD



PEEKSKILL CITY SCHOOLS
District No.: 66-15-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Admin.Ctr / Special Ed. Classes:
Reconstruction               0-009-007  11/10/05   10                             0   HCM

Peekskill High School:
Reconstruction               0-010-009  12/23/04   2,9                      671,608   HCM



RYE CITY SCHOOLS
District No.: 66-18-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Midland Elementary School:
Reconstruction               0-003-020  03/24/05   2,7                      294,500   HCM

Rye High School/Middle School:
Reconstruction               0-005-021  03/24/05   2,7                      343,000   HCM



RYE NECK UFSD
District No.: 66-19-01-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

High School:
Additions and Alterations    0-002-015  02/17/05   02 - 16                        0   RDR

F E. Bellows Elementary:
Additions and Alterations    0-003-015  02/17/05   02 - 16                        0   RDR

Daniel Warren (form. Hallen Center):
Additions and Alterations    7-004-014  02/17/05   02 - 16                        0   RDR

:
Discovered Building          7-017-001  06/15/05                                  0   JOD



PORT CHESTER-RYE UFSD
District No.: 66-19-04-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Port Chester High School:
Additions and Alterations    0-004-014  01/20/05   02 - 16                        0   DDJ
Reconstruction               0-004-015  05/02/05   7                              0   DDJ

JFK K-1 Primary School:
Additions and Alterations    0-005-009  01/20/05   02 - 16                        0   DDJ

JF Kennedy Elementary:
Reconstruction               0-006-010  01/20/05   2,4,7,8,9,155,15,16            0   DDJ

King Street Elementary School:
Reconstruction               0-007-009  01/20/05   2,7,8,9,155,15,16              0   DDJ
Reconstruction               0-007-010  05/02/05   2,4,7                          0   DDJ

Park Avenue Elementary School:
Reconstruction               0-008-009  01/20/05   2,7,155,15,16            960,000   DDJ

Edison Elementary School:
Reconstruction               0-012-008  01/20/05   8,9,16                         0   DDJ

Port Chester Middle School:
Reconstruction               0-013-012  01/20/05   2,7,9,155,15,16                0   DDJ
Reconstruction               0-013-013  05/02/05   2,4,7                          0   DDJ



BLIND BROOK-RYE UFSD
District No.: 66-19-05-02
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

:
Discovered Building          0-009-001  07/21/05                                  0   DDJ



SOMERS CSD
District No.: 66-21-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Central Administration Building:
Temporary Quarters           1-012-001  01/05/05                                  0   HCM

Building C - Administration:
Temporary Quarters           1-013-001  10/14/05                                  0   HCM



YONKERS CITY SCHOOLS
District No.: 66-23-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

School #17:
Reconstruction               0-017-004  03/16/05   10                       150,000   HCM

Town House A & B:
Discovered Building          7-337-001  04/15/05                                  0   HCM

:
Reconstruction               8-338-L01  07/20/05                                  0   HCM



BOCES SOUTHERN WESTCHESTER
District No.: 66-90-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Administration Bldg:
Reconstruction               1-001-003  08/10/05   4,7                            0   JOD

Computer Center:
Reconstruction               1-002-001  03/23/05   16                       210,000   JOD
Reconstruction               1-002-002  11/10/05   16                             0   JOD

***WYOMING COUNTY***


ATTICA CSD
District No.: 67-02-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Jr/Sr High School:
Reconstruction               0-001-013  08/23/05   7,13                           0   JOD

Prospect Elementary School:
Reconstruction               0-003-010  08/29/05   4,7                            0   JOD

Sheldon Elementary:
Reconstruction               0-005-009  08/29/05   7                              0   JOD



WARSAW CSD
District No.: 67-15-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

:
Discovered Building          2-017-001  10/03/05                                  0   DDJ
Discovered Building          2-018-001  10/03/05                                  0   DDJ

***YATES COUNTY***


PENN YAN CSD
District No.: 68-06-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Middle School:
Reconstruction               0-003-008  07/21/05   10,15                    300,500   HCM

Penn Yann Elementary:
Reconstruction               0-004-007  07/21/05   2,9,155,16               486,000   HCM

Branchport Elementary:
Reconstruction               0-006-005  07/21/05   2                         40,000   HCM

Penn Yan Academy:
Additions and Alterations    0-008-008  04/06/05   02 - 16                        0   HCM
Reconstruction               0-008-009  07/21/05   16                       205,349   HCM

Bus Garage:
Reconstruction               5-019-004  11/17/05   155,16                         0   HCM

Multi-Purpose Bldg. @ Athletic Field:
New Construction             7-025-001  02/10/05   02 - 16                  210,000   HCM