School District Capital Construction Projects: Letters of Intent for the Last 12 Months Report

THE STATE EDUCATION DEPARTMENT

OFFICE of FACILITIES PLANNING


LAST UPDATED ON 12/22/05 at 14:53:43
START OF REPORTING PERIOD: 12/22/04
END OF REPORTING PERIOD: 12/22/05


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows
           09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition

***ALBANY COUNTY***


ALBANY CITY SCHOOLS
District No.: 01-01-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Hackett Middle School:
Additions and Alterations    0-044-011  07/11/05   02 - 16               29,700,000   HCM

Albany High School:
Reconstruction               0-048-011  06/08/05   155                            0   HCM

Administration Bldg.:
Reconstruction               1-001-002  08/26/05   155                      268,469   HCM



COHOES CITY SCHOOLS
District No.: 01-05-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

District Wide:
Reconstruction               7-999-003  08/10/05   16                             0   JOD



SOUTH COLONIE CSD
District No.: 01-06-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Colonie Community Center:
Reconstruction               8-020-L01  05/11/05                                  0   RDR



NORTH COLONIE CSD
District No.: 01-06-05-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Bus Garage:
Reconstruction               5-015-010  06/21/05   13                        75,000   RDR



GUILDERLAND CSD
District No.: 01-08-02-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Lumber Storage Shed:
New Construction             2-020-001  02/10/05   02 - 16                        0   DDJ



BOCES ALBANY-SCHOH-SCHEN
District No.: 01-90-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Maywood School:
Reconstruction               0-018-007  01/20/05   2,7                      200,000   JOD

***ALLEGANY COUNTY***


GENESEE VALLEY CSD
District No.: 02-07-02-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

New Pre-K-12:
Reconstruction               0-012-002  06/09/05   9                        170,000   DDJ



FRIENDSHIP CSD
District No.: 02-16-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Building:
Reconstruction               0-001-013  09/28/05   2                        100,000   HCM



FILLMORE CSD
District No.: 02-20-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Fillmore Main Building:
Additions and Alterations    0-001-006  12/29/04   02 - 16                        0   HCM



SCIO CSD
District No.: 02-24-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Main Building:
Reconstruction               0-001-011  07/27/05   16                        35,000   HCM
Reconstruction               0-001-012  08/29/05   2,7,8,9,155,15,16              0   HCM

Bus Garage:
Reconstruction               5-002-006  08/29/05   15                             0   HCM



BOLIVAR-RICHBURG CSD
District No.: 02-29-02-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Bolivar 6-12 Building:
Reconstruction               0-001-018  04/06/05   7,8,9,155,15,16                0   HCM
Reconstruction               0-001-019  08/23/05   10                             0   HCM

Richburg K-5 Building:
Reconstruction               0-011-011  04/06/05   2,8,9,155,15,16                0   HCM

***BROOME COUNTY***


CHENANGO FORKS CSD
District No.: 03-01-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

:
New Construction             7-025-001  07/18/05   02 - 16                        0   JOD



BINGHAMTON CITY SCHOOLS
District No.: 03-02-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

New East Middle School:
Reconstruction               0-011-005  12/14/05   14                             0   HCM



SUSQUEHANNA VALLEY CSD
District No.: 03-06-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Cedarhurst Elem. School:
Reconstruction               0-005-004  03/30/05   2,9,13,155,15,16               0   RDR



DEPOSIT CSD
District No.: 03-13-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Press Box:
New Construction             7-014-001  02/15/05   02 - 16                   40,000   HCM

Concession Building:
New Construction             7-015-001  02/10/05   02 - 16                   60,000   HCM



UNION ENDICOTT CSD
District No.: 03-15-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Linnaeus West Elementary:
Reconstruction               0-004-008  04/11/05   2,13                      43,899   DDJ

Charles F.Johnson Elem.:
Reconstruction               0-006-011  04/11/05   2,13,15                   53,775   DDJ
Reconstruction               0-006-012  10/19/05   4,7,8,9,10,155,15,16   1,315,000   DDJ

Senior High School:
Reconstruction               0-011-024  11/29/05   15,16                    113,000   DDJ

T.J. Watson ES:
Reconstruction               0-016-010  04/11/05   2,13                     171,361   DDJ

Ann G. McGuinness Elementary:
Reconstruction               0-017-010  04/11/05   2,13                     172,165   DDJ

Softball Storage Building:
Discovered Building          2-032-001  03/18/05                                  0   DDJ

Press Box @ High School:
Discovered Building          7-031-001  03/18/05                                  0   DDJ

:
New Construction             7-033-001  09/28/05   02 - 16                        0   DDJ



JOHNSON CITY CSD
District No.: 03-15-02-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

K-8 Elementary Middle:
Additions and Alterations    0-020-002  05/02/05   02 - 16                        0   DDJ

:
New Construction             0-024-001  06/08/05   02 - 16                        0   DDJ



VESTAL CSD
District No.: 03-16-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Senior High:
Reconstruction               0-001-011  10/07/05   2,13                           0   JOD
Reconstruction               0-001-012  10/26/05   2,4,8,9,10,155,15,16           0   JOD

Clayton Avenue School:
Reconstruction               0-003-011  10/07/05   2,16                           0   JOD

Glenwood Ave. Elementary:
Reconstruction               0-010-008  10/07/05   2,16                           0   JOD

Tioga Hills Elem. School:
Reconstruction               0-012-007  10/07/05   2,16                           0   JOD

:
Reconstruction               3-002-001  10/26/05   2                              0   JOD



BOCES BROOME-TIOGA
District No.: 03-90-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

CBO-Building 2 (Admin):
Temporary Quarters           1-043-001  08/01/05                                  0   JOD

IBM-H.B. Endicott School Building:
Reconstruction               8-021-004  08/09/05   9,155,15,16                    0   JOD

***CATTARAUGUS COUNTY***


ELLICOTTVILLE CSD
District No.: 04-09-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Ellicottville Central School:
Reconstruction               0-001-010  12/07/05   2,155,16                       0   RDR

:
New Construction             2-008-001  07/27/05   02 - 16                        0   RDR



GOWANDA CSD
District No.: 04-28-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Junior/Senior High:
Reconstruction               0-001-005  01/28/05   2,4,7,8,9,155,15,16            0   HCM

Aldrich St. Elementary:
Additions and Alterations    0-006-003  01/28/05   02 - 16                        0   HCM

:
New Construction             7-006-001  09/02/05   02 - 16                        0   HCM



BOCES CATT-ALLEG-ERIE-WYOMING
District No.: 04-90-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

AF Haynes Center at Belmont:
Reconstruction               0-001-009  07/20/05   2,4,7,8,9,10,155,15,   5,615,637   JOD

Annex 3 C Wing:
Reconstruction               0-005-003  06/21/05   2,4,7,8,9,155,15,16            0   JOD

Ellicottville No. Area Occup. Center:
Reconstruction               0-006-012  06/21/05   2,4,7,8,9,10,155,15,   1,362,842   JOD

Annex 4 Bldg. B:
Reconstruction               0-007-003  07/20/05   2,7,8,9,10,155,15,16     349,720   JOD

Olean So. Area Occ. Ctr.:
Reconstruction               0-008-021  07/20/05   2,4,8,9,155,15,16      2,671,801   JOD

***CAYUGA COUNTY***


AUBURN CITY SCHOOLS
District No.: 05-01-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Genesee Street School:
Reconstruction               0-001-007  02/18/05   155,16                         0   JOD

Herman Avenue School:
Reconstruction               0-002-010  02/18/05   155,16                         0   JOD

West Middle School:
Reconstruction               0-006-006  02/18/05   155,16                         0   JOD

Owasco Elementary:
Reconstruction               0-010-011  02/18/05   155,16                         0   JOD

Casey Park Elementary:
Reconstruction               0-012-009  02/18/05   155,16                         0   JOD

Auburn High School:
Reconstruction               0-015-012  02/18/05   155,16                         0   JOD

Seward Elementary:
Reconstruction               0-017-011  02/18/05   155,16                         0   JOD

:
Discovered Building          7-035-001  09/02/05                                  0   JOD



WEEDSPORT CSD
District No.: 05-03-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Elementary School:
Reconstruction               0-001-012  05/24/05   2,7,155,15,16                  0   JOD

Junior Senior High School:
Reconstruction               0-002-017  05/24/05   2,7,155,15,16                  0   JOD



CATO-MERIDIAN CSD
District No.: 05-04-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Press Box:
Reconstruction               7-005-001  03/11/05   7,8,9,10,155,16           38,000   HCM



MORAVIA CSD
District No.: 05-13-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Athletic Storage Container:
New Construction             2-014-001  01/05/05   02 - 16                        0   RDR



BOCES CAYUGA-ONONDAGA
District No.: 05-90-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Occ. Educ. Center:
Reconstruction               0-001-004  05/03/05   13                             0   JOD
Reconstruction               0-001-005  07/26/05   2,9                            0   JOD
Reconstruction               0-001-006  08/12/05   2,9                            0   JOD

Storage Container 1:
New Construction             2-029-001  02/18/05   02 - 16                        0   JOD

:
Temporary Quarters           8-030-001  08/22/05                                  0   JOD

***CHAUTAUQUA COUNTY***


FREWSBURG CSD
District No.: 06-03-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Robert H Jackson Elem.:
Reconstruction               0-002-006  12/28/04   2,4,7,8,9,155,15,16            0   JOD

:
New Construction             7-013-001  09/02/05   02 - 16                        0   JOD



FALCONER CSD
District No.: 06-11-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Track & Field Storage Building:
Discovered Building          2-010-001  05/05/05   02 - 16                        0   JOD



FORESTVILLE CSD
District No.: 06-15-03-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

New Bus Garage:
New Construction             5-004-002  01/05/05   02 - 16                2,468,400   JOD



JAMESTOWN CITY SCHOOLS
District No.: 06-17-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Carlyle Ring Elementary:
Reconstruction               0-009-006  11/21/05   2,7,13                         0   DDJ

Clinton V Bush Elementary:
Reconstruction               0-010-006  11/21/05   2,7,13                         0   DDJ

Jefferson Jr. High:
Additions and Alterations    0-015-013  12/01/05   02 - 16                        0   DDJ
Reconstruction               0-015-014  12/09/05   2,10,16                        0   DDJ

Roger Elementary:
Reconstruction               0-018-005  11/21/05   7                              0   DDJ



FREDONIA CSD
District No.: 06-22-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Wheelock School K-3:
Reconstruction               0-001-008  10/07/05   16                             0   HCM

Main Street Campus 3-12:
Reconstruction               0-009-010  10/07/05   2,16                           0   HCM

***CHEMUNG COUNTY***


ELMIRA CITY SCHOOLS
District No.: 07-06-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Coburn Elementary:
Reconstruction               0-002-011  06/28/05   10                             0   DDJ
Reconstruction               0-002-012  08/11/05   2,4,7,9,155,15,16              0   DDJ

Booth Elementary:
Reconstruction               0-003-012  06/28/05   10                             0   DDJ

Beecher Elementary:
Reconstruction               0-005-008  06/28/05   10                             0   DDJ
Additions and Alterations    0-005-009  08/11/05   02 - 16                        0   DDJ

Diven Elementary:
Reconstruction               0-006-011  06/28/05   10                             0   DDJ

Fassett Elementary School:
Reconstruction               0-008-004  06/28/05   10                             0   DDJ
Additions and Alterations    0-008-005  08/11/05   02 - 16                        0   DDJ

Riverside Elementary:
Reconstruction               0-012-007  06/28/05   9,10                           0   DDJ
Reconstruction               0-012-008  12/21/05   2,7                            0   DDJ

Washington Elementary:
Reconstruction               0-013-011  06/28/05   10                             0   DDJ

Hendy Avenue Elementary:
Reconstruction               0-014-012  06/28/05   10                             0   DDJ

Ernie Davis Jr. High School:
Reconstruction               0-015-014  06/28/05   4,10                           0   DDJ

Southside High School:
Reconstruction               0-016-015  06/28/05   9,10                           0   DDJ

Pine City Elementary:
Reconstruction               0-033-013  06/28/05   7,10,155                       0   DDJ

Broadway ES(K-6)/MS(7-8):
Reconstruction               0-034-015  06/28/05   9,10,16                        0   DDJ

Elmira Free Academy:
Reconstruction               0-038-017  06/28/05   2,8,10,155,15                  0   DDJ
Reconstruction               0-038-018  11/30/05   2,155,16                       0   DDJ
Reconstruction               0-038-019  12/05/05   2,155,16                       0   DDJ

Storage Facility #3 @ Elmira Free Ac:
Discovered Building          2-073-001  12/22/04                                  0   DDJ

Storage Building @ Fossett:
New Construction             2-074-001  05/26/05   02 - 16                        0   DDJ

:
New Construction             2-075-001  06/28/05   02 - 16                        0   DDJ
New Construction             2-076-001  06/28/05   02 - 16                        0   DDJ
New Construction             2-077-001  06/28/05   02 - 16                        0   DDJ

Bus Garage:
Reconstruction               5-017-009  06/28/05   2,10,15,16                     0   DDJ

District Wide:
Reconstruction               7-999-006  12/19/05   16                             0   DDJ
Reconstruction               7-999-007  12/21/05   10,16                          0   DDJ



HORSEHEADS CSD
District No.: 07-09-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Senior High School South Wing:
Reconstruction               0-001-013  07/26/05   2,4,8,9,155,15,16              0   JOD

Broad Street Elementary:
Reconstruction               0-004-012  03/16/05   2                          9,700   JOD

Horseheads SHS North Wing:
Reconstruction               0-009-016  07/26/05   2,4,7,8,155,15,16              0   JOD

Middle School:
Reconstruction               0-013-017  07/26/05   2,4,8,9,10,155,15,16           0   JOD

Bus Garage:
Reconstruction               5-005-009  07/26/05   4,15,16                        0   JOD



ELMIRA HEIGHTS CSD
District No.: 07-09-02-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Bus Garage (lease):
Reconstruction               5-014-L02  02/28/05                             43,500   JOD
Reconstruction               5-014-L03  04/22/05                             48,000   JOD

***CHENANGO COUNTY***


UNADILLA VALLEY CSD
District No.: 08-10-03-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

New Pre K-12 Building:
Reconstruction               0-014-003  07/25/05   4,7                            0   RDR



NORWICH CITY SCHOOLS
District No.: 08-12-00-05
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Norwich Senior High School:
Reconstruction               0-008-008  09/08/05   155,16                         0   JOD
Reconstruction               0-008-009  09/20/05   155                            0   JOD

Guernsey Mem. Library:
Reconstruction               6-022-003  10/27/05   2,8,155,16                     0   JOD



SHERBURNE EARLVILLE CSD
District No.: 08-20-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Jr/Sr High School:
Reconstruction               0-012-009  08/23/05   2,4,7,8,9,10,13,14,1           0   RDR

New Elementary School:
Additions and Alterations    0-018-004  08/23/05   02 - 16                        0   RDR

Baseball Storage:
New Construction             2-023-001  08/22/05   02 - 16                        0   RDR

New Bus Storage:
Additions and Alterations    4-020-002  08/23/05   02 - 16                        0   RDR

New Bus Maintenance:
Reconstruction               5-019-002  08/23/05   2,9,155,15,16                  0   RDR

Press Box:
Reconstruction               7-021-002  08/23/05   2,16                           0   RDR

:
New Construction             7-022-001  08/22/05   02 - 16                        0   RDR

***CLINTON COUNTY***


AUSABLE VALLEY CSD
District No.: 09-02-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Keeseville Elementary:
Reconstruction               0-003-012  12/01/05   2,4,8,9,155,15,16              0   HCM

Middle High School:
Reconstruction               0-011-014  12/01/05   2,8,9,155,15,16                0   HCM
Reconstruction               0-011-015  12/01/05   7                              0   HCM

AuSable Forks Primary:
Reconstruction               0-012-007  12/01/05   2,4,8,9,155,15,16              0   HCM
Reconstruction               0-012-008  12/01/05   7                              0   HCM

Press Box (New Bldg.):
New Construction             7-022-001  12/21/05   02 - 16                        0   HCM



BEEKMANTOWN CSD
District No.: 09-03-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Main Building:
Reconstruction               0-003-008  04/15/05   2                              0   RDR
Reconstruction               0-003-009  08/11/05   155,16                   221,000   RDR
Reconstruction               0-003-010  08/11/05   13,16                          0   RDR

Cumberland Head Elementary:
Reconstruction               0-004-010  08/11/05   2,8,16                         0   RDR



NORTHEASTERN CLINTON CSD
District No.: 09-05-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Middle High School:
Reconstruction               0-001-005  03/03/05   155                       90,400   RDR

Rouses Point Elem.:
Reconstruction               0-002-005  11/21/05   7                              0   RDR



CHAZY UFSD
District No.: 09-06-01-02
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Chazy Rural Sch/Indust.Arts Bldg.:
Reconstruction               0-001-010  12/28/04   2,4,8,9,10,155,15,16     166,980   HCM



NORTHERN ADIRONDACK CSD
District No.: 09-09-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Ellenburgh Elementary:
Reconstruction               0-001-008  09/30/05   155,15                         0   DDJ

Jr/Sr High School:
Reconstruction               0-007-007  09/30/05   155,15                         0   DDJ



PERU CSD
District No.: 09-11-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Primary School:
Reconstruction               0-004-008  05/04/05   9,16                      27,400   RDR

Intermediate School:
Reconstruction               0-005-011  05/11/05   10,16                     35,800   RDR

Athletic Field House:
New Construction             7-018-001  05/11/05   02 - 16                   45,000   RDR



PLATTSBURGH CITY SCHOOLS
District No.: 09-12-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Concession Stand:
New Construction             7-016-001  02/18/05   02 - 16                   75,000   RDR

:
New Construction             7-017-001  08/11/05   02 - 16                   25,000   RDR



SARANAC CSD
District No.: 09-14-02-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Saranac Jr/Sr HS 7-12:
Reconstruction               0-002-010  04/06/05   4,8,9,10,155,15,16       483,530   HCM



BOCES CLINTON-ESSEX-WARR-WASH
District No.: 09-90-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Yandon Dillon Education Ctr.:
Reconstruction               0-001-006  12/28/04   2,13                           0   JOD

***COLUMBIA COUNTY***


GERMANTOWN CSD
District No.: 10-09-02-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Main Building:
Reconstruction               0-001-016  10/07/05   8,9,10,16                      0   JOD



CHATHAM CSD
District No.: 10-10-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Middle School:
Reconstruction               0-002-014  12/01/05   2,4,7,8,9,10,13,14,1           0   DDJ

High School:
Reconstruction               0-005-010  12/13/05   2,4,7,8,9,10,13,14,1           0   DDJ



ICHABOD CRANE (KINDERHOOK) CSD
District No.: 10-14-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Martin H. Glynn School:
Additions and Alterations    0-003-011  09/12/05   02 - 16                  359,000   HCM

***CORTLAND COUNTY***


CINCINNATUS CSD
District No.: 11-01-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Central School:
Reconstruction               0-001-009  06/07/05   2,4,8,9,10,13,14,155           0   DDJ
Reconstruction               0-001-010  10/19/05   2                              0   DDJ
Reconstruction               0-001-011  10/19/05   2,4,7,8,9,10,14,155,           0   DDJ

:
Discovered Building          1-012-001  09/02/05                                  0   DDJ



MCGRAW CSD
District No.: 11-03-04-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Elementary School:
Reconstruction               0-004-008  05/20/05   2,9                       99,900   RDR
Reconstruction               0-004-009  07/21/05   2,9                            0   RDR



MARATHON CSD
District No.: 11-09-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

High School:
Reconstruction               0-001-010  03/21/05   8,155,16               1,165,000   HCM

Appleby Elementary:
Reconstruction               0-005-010  03/21/05   8,9,15,16              1,182,000   HCM

New Bus Garage:
Reconstruction               5-006-003  03/21/05   10,15                    248,000   HCM




District No.: 11-16-05-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

:
Reconstruction               0-003-009  04/12/05   2,9                       92,095   HCM

***DELAWARE COUNTY***


ANDES CSD
District No.: 12-01-02-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Main Building:
Reconstruction               0-001-005  10/27/05   2,7                            0   HCM



DELHI CSD
District No.: 12-05-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Delaware Academy:
Reconstruction               0-001-007  07/20/05   4,7,8,155,15,16                0   DDJ

Delhi Elementary School:
Reconstruction               0-004-004  07/20/05   4,7,8,9,155,15,16              0   DDJ

Abraham L Kellogg:
Reconstruction               0-006-003  07/20/05   4,7,8,9,155,15,16              0   DDJ

A.L. Kellogg Elementary School:
Reconstruction               0-009-002  09/29/05   4,7,8,9,155,15,16              0   DDJ

:
New Construction             2-012-001  08/11/05   02 - 16                        0   DDJ

Bus/Maintenance Garage:
Reconstruction               5-010-002  07/20/05   4,7,8,9,155,15,16              0   DDJ



HANCOCK CSD
District No.: 12-09-06-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Jr/Sr High School:
Reconstruction               0-001-010  09/20/05   2,4,7,8,9,155,15,16            0   JOD

Elementary School:
Additions and Alterations    0-004-009  09/20/05   02 - 16                        0   JOD



SIDNEY CSD
District No.: 12-16-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Sidney Senior High:
Reconstruction               0-001-009  06/20/05   16                             0   JOD



SOUTH KORTRIGHT CSD
District No.: 12-17-02-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Central School:
Reconstruction               0-003-009  09/12/05   10                             0   DDJ

Bus Garage:
Reconstruction               5-001-007  09/12/05   10                             0   DDJ



WALTON CSD
District No.: 12-19-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Townsend School K-5:
Reconstruction               0-006-015  12/05/05   9,155,16                       0   HCM

Bus Garage:
Reconstruction               5-003-006  05/12/05   13                             0   HCM



BOCES DEL-CHEN-MADISON-OTSEGO
District No.: 12-90-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Chenango Campus (Occ Ctr 011):
Reconstruction               0-002-019  07/13/05   2,15                      21,000   JOD

W. Delaware Ed. Campus Bldg. B:
Reconstruction               0-003-012  08/29/05   4,9,155,16                     0   JOD

:
Reconstruction               1-032-001  10/26/05   4,155,16                       0   JOD

Oc. Ed. Clsrm. Bldg. W. Delwr.:
Reconstruction               8-026-003  09/01/05   9,13                           0   JOD

United Church of Christ First Congre:
Temporary Quarters           8-039-001  01/14/05                                  0   JOD

Sidney Civic Center:
Temporary Quarters           8-040-001  01/14/05                                  0   JOD

:
Reconstruction               8-041-L01  10/14/05                                  0   JOD

***DUTCHESS COUNTY***


BEACON CITY SCHOOLS
District No.: 13-02-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Howland Public Library:
New Construction             6-022-001  02/04/05   02 - 16                        0   JOD

New Press Box:
New Construction             7-023-001  04/25/05   02 - 16                   35,585   JOD



DOVER UFSD
District No.: 13-05-02-02
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Dover Middle/High School:
Reconstruction               0-001-009  04/11/05   2,8,9,15                  99,700   RDR
Reconstruction               0-001-010  10/27/05   2,10,155,15,16                 0   JOD
Reconstruction               0-001-011  10/27/05   2,10,155,15,16                 0   RDR

Dover Elem. School:
Reconstruction               0-004-008  10/27/05   2,7,9,15,16                    0   JOD

:
New Construction             7-009-001  11/10/05   02 - 16                        0   JOD
New Construction             7-010-001  11/10/05   02 - 16                        0   JOD



HYDE PARK CSD
District No.: 13-08-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Haviland Middle School(JrHigh):
Reconstruction               0-001-016  01/14/05   2,4,7,8,9,14,155,15,           0   HCM
Reconstruction               0-001-017  05/31/05   7                        128,000   HCM
Reconstruction               0-001-018  05/31/05   2,4,8,9,14,155,15,16   1,697,977   HCM

Roosevelt High School:
Reconstruction               0-002-015  01/14/05   2,4,8,9,14,155,15,16     314,100   HCM
Reconstruction               0-002-016  05/31/05   2,4,8,9,155,15,16      2,230,348   HCM
Reconstruction               0-002-017  09/28/05   16                       186,500   HCM

Ralph R. Smith Elementary:
Reconstruction               0-003-014  01/14/05   2,4,7,8,9,14,155,15,     355,116   HCM
Reconstruction               0-003-015  05/31/05   2,4,7,8,9,14,155,15,   1,629,979   HCM

Violet Avenue Elementary:
Reconstruction               0-004-013  01/14/05   2,4,7,8,9,14,155,15,     191,268   HCM
Reconstruction               0-004-014  05/31/05   2,4,7,8,9,14,155,15,   1,162,128   HCM

Hyde Park Elementary:
Reconstruction               0-005-018  01/14/05   2,4,7,8,9,14,155,15,      31,020   HCM
Reconstruction               0-005-019  05/31/05   2,4,7,8,9,14,155,15,     933,949   HCM

Netherwood Elementary School:
Reconstruction               0-007-014  01/14/05   2,4,7,8,9,14,155,15,      15,180   HCM
Reconstruction               0-007-015  05/31/05   2,4,7,8,9,14,155,15,     832,854   HCM

North Park Elementary School:
Reconstruction               0-013-015  01/14/05   2,4,7,8,9,14,155,15,      19,140   HCM
Reconstruction               0-013-016  05/31/05   2,4,7,8,9,155,15,16      480,249   HCM



NORTHEAST (WEBUTUCK) CSD
District No.: 13-11-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Millerton Elementary School:
Reconstruction               0-001-007  04/06/05   13                       320,000   JOD



PAWLING CSD
District No.: 13-12-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

:
Temporary Quarters           1-010-001  06/13/05                                  0   JOD

Office/Storage @ leased bus garage:
Temporary Quarters           1-011-001  07/19/05                                  0   JOD

Leased Bus Garage:
Reconstruction               5-009-L01  06/08/05                                  0   JOD



PINE PLAINS CSD
District No.: 13-13-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Seymour Smith School:
Reconstruction               0-001-011  08/11/05   155                            0   HCM

Cold Springs Elementary:
Reconstruction               0-002-005  01/20/05   7                        890,000   HCM



ARLINGTON CSD
District No.: 13-16-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

North Campus HS:
Reconstruction               0-008-008  03/24/05   16                       200,000   HCM
Additions and Alterations    0-008-009  08/10/05   02 - 16                        0   HCM



SPACKENKILL UFSD
District No.: 13-16-02-02
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Spackenkill High School:
Reconstruction               0-005-015  03/16/05   2,7,8,9,155,15,16              0   JOD



RED HOOK CSD
District No.: 13-17-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Senior High School:
Reconstruction               0-005-006  02/17/05   16                       278,500   DDJ

Mill Rd. Elementary:
Reconstruction               0-006-005  04/19/05   2,15                     100,000   DDJ

:
Discovered Building          7-020-001  08/22/05                                  0   HCM

Red Hook VFW:
Temporary Quarters           8-021-001  05/25/05                                  0   DDJ



RHINEBECK CSD
District No.: 13-18-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

High School:
Reconstruction               0-002-015  07/22/05   8,155,16                       0   DDJ

Livingston Elem. School:
Reconstruction               0-004-012  07/22/05   8,155,16                       0   DDJ

Administrative Building:
Temporary Quarters           1-009-001  05/02/05                                  0   DDJ



WAPPINGERS CSD
District No.: 13-21-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Evans Elementary School:
Reconstruction               0-003-016  04/15/05   155,15,16                227,920   HCM

Van Wyck Junior High School:
Reconstruction               0-017-016  04/12/05   2,15                      39,000   HCM

John Jay High School:
Reconstruction               0-020-024  04/12/05   2,15                      75,000   HCM

:
New Construction             0-045-001  12/01/05   02 - 16                        0   HCM

Laerdal:
Reconstruction               8-044-L01  05/26/05                                  0   HCM



BOCES DUTCHESS
District No.: 13-90-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Special Education Center:
Reconstruction               0-001-020  04/06/05   2,9,10,155,15,16               0   JOD
Reconstruction               0-001-021  08/09/05   2,155,15,16                    0   JOD

:
Reconstruction               8-039-L01  08/01/05                                  0   JOD

***ERIE COUNTY***


WILLIAMSVILLE CSD
District No.: 14-02-03-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Dodge Elem. School 4:
Reconstruction               0-002-010  10/26/05   2,4,9,10,14,155,15,1           0   DDJ

Maple Elem. East 6:
Reconstruction               0-003-010  10/26/05   2,4,9,10,14,155,15,1           0   DDJ

Mill Middle School 2:
Reconstruction               0-004-016  10/26/05   2,7,8,9,10,14,155,15           0   DDJ

South Senior High:
Reconstruction               0-005-017  10/26/05   2,4,7,9,10,14,155,15           0   DDJ

Forest Elementary #5:
Reconstruction               0-006-011  02/10/05   2,10                     600,000   DDJ
Reconstruction               0-006-012  10/26/05   2,8,9,10,14,155,15,1           0   DDJ

Heim Middle School 7:
Reconstruction               0-007-011  10/26/05   2,9,10,14,15,16                0   DDJ

Heim Elementary School #8:
Reconstruction               0-008-013  11/02/05   2,4,7,9,10,155,15,16           0   DDJ

Maple West Elementary School #9:
Reconstruction               0-009-009  10/26/05   2,10,14,155,15,16              0   DDJ

North Senior High:
Reconstruction               0-010-014  05/02/05   13                       500,000   DDJ
Reconstruction               0-010-015  10/26/05   2,7,8,13,14,155,15,1           0   DDJ

Country Pkwy. Elem. 11:
Reconstruction               0-011-009  10/26/05   2,8,9,10,14,155,15,1           0   DDJ

Casey Middle School:
Reconstruction               0-012-016  10/25/05   7,10,14,155,15,16              0   DDJ

Williamsville East H.S.:
Additions and Alterations    0-016-014  04/12/05   02 - 16                   20,000   DDJ
Reconstruction               0-016-015  10/26/05   2,8,9,10,15,16                 0   DDJ

Transit Middle School:
Reconstruction               0-029-009  10/24/05   2,7,10,155,15,16               0   DDJ

:
New Construction             7-049-001  07/20/05   02 - 16                        0   DDJ



SWEET HOME CSD
District No.: 14-02-07-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Sweet Home High School:
Reconstruction               0-003-007  01/14/05   2,4,7,8,9,155,15,16            0   RDR

Glendale Elementary:
Reconstruction               0-006-006  01/14/05   2,4,7,8,9,155,15,16      330,813   RDR

Maplemere Elementary:
Reconstruction               0-007-006  01/14/05   2,4,7,8,9,155,15,16            0   RDR

Willow Ridge Elementary:
Reconstruction               0-009-006  01/14/05   2,4,7,8,9,155,15,16            0   RDR

Heritage Heights Elementary:
Reconstruction               0-012-007  01/14/05   2,4,7,8,9,155,15,16      475,817   RDR



EAST AURORA UFSD
District No.: 14-03-01-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Parkdale Elementary:
Additions and Alterations    0-004-006  08/11/05   02 - 16                        0   JOD

Middle School:
Additions and Alterations    0-006-013  08/11/05   02 - 16                        0   JOD

Senior High School:
Additions and Alterations    0-010-012  08/11/05   02 - 16                        0   JOD

:
New Construction             3-013-001  08/11/05   02 - 16                        0   JOD



BUFFALO CITY SCHOOLS
District No.: 14-06-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Public School #4:
Reconstruction               0-004-008  01/20/05   155                            0   JOD

Hilary Park Academy P.S.#27:
Reconstruction               0-027-009  01/20/05   155                            0   JOD
Reconstruction               0-027-010  09/13/05   155,16                         0   JOD

Montessori/Bennett #32:
Reconstruction               0-032-010  02/25/05   8,9                            0   JOD

Public School #36:
Reconstruction               0-036-013  01/20/05   155                            0   JOD
Reconstruction               0-036-014  09/15/05   155,16                         0   JOD

Academy School #43:
Reconstruction               0-043-012  02/25/05   4,8,9,155,15,16          590,510   JOD

Fred Law Olmstead PS 56:
Reconstruction               0-056-006  01/20/05   155                            0   JOD
Reconstruction               0-056-007  09/13/05   155,16                         0   JOD

North Park Academy #66:
Reconstruction               0-066-009  01/20/05   155                            0   JOD
Reconstruction               0-066-010  09/13/05   155,16                         0   JOD

Houghton Academy #69:
Reconstruction               0-069-013  09/13/05   155,16                         0   JOD

Southside Elementary:
Reconstruction               0-093-007  01/20/05   4,8,9,155,16             583,470   JOD

Traditional High School:
Reconstruction               0-192-009  09/13/05   155,16                         0   JOD

Grover Cleveland High School:
Reconstruction               0-202-014  01/20/05   155                            0   JOD
Reconstruction               0-202-015  09/13/05   155,16                         0   JOD

Kensington High:
Reconstruction               0-203-018  02/08/05   15,16                          0   JOD

Burgard Vocational HS:
Reconstruction               0-301-017  04/11/05   4                        790,500   JOD

Hutchinson-Central Tech HS:
Reconstruction               0-304-013  02/08/05   15,16                          0   JOD

International Inst.:
Reconstruction               8-102-L01  06/24/05                                  0   JOD

Emerson-Culinary Arts/Metropole:
Reconstruction               8-308-002  01/14/05   10                             0   JOD



CHEEKTOWAGA CSD
District No.: 14-07-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Union Rd. Sch. (Offices):
Reconstruction               1-003-002  04/18/05   2,13                     177,994   JOD

District Garage:
Reconstruction               2-011-001  04/18/05   2,4,7,8,9,155,15,16            0   JOD



CHEEKTOWAGA-SLOAN UFSD
District No.: 14-07-09-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Woodrow Wilson Elem.:
Additions and Alterations    0-001-007  04/06/05   02 - 16                5,678,348   JOD

Roosevelt Elem. School:
Additions and Alterations    0-002-007  04/06/05   02 - 16                4,621,773   JOD

JF Kennedy Jr/Sr High School:
Additions and Alterations    0-004-011  04/06/05   02 - 16                6,324,755   JOD

Team Room/Garage:
Reconstruction               0-005-004  04/06/05   4,9,10,155,15,16         175,124   JOD



EDEN CSD
District No.: 14-12-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Eden Elementary:
Reconstruction               0-001-010  08/30/05   2,7,14,155                     0   DDJ

G.L. Priess Elementary:
Reconstruction               0-002-011  08/30/05   2,7,16                         0   DDJ

Senior High School:
Reconstruction               0-006-009  08/30/05   2,4,7,14,155                   0   DDJ

District Wide:
Reconstruction               7-999-003  05/26/05   16                       233,800   DDJ



IROQUOIS CSD
District No.: 14-13-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Middle School:
Reconstruction               0-002-016  07/21/05   4                              0   DDJ

Iroquois Intermediate:
Reconstruction               0-004-010  07/21/05   4                              0   DDJ

Senior High School:
Reconstruction               0-007-016  11/25/05   10                             0   DDJ

Toilet Facilities:
New Construction             7-020-001  02/04/05   02 - 16                  900,000   DDJ



GRAND ISLAND CSD
District No.: 14-15-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Kaegebein Elementary School:
Reconstruction               0-002-005  02/01/05   2,4,7,8,10,155,15,16   2,362,550   MAC



FRONTIER CSD
District No.: 14-16-04-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Amsdell Hghts. Junior High:
Reconstruction               0-013-014  02/18/05   15                       250,000   DDJ



HOLLAND CSD
District No.: 14-17-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Brumstead Elementary School:
Reconstruction               0-002-005  01/20/05   2,4,7,8,9,155,15,16      543,562   HCM

High School:
Reconstruction               0-003-010  01/20/05   2,4,7,8,155,15,16      1,568,811   HCM

Middle School:
Reconstruction               0-013-008  01/20/05   2,4,7,8,9,155,15,16    1,032,729   HCM

Bus Garage:
Reconstruction               5-004-005  01/20/05   2,8,16                   354,898   HCM



LACKAWANNA CITY SCHOOLS
District No.: 14-18-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Sr. High Lackawanna:
Reconstruction               0-001-011  01/28/05   2,4,10                         0   JOD

McKinley Elementary School:
Reconstruction               0-009-008  01/28/05   4                              0   JOD

New Elementary School(Martin Rd.):
Reconstruction               0-011-002  01/28/05   2                              0   JOD



AKRON CSD
District No.: 14-21-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

K-12 Main Building:
Reconstruction               0-001-007  01/21/05   2,4,7,9,155,15,16        552,972   JOD



ORCHARD PARK CSD
District No.: 14-23-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Senior High School:
Reconstruction               0-002-014  03/11/05   7,155                  1,328,909   JOD
Reconstruction               0-002-015  03/17/05   7,155                  2,320,307   JOD

Middle School:
Reconstruction               0-003-015  03/11/05   7,155                    834,827   JOD
Reconstruction               0-003-016  03/17/05   7,155                  1,653,269   JOD

South Davis Elementary:
Reconstruction               0-004-016  03/11/05   7,155                    622,053   JOD
Reconstruction               0-004-017  03/17/05   7,155                    840,635   JOD



KENMORE UFSD
District No.: 14-26-01-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Kenmore Middle:
Reconstruction               0-017-014  03/23/05   4                         81,850   DDJ

Bus Garage @ Military Rd.:
Alterations                  5-034-001  09/02/05   02 - 16                        0   DDJ



WEST SENECA CSD
District No.: 14-28-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

West Junior High:
Reconstruction               0-002-012  04/11/05   155                      165,006   HCM

Winchester Elementary School:
Reconstruction               0-009-016  04/11/05   8,155                    604,942   HCM

Potters Road Elem. School:
Reconstruction               0-014-010  04/11/05   155                      190,306   HCM



BOCES ERIE I
District No.: 14-91-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Potter School Occ Center:
Reconstruction               0-008-009  12/22/04   4,9,155,15,16            210,900   JOD
Reconstruction               0-008-010  07/22/05   4,9,155,15,16                  0   JOD



BOCES ERIE II-CHAUTAUQUA-CATTARAUGUS
District No.: 14-92-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Hewes C Building:
Reconstruction               0-001-009  09/02/05   7                        199,200   JOD

Hewes A Building:
Reconstruction               0-002-011  09/02/05   7                        698,600   JOD

Hewes B Bldg.:
Reconstruction               0-003-011  09/02/05   7                        382,100   JOD

Hewes E Building:
Reconstruction               0-005-010  05/31/05   2,8,9,155,15,16          985,100   JOD

Willis H Carrier:
Reconstruction               0-006-013  06/01/05   2,4,8,9,155,16         1,030,900   JOD

Ormsby Voc. Tech. Ctr.:
Reconstruction               0-007-009  06/01/05   2,4,8,9,155,16           617,900   JOD

Hewes T Building:
Reconstruction               0-011-007  06/01/05   2,4,7,155,15,16          156,000   JOD

Loguidice A Building:
Reconstruction               0-013-013  06/01/05   2,4,8,9,155,16           703,600   JOD

Loguidice B Bldg.:
Reconstruction               0-014-011  07/21/05   4,7                      355,500   JOD

Louidice Building C:
Reconstruction               0-015-009  07/21/05   4,7                      138,500   JOD

Loguidice D Bldg:
Reconstruction               0-016-006  06/01/05   2,4,13,155,16            238,300   JOD

Loguidice E Building:
Reconstruction               0-017-013  06/01/05   2,155,15,16              505,800   JOD

Loguidice T Bldg:
Reconstruction               0-018-009  06/01/05   2,13,155,15,16           218,800   JOD

The Park Associates:
Reconstruction               8-066-L01  06/08/05                                  0   JOD

***ESSEX COUNTY***


MORIAH CSD
District No.: 15-09-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Main Building:
Reconstruction               0-008-013  10/21/05   2,4,7,8,9,10,155,15,           0   HCM

Bus Garage:
Reconstruction               5-007-004  10/24/05   2,4,7,8,10,155,15,16           0   HCM



LAKE PLACID CSD
District No.: 15-11-02-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Annex Building - Jr./Sr. High School:
Additions and Alterations    1-008-003  12/01/05   02 - 16                        0   JOD

Restrooms - Athletic Fields:
Additions and Alterations    7-009-002  12/01/05   02 - 16                        0   JOD



SCHROON LAKE CSD
District No.: 15-14-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Central School:
Additions and Alterations    0-001-006  01/19/05   02 - 16                        0   HCM

Bus Garage:
Reconstruction               5-002-002  01/19/05   2,4,7,8,9,155,15,16            0   HCM



WILLSBORO CSD
District No.: 15-17-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

New K-12:
Reconstruction               0-007-002  09/13/05   16                             0   DDJ

***FRANKLIN COUNTY***


SALMON RIVER CSD
District No.: 16-12-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Main Bldg. Campus:
Reconstruction               0-001-015  01/03/05   2,8,9,155,15             700,000   DDJ



MALONE CSD
District No.: 16-15-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Malone Junior High School:
Reconstruction               0-001-008  03/17/05   8                         55,000   JOD

St.Joseph's Elem. School:
Reconstruction               0-011-004  03/17/05   2,7                      295,000   JOD



BRUSHTON MOIRA CSD
District No.: 16-16-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Central School Building:
Reconstruction               0-001-008  11/21/05   8,155                          0   DDJ

Bus Garage:
Reconstruction               5-003-008  11/21/05   8,10,15                        0   DDJ



ST. REGIS FALLS CSD
District No.: 16-18-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Bus Garage (lease):
Reconstruction               5-004-L02  02/22/05                             37,400   HCM

***FULTON COUNTY***


GLOVERSVILLE CITY SCHOOLS
District No.: 17-05-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

High School:
Reconstruction               0-010-014  01/28/05   2,10                     290,595   DDJ

Storage Bldg. @ Middle School:
New Construction             2-029-001  03/30/05   02 - 16                   55,000   DDJ

Bus Garage (lease):
Reconstruction               5-024-L02  07/11/05                                  0   DDJ
Reconstruction               5-024-L03  07/11/05                                  0   DDJ
Reconstruction               5-024-L04  07/11/05                                  0   DDJ

Districtwide:
Reconstruction               7-999-002  04/06/05   16                             0   DDJ



JOHNSTOWN CITY SCHOOL DISTRICT
District No.: 17-06-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Warren Street School:
Reconstruction               0-003-005  03/15/05   2,13                           0   RDR

Knox Junior High School:
Reconstruction               0-006-004  02/17/05   2,155,16                       0   RDR

Pleasant Ave. School:
Reconstruction               0-007-009  02/17/05   7,155                          0   RDR
Reconstruction               0-007-010  09/12/05   13,15                          0   RDR

Senior High School:
Additions and Alterations    0-009-006  02/17/05   02 - 16                        0   RDR
Reconstruction               0-009-007  10/07/05   2,4,13,155                     0   RDR

Glebe Street Elem.:
Reconstruction               0-010-005  02/17/05   2,7,155,16                     0   RDR

Jansen Avenue Elem. School:
Reconstruction               0-011-003  02/17/05   2,7,155,16                     0   RDR

Warehouse ABCD-Transportation Fac.:
Reconstruction               5-033-L02  04/07/05                                  0   RDR

Dugout #1 @ Baseball Field:
New Construction             7-034-001  05/13/05   02 - 16                        0   RDR

Dugout #2 @ Baseball Field:
New Construction             7-035-001  05/13/05   02 - 16                        0   RDR

Dugout #1 @ Softball Field:
New Construction             7-036-001  05/13/05   02 - 16                        0   RDR

Dugout #2 @ Softball Field:
New Construction             7-037-001  05/13/05   02 - 16                        0   RDR

GJSD Transportation/Maintenance Faci:
Reconstruction               8-038-L01  12/01/05                                  0   RDR



MAYFIELD CSD
District No.: 17-08-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Jr/Sr High School:
Reconstruction               0-001-015  03/23/05   2,4,8,9,10,155,15,16           0   DDJ

Elementary School:
Reconstruction               0-002-011  03/30/05   2,8,9,10,155,15,16             0   DDJ

Storage Shed @ Elementary School:
Reconstruction               2-004-002  03/30/05   2,7,8,9,16                     0   DDJ

Storage Bldg.@ JR/SR High School:
New Construction             2-009-001  03/30/05   02 - 16                        0   DDJ

Storage Building @ Elementary School:
New Construction             2-010-001  03/30/05   02 - 16                        0   DDJ

Bus Garage:
Reconstruction               5-003-006  04/05/05   2,15,16                        0   DDJ



NORTHVILLE CSD
District No.: 17-09-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Storage Shed/Mini Bus Garage:
Discovered Building          2-011-001  12/22/04                                  0   HCM

***GENESEE COUNTY***


BATAVIA CITY SCHOOLS
District No.: 18-03-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Batavia Middle School:
Additions and Alterations    0-002-009  04/04/05   02 - 16                        0   HCM

Robert Morris School:
Reconstruction               0-005-006  04/04/05   2,4,8,9,10,155,15,16           0   HCM

Richmond Memorial Library:
Reconstruction               6-003-003  04/04/05   2,4,7,155,15,16                0   HCM



PAVILION CSD
District No.: 18-12-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Jr/Sr High School:
Reconstruction               0-001-005  09/28/05   2,13,16                        0   HCM

:
New Construction             2-007-001  09/28/05   02 - 16                        0   HCM
New Construction             7-008-001  09/28/05   02 - 16                        0   HCM



PEMBROKE CSD
District No.: 18-13-02-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Bus Garage:
Additions and Alterations    5-004-003  08/22/05   02 - 16                        0   HCM

***GREENE COUNTY***


CATSKILL CSD
District No.: 19-04-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Senior/Junior High School:
Reconstruction               0-005-013  01/14/05   2,155,15,16              776,634   HCM
Reconstruction               0-005-014  03/17/05   8,9,15,16                      0   HCM

Gazebo #2:
Discovered Building          7-031-001  05/26/05                                  0   HCM



GREENVILLE CSD
District No.: 19-07-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

District Office:
New Construction             1-017-001  02/23/05   02 - 16                        0   DDJ

Storage Building:
New Construction             2-018-001  02/23/05   02 - 16                        0   DDJ



HUNTER-TANNERSVILLE CSD
District No.: 19-09-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Junior Senior High:
Reconstruction               0-001-010  12/22/04   155                       89,000   DDJ



WINDHAM-ASHLAND-JEWETT CSD
District No.: 19-14-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Main Building:
Additions and Alterations    0-001-012  10/07/05   02 - 16                        0   HCM



BOCES OTSEGO NORTHERN CATSKILLS
District No.: 19-90-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Otsego Occupational Center:
Reconstruction               0-016-009  05/02/05   7                        663,502   JOD

***HAMILTON COUNTY***


INDIAN LAKE CSD
District No.: 20-04-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Indian Lake Central:
Reconstruction               0-001-014  10/07/05   4                              0   JOD

Town of Indian Lk. Highway Garage:
Reconstruction               5-006-L01  02/10/05                                  0   JOD



LAKE PLEASANT CSD
District No.: 20-06-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Bus Storage/Maintenance Building:
Reconstruction               5-004-L03  12/12/05                                  0   RDR



LONG LAKE CSD
District No.: 20-07-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Main Building K-12:
Reconstruction               0-001-016  03/30/05   16                        62,975   HCM
Reconstruction               0-001-017  03/30/05   2,155                    200,000   HCM

***HERKIMER COUNTY***


WEST CANADA VALLEY CSD
District No.: 21-03-02-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Jr/Sr High:
Reconstruction               0-003-008  07/19/05   8,10,13,16                84,500   HCM
Reconstruction               0-003-009  07/25/05   8,10,13                        0   HCM



DOLGEVILLE CSD
District No.: 21-10-03-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

James A Green School:
Reconstruction               0-001-013  09/20/05   2,4,7,8,9,10,13,155,           0   RDR



POLAND CSD
District No.: 21-11-03-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Main Building:
Reconstruction               0-002-016  07/26/05   8,155,16                 409,988   RDR

Bus Storage Garage:
Reconstruction               4-001-005  07/26/05   155,16                    52,446   RDR

***JEFFERSON COUNTY***


ALEXANDRIA CSD
District No.: 22-02-02-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Alexandria Central:
Reconstruction               0-001-010  07/20/05   2,155,15,16              830,621   JOD

Bus Garage:
Reconstruction               0-004-002  07/21/05   16                        10,969   JOD



THOUSAND ISLANDS CSD
District No.: 22-07-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Junior Senior High:
Reconstruction               0-011-006  04/19/05   9,16                      60,000   RDR



BELLEVILLE HENDERSON CSD
District No.: 22-09-09-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

K-12 School:
Additions and Alterations    0-010-004  12/01/05   02 - 16                        0   DDJ



SACKETS HARBOR CSD
District No.: 22-10-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Sackets Harbor Central:
Reconstruction               0-001-007  10/07/05   2,4,7,8,9,10,155,15,           0   RDR



WATERTOWN CITY SCHOOLS
District No.: 22-20-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

North Elementary:
Reconstruction               0-010-005  05/13/05   4,8,9,10,14,155,15,1           0   HCM

Knickerbocker Elementary:
Additions and Alterations    0-011-003  05/13/05   02 - 16                        0   HCM

Sherman Elementary School:
Additions and Alterations    0-012-003  05/13/05   02 - 16                        0   HCM

Watertown High School:
Additions and Alterations    0-015-005  05/13/05   02 - 16                        0   HCM

Ohio Street Elementary:
Reconstruction               0-016-003  05/13/05   9,155,15,16                    0   HCM
Additions and Alterations    0-016-003  05/13/05   02 - 16                        0   HCM

H.T.Wiley Elementary:
Reconstruction               0-021-008  05/13/05   2,4,7,8,9,10,14,155,           0   HCM



CARTHAGE CSD
District No.: 22-22-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Great Bend Grade School:
Reconstruction               0-008-005  10/19/05   7                              0   JOD

***LEWIS COUNTY***


COPENHAGEN CSD
District No.: 23-02-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Main Building:
Reconstruction               0-001-013  11/29/05   4,8,9                          0   DDJ

***LIVINGSTON COUNTY***


CALEDONIA MUMFORD CSD
District No.: 24-02-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Jr/Sr High School:
Reconstruction               0-001-004  03/14/05   2,4,7,8,9,14,155,15,   3,424,540   JOD

Elementary School:
Reconstruction               0-003-006  03/23/05   2,4,7,8,9,14,155,15,   1,696,160   JOD

Admin/Classroom Bldg.:
Reconstruction               1-002-005  03/23/05   2,4,7,8,9,14,155,15,           0   JOD

New Bus Garage:
Reconstruction               5-006-003  03/23/05   2,4,8,9,14,155,15,16           0   JOD

:
New Construction             7-010-001  12/01/05   02 - 16                        0   JOD
New Construction             7-013-001  08/22/05   02 - 16                   10,000   JOD
New Construction             7-014-001  08/22/05   02 - 16                   96,000   JOD



DALTON-NUNDA CSD
District No.: 24-11-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

:
Reconstruction               7-999-001  04/06/05   16                             0   JOD



YORK CSD
District No.: 24-17-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Athletic Storage:
Discovered Building          2-006-001  05/11/05                                  0   DDJ



BOCES GENESEE VALLEY (GEN-LIV-STEU-)
District No.: 24-90-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

C.May Occup Ctr at Mt Morris:
Additions and Alterations    0-002-008  02/15/05   02 - 16                        0   JOD

Area Occup. Bldg. A:
Additions and Alterations    0-019-002  02/15/05   02 - 16                        0   JOD

Saw Mill Barn:
New Construction             2-042-001  04/13/05   02 - 16                        0   JOD

Animal Barn:
New Construction             2-043-001  04/13/05   02 - 16                        0   JOD

Districtwide:
Reconstruction               7-999-003  02/15/05   16                             0   JOD
Reconstruction               7-999-004  10/28/05   16                             0   JOD

***MONROE COUNTY***


BRIGHTON CSD
District No.: 26-01-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Brighton Senior High:
Reconstruction               0-003-018  08/26/05   10                     1,410,000   DDJ



GATES CHILI CSD
District No.: 26-04-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Gates Chili High:
Additions and Alterations    0-001-011  12/22/04   02 - 16                        0   DDJ

Florence Brasser:
Reconstruction               0-002-009  12/22/04   2,4,7,8,9,14,155,15,           0   DDJ
Reconstruction               0-002-010  11/21/05   13,155,15,16                   0   DDJ

Washington Irving School:
Additions and Alterations    0-005-009  12/22/04   02 - 16                        0   DDJ
Reconstruction               0-005-010  11/21/05   10,155,15,16                   0   DDJ

Middle School:
Additions and Alterations    0-006-007  12/22/04   02 - 16                        0   DDJ
Reconstruction               0-006-008  11/21/05   10,155,15,16                   0   DDJ

Paul Rd Elementary:
Reconstruction               0-007-010  12/22/04   2,10,155,15,16                 0   DDJ
Reconstruction               0-007-011  11/21/05   10,155,15,16                   0   DDJ

Walt Disney School:
Additions and Alterations    0-008-009  12/22/04   02 - 16                        0   DDJ
Reconstruction               0-008-010  11/21/05   10,155,15,16                   0   DDJ

Neil Armstrong Elementary:
Additions and Alterations    0-009-009  12/22/04   02 - 16                        0   DDJ
Reconstruction               0-009-010  11/21/05   10,155,15,16                   0   DDJ

:
New Construction             0-017-001  12/07/05   02 - 16                        0   DDJ

Administration Building:
Reconstruction               1-003-006  12/22/04   2,4,9,155,15,16                0   DDJ

Trans.& Facilities Complex:
Reconstruction               5-004-007  12/22/04   2,4,7,8,9,155,15,16            0   DDJ

New Transportation Building:
New Construction             5-016-001  12/22/04   02 - 16                4,647,830   DDJ



GREECE CSD
District No.: 26-05-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Greece Olympia High School:
Reconstruction               0-004-025  12/20/05   10                             0   HCM

Odyssey Mid/High (fmly Hoover):
Reconstruction               0-005-016  12/20/05   2,10,155,15,16                 0   HCM

Paddy Hill School:
Reconstruction               0-007-012  12/20/05   8,9,10,155,15,16               0   HCM

West Ridge School:
Reconstruction               0-008-011  12/20/05   10,16                          0   HCM

Arcadia High/Middle School:
Reconstruction               0-012-029  12/20/05   2,7,8,9,10,155,15,16           0   HCM

Holmes Road Elementary:
Reconstruction               0-016-006  12/20/05   2,7,10,15                      0   HCM

Athena Middle/High School:
Reconstruction               0-017-029  12/20/05   2,7,8,9,10,155,15,16           0   HCM

Kirk Road Elem.:
Reconstruction               0-018-014  12/20/05   10                             0   HCM

Apollo Middle School:
Reconstruction               0-031-016  12/20/05   2,8,10                         0   HCM

Pine Brook Elementary:
Reconstruction               0-036-004  12/20/05   10                             0   HCM

Bldg Grounds/Bus Storage:
Reconstruction               5-024-008  12/20/05   8,9,155,15,16                  0   HCM



EAST IRONDEQUOIT CSD
District No.: 26-08-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Bishop Kearney High School:
Reconstruction               8-015-L01  02/17/05                                  0   RDR



WEST IRONDEQUOIT CSD
District No.: 26-08-03-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Irondequoit High School:
Reconstruction               0-001-020  03/14/05   8                        404,400   RDR
Reconstruction               0-001-021  04/19/05   16                         3,500   RDR

Ruben Dake JH School 7-8:
Reconstruction               0-002-008  03/14/05   8                        195,600   RDR
Reconstruction               0-002-009  04/19/05   9,16                      23,500   RDR

Rogers/Southlawn School:
Reconstruction               0-003-010  04/19/05   16                         3,500   RDR

Iroquois/Colebrook School:
Reconstruction               0-004-008  04/19/05   10,16                     88,800   RDR

Seneca Elem School K-3:
Reconstruction               0-006-005  04/19/05   9,10,16                      500   RDR

New Listwood School:
Reconstruction               0-027-002  04/19/05   16                           500   RDR

New Brookview Elementary:
Reconstruction               0-028-002  04/19/05   16                           500   RDR

New Briarwood Elementary:
Reconstruction               0-029-002  04/19/05   16                           500   RDR

Colebrook:
Reconstruction               0-032-002  04/19/05   16                           500   RDR



HILTON CSD
District No.: 26-11-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

West Avenue Elementary:
Reconstruction               0-001-009  11/23/05   2,8,9,155,15,16                0   RDR

Northwood Elementary School:
Reconstruction               0-003-010  11/23/05   2,8,9,16                       0   RDR

Village Elementary:
Reconstruction               0-004-008  11/23/05   2,8,15,16                      0   RDR

Merton Williams Middle School:
Reconstruction               0-005-009  11/23/05   2,4,8,10,15,16                 0   RDR

High School:
Reconstruction               0-007-010  11/23/05   2,4,8,10,155,15,16             0   RDR

Transportation Maint. Facility:
Reconstruction               5-010-010  11/23/05   2,8,16                         0   RDR



PENFIELD CSD
District No.: 26-12-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Indian Landing Elementary:
Reconstruction               0-002-008  08/25/05   2,4,7,8,9,10,13,155,           0   RDR

Penfield Senior High:
Reconstruction               0-005-011  03/24/05   2                        100,000   RDR
Additions and Alterations    0-005-012  08/25/05   02 - 16                        0   RDR

Cobbles Elementary:
Reconstruction               0-006-010  08/25/05   2,4,7,8,9,10,13,155,           0   RDR

Scribner Rd Elem:
Reconstruction               0-007-008  08/25/05   2,4,7,8,9,10,13,155,           0   RDR

Bay Trail Junior High School:
Additions and Alterations    0-008-008  08/12/05   02 - 16                        0   RDR

Harris Hill Elementary:
Reconstruction               0-009-011  08/12/05   2,4,7,8,9,10,13,155,           0   RDR

District Office:
Additions and Alterations    1-001-005  08/25/05   02 - 16                        0   RDR

Maintenance Bldg:
Additions and Alterations    3-004-002  08/25/05   02 - 16                        0   RDR

:
New Construction             3-026-001  09/28/05   02 - 16                        0   RDR

Bus Garage:
Additions and Alterations    5-010-004  08/25/05   02 - 16                        0   RDR

:
New Construction             5-027-001  09/28/05   02 - 16                        0   RDR
New Construction             7-025-001  08/22/05   02 - 16                        0   RDR



FAIRPORT CSD
District No.: 26-13-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

J. Perrin Middle School:
Reconstruction               0-001-011  07/06/05   7                              0   DDJ

Minerva Deland HS (9-12):
Reconstruction               0-002-015  07/06/05   7                              0   DDJ

Martha Brown Middle School:
Reconstruction               0-003-011  06/24/05   7                              0   DDJ

Brooks Hill Elem (K-5):
Reconstruction               0-004-010  07/06/05   7                              0   DDJ
Additions and Alterations    0-004-011  07/06/05   02 - 16                        0   DDJ

Jefferson Ave Elem (K-5):
Reconstruction               0-006-012  07/06/05   7                              0   DDJ
Additions and Alterations    0-006-013  07/06/05   02 - 16                        0   DDJ

Fairport HS (9-12):
Additions and Alterations    0-007-013  07/06/05   02 - 16                        0   DDJ

Northside Elem (3-5):
Additions and Alterations    0-008-006  07/06/05   02 - 16                        0   DDJ
Reconstruction               0-008-007  06/24/05   7                              0   DDJ

Dudley Elem (K-2):
Reconstruction               0-009-010  06/24/05   2,4,8,9,155,15,16              0   DDJ
Reconstruction               0-009-011  07/06/05   7                              0   DDJ

Streppa Building:
Additions and Alterations    1-005-003  06/30/05   02 - 16                        0   DDJ

New Administration Office Bldg.:
Reconstruction               1-023-003  07/06/05   2,7,8,9,155,15,16              0   DDJ

Maintenance Bldg.:
Reconstruction               3-011-003  07/06/05   2,8,9,155,15,16                0   DDJ

Bus Center:
Reconstruction               5-010-009  04/12/05   2,155,16                 100,000   DDJ
Additions and Alterations    5-010-010  07/06/05   02 - 16                        0   DDJ

:
New Construction             5-024-001  06/27/05   02 - 16                        0   DDJ
New Construction             7-025-001  06/27/05   02 - 16                        0   DDJ

Press Box @ Fairport High School:
New Construction             7-026-001  06/27/05   02 - 16                        0   DDJ



EAST ROCHESTER UFSD
District No.: 26-13-13-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

E. Rochester Educ. Cmplx.(O'Bourn):
Additions and Alterations    0-001-015  04/06/05   02 - 16                        0   RDR

Morgan Middle School:
Reconstruction               0-002-009  12/05/05   2,4,7,9                        0   JOD

Lois E. Bird Elementary:
Reconstruction               0-003-008  11/02/05   2,4,7,9                        0   JOD



PITTSFORD CSD
District No.: 26-14-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Jefferson Rd. Elementary:
Reconstruction               0-002-021  05/26/05   155,15,16                112,000   JOD

Pittsford High Sch. (Mendon):
Reconstruction               0-009-019  05/26/05   15                             0   JOD



ROCHESTER CITY SCHOOLS
District No.: 26-16-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

#2 Clara Barton K-6:
Reconstruction               0-002-014  07/27/05   2,4,9,16                       0   RDR

#3 Nathaniel Rochester Cmmty K-8:
Reconstruction               0-003-015  07/27/05   8,9,155,16                     0   RDR

#4 G.M.Forbes K-6:
Reconstruction               0-004-018  07/27/05   4,8,9,155,15,16                0   RDR

#5 J.Williams K-5:
Reconstruction               0-005-020  07/28/05   2,4,7,8,9,155,15,16            0   RDR

#6 Dag Hammarskjold K-6:
Reconstruction               0-006-016  07/28/05   4,8,9                          0   RDR

#7 Virgil Grissom K-6:
Reconstruction               0-007-015  07/28/05   2,8,9,155,15,16          795,000   RDR

#28 Henry Hudson K-6:
Reconstruction               0-028-020  07/28/05   4,9,155,15,16                  0   RDR

#29 Adlai Stevenson K-6:
Reconstruction               0-029-019  07/28/05   2,8,9                          0   RDR

#30 Gen E.S.Otis K-6:
Reconstruction               0-030-019  07/28/05   2,8,9,16                       0   RDR

Dr. Freddie Thomas Lrng. Ctr.:
Reconstruction               0-031-008  07/28/05   2,4,7,8,9,155,16               0   RDR

Audubon K-6:
Reconstruction               0-033-019  07/28/05   2,4,7,8,9,155,15,16            0   RDR

#39 A.J.Townson K-6:
Reconstruction               0-039-015  07/28/05   2,8,155,16                     0   RDR

#42 Abelard Reynolds K-6:
Reconstruction               0-042-013  01/14/05   155,15,16                      0   RDR

#46 C.Carroll K-6:
Reconstruction               0-046-018  07/28/05   7,10                           0   RDR

Franklin HS 9-12:
Reconstruction               0-101-026  08/01/05   4,8,9,155,15,16                0   RDR

Charlotte M.S. 6-8:
Reconstruction               0-102-025  07/28/05   9,10,155,15,16         1,580,000   RDR

East High School  9-12:
Reconstruction               0-103-024  04/08/05   2,9                      500,000   RDR
Reconstruction               0-103-025  07/28/05   2,4,9,155,15,16                0   RDR

Jefferson M.S. 6-8:
Reconstruction               0-105-022  08/01/05   2,4,8,9,155,15,16              0   RDR

Edison Tech/Occ H.S. 9-12:
Reconstruction               0-111-022  07/28/05   9,155,15,16                    0   RDR

Service Station:
Reconstruction               0-117-002  12/29/04   4,8,9,16                       0   RDR

Central Office:
Reconstruction               1-053-010  08/01/05   4,7                            0   RDR

Trans. Bldg. @ Service Center:
Reconstruction               5-078-105  08/01/05   2                              0   RDR

Recreation Bldg:
Reconstruction               7-058-001  07/27/05   2,4,8,9,15,16                  0   RDR

Rochester Bus. Institute-RBI Tutoria:
Reconstruction               8-121-004  10/14/05   2,8,9,155,15,16                0   RDR



RUSH HENRIETTA CSD
District No.: 26-17-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Roth Middle School:
Reconstruction               0-003-021  09/02/05   2,4,7,8,9,155,15,16            0   HCM

David Crane Elementary:
Reconstruction               0-009-016  03/03/05   7                        703,500   HCM

Burger Middle School:
Additions and Alterations    0-010-012  09/02/05   02 - 16                        0   HCM

Rush Henrietta Sperry School:
Additions and Alterations    0-011-024  09/02/05   02 - 16                        0   HCM



BROCKPORT CSD
District No.: 26-18-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Middle School:
Reconstruction               0-001-012  04/06/05   2,4,7,8,9,15,16        1,238,591   JOD

E. Barclay Elementary School:
Reconstruction               0-002-011  04/06/05   2,4,7,8,9,10,13,14,1   1,918,568   JOD

J. Ginther Elementary:
Reconstruction               0-004-010  04/06/05   2,8,155,15,16            448,443   JOD

Senior High School:
Reconstruction               0-007-019  04/06/05   2,4,9,10,155,15,16     2,596,362   JOD

Fred Hill Intermediate School:
Reconstruction               0-010-012  04/06/05   2,7,8,9,155,15,16        969,320   JOD

New Storage Bldg.:
Reconstruction               2-012-002  04/06/05   2                         79,641   JOD

Buildings & Grounds Facility:
Reconstruction               3-011-003  04/06/05   2                         79,641   JOD

Bus Garage(see 1-003):
Reconstruction               5-003-009  04/06/05   2,16                      48,173   JOD



WEBSTER CSD
District No.: 26-19-01-06
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Spry MS 7-9:
Additions and Alterations    0-001-009  07/26/05   02 - 16                        0   JOD

Klem Road North Elementary:
Additions and Alterations    0-003-007  07/26/05   02 - 16                        0   JOD

Plank Road North Elementary:
Additions and Alterations    0-009-009  07/26/05   02 - 16                        0   JOD

hewitt Road Elementary:
Additions and Alterations    0-010-006  07/26/05   02 - 16                        0   JOD

Thomas MS 7-9:
Additions and Alterations    0-011-019  07/26/05   02 - 16                        0   JOD

State Road Elementary:
Additions and Alterations    0-012-008  07/26/05   02 - 16                        0   JOD

Schroeder HS 10-12:
Reconstruction               0-013-018  07/26/05   2,8,9,10,155,15,16             0   JOD

Plank Road South Elementary:
Additions and Alterations    0-016-005  07/26/05   02 - 16                        0   JOD

Klem Road South Elementary:
Additions and Alterations    0-017-005  07/26/05   02 - 16                        0   JOD

Schlegel Road Elementary:
Additions and Alterations    0-018-005  07/26/05   02 - 16                        0   JOD

Maintenance Storage Building:
Additions and Alterations    2-015-002  09/28/05   02 - 16                        0   JOD

Bus Garage Annex:
Reconstruction               5-007-004  09/28/05   2,7,8,9,155,15,16              0   JOD

New Bus Garage:
Reconstruction               5-028-002  09/28/05   2,9                            0   JOD



WHEATLAND CHILI CSD
District No.: 26-20-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Thomas J. Connor Elementary:
Reconstruction               0-002-010  03/22/05   2,7,8,9,15,16          1,649,500   RDR

Junior Senior High School:
Reconstruction               0-003-010  03/22/05   2,7,8,9,10,155,15,16   5,929,700   RDR

Bus Garage:
Reconstruction               5-004-005  03/22/05   2,4,7,8,9,155,15,16    1,417,800   RDR



BOCES MONROE II-ORLEANS
District No.: 26-92-00-00
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

:
Reconstruction               8-047-L01  07/19/05                                  0   JOD
Temporary Quarters           8-048-001  10/21/05                                  0   JOD

***MONTGOMERY COUNTY***


AMSTERDAM CITY SCHOOLS
District No.: 27-01-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Wilbur H Lynch Middle School:
Reconstruction               0-028-022  05/31/05   155,15                         0   HCM

Administration Bldg.:
Reconstruction               1-001-003  12/21/05   13,16                          0   HCM



FONDA FULTONVILLE CSD
District No.: 27-06-01-04
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

K-4 Elementary:
Reconstruction               0-002-002  03/22/05   2,9,13,155,15,16       2,500,000   DDJ

***NASSAU COUNTY***


GLEN COVE CITY SCHOOLS
District No.: 28-01-00-01
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Middle School:
Reconstruction               0-003-007  01/07/05   8,9,155,15,16                  0   RDR
Reconstruction               0-003-008  03/11/05   10,155,16              3,169,450   RDR
Reconstruction               0-003-009  12/14/05   10,16                          0   RDR

Deasy School:
Reconstruction               0-005-006  01/07/05   8,9,155,15,16                  0   RDR
Reconstruction               0-005-007  03/11/05   10,155,16              1,362,921   RDR

Connolly Elementary School:
Reconstruction               0-007-010  01/07/05   8,155,15,16                    0   RDR
Additions and Alterations    0-007-011  02/17/05   02 - 16                  381,277   RDR
Additions and Alterations    0-007-011  02/17/05   02 - 16                  381,277   RDR
Reconstruction               0-007-012  03/11/05   10,155,16                100,090   RDR
Reconstruction               0-007-013  12/14/05   10,16                          0   RDR

Landing Elementary School:
Reconstruction               0-008-010  01/07/05   8,9,155,15,16                  0   RDR
Additions and Alterations    0-008-011  02/17/05   02 - 16                        0   RDR
Additions and Alterations    0-008-011  02/17/05   02 - 16                        0   RDR
Additions and Alterations    0-008-011  02/17/05   02 - 16                  505,266   RDR
Reconstruction               0-008-012  03/11/05   10,155,16                168,770   RDR

Glen Cove High School:
Reconstruction               0-010-007  01/07/05   8,9,155,15,16                  0   RDR
Reconstruction               0-010-008  03/11/05   10,155,16              3,296,453   RDR
Reconstruction               0-010-009  12/14/05   10,16                          0   RDR

Eugene J. Gribbin Elementary:
Reconstruction               0-013-006  01/07/05   8,9,155,15,16                  0   RDR
Reconstruction               0-013-007  03/11/05   10,155,16                155,281   RDR
Reconstruction               0-013-008  12/14/05   10,16                          0   RDR

Thayer House:
Reconstruction               1-001-004  01/07/05   8,9,155,15,16                  0   RDR
Reconstruction               1-001-005  03/11/05   10,155,16                 35,400   RDR

Carriage House:
Reconstruction               1-002-002  03/11/05   10,155,16                  9,928   RDR

Bus Garage:
Reconstruction               5-009-001  01/10/05   8,9,155,16                     0   RDR
Reconstruction               5-009-002  03/11/05   10,155,16                 28,579   RDR



HEMPSTEAD UFSD
District No.: 28-02-01-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Senior High School:
Reconstruction               0-020-020  11/10/05   4,13                           0   JOD
Reconstruction               0-020-021  11/21/05   4,13                           0   JOD



UNIONDALE PUBLIC SCHOOLS
District No.: 28-02-02-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Northern Parkway School:
Reconstruction               0-002-025  03/03/05   2,4,10,16                 34,000   RDR
Reconstruction               0-002-026  09/14/05   4,8,9,16                       0   RDR
Reconstruction               0-002-027  10/21/05   2,4,8,9                        0   RDR

California Avenue Elementary:
Reconstruction               0-003-028  10/21/05   2,4,7,9,16                     0   RDR

Smith Street School:
Reconstruction               0-004-021  01/10/05   4,8                            0   RDR
Reconstruction               0-004-022  10/21/05   2,9                            0   RDR

Cornelius Court School:
Reconstruction               0-005-011  10/21/05   2,4,8,9                        0   RDR

Grand Avenue School:
Reconstruction               0-006-019  02/17/05   2,4,10,16                 34,000   RDR

Walnut Street Elementary:
Reconstruction               0-007-022  10/21/05   2,8,9,15,16                    0   RDR

Lawrence Road Junior High:
Reconstruction               0-008-026  10/21/05   2,4,9                          0   RDR

Uniondale High School:
Additions and Alterations    0-009-040  09/14/05   02 - 16                        0   RDR
Reconstruction               0-009-041  10/21/05   2,4,7,9,16                     0   RDR

Turtle Hook Junior High:
Reconstruction               0-010-022  10/21/05   2,7,8,9,15,16                  0   RDR



EAST MEADOW UFSD
District No.: 28-02-03-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Parkway Elementary:
Reconstruction               0-001-026  11/17/05   2,7,9                          0   DDJ

Meadowbrook Elementary:
Reconstruction               0-002-024  11/17/05   2,9                            0   DDJ

W T Clarke Middle/High School:
Reconstruction               0-004-034  04/21/05   2,4                       65,000   DDJ
Reconstruction               0-004-035  11/17/05   2,10                           0   DDJ

Barnum Woods Elementary:
Reconstruction               0-006-025  11/17/05   2,9                            0   DDJ

East Meadow High School:
Reconstruction               0-007-036  11/17/05   2,8,9,10                       0   DDJ

Woodland Middle School:
Reconstruction               0-009-029  11/17/05   2,9,16                         0   DDJ

George McVey Elementary:
Reconstruction               0-011-021  11/17/05   2,9                            0   DDJ

Bowling Green #1:
Reconstruction               0-012-023  11/17/05   2,9,10                         0   DDJ



NORTH BELLMORE UFSD
District No.: 28-02-04-02
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Jacob Gunther Elementary:
Reconstruction               0-001-017  01/05/05   2,13                      90,326   HCM

Martin Avenue:
Reconstruction               0-002-011  01/05/05   4,7                      360,750   HCM

Newbridge Road School:
Reconstruction               0-003-020  01/05/05   8,9,155,15,16             48,174   HCM

Park Avenue School:
Reconstruction               0-004-016  01/05/05   7                         67,250   HCM

Saw Mill Road School:
Reconstruction               0-005-022  01/05/05   2,7                            0   HCM

J.G. Dinkelmeyer Elementary:
Reconstruction               0-006-017  01/05/05   2,4,15                   149,850   HCM
Reconstruction               0-006-018  05/04/05   2,7                      401,500   HCM



LEVITTOWN UFSD
District No.: 28-02-05-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Jonas E. Salk MS/HS:
Reconstruction               0-002-018  09/02/05   2,9,155,15,16                  0   RDR

Division Avenue High School:
Reconstruction               0-003-016  09/02/05   2,16                           0   RDR

Horizon School (Laurel Ln.):
Reconstruction               0-007-005  09/06/05   2                              0   RDR

Northside School:
Reconstruction               0-008-011  09/02/05   13                             0   RDR

Wisdom Lane Middle School:
Reconstruction               0-011-016  09/02/05   2,7,13,16                      0   RDR

East Broadway:
Reconstruction               0-014-012  09/02/05   2                              0   RDR

Abbey Lane School:
Reconstruction               0-015-013  08/29/05   2,155,15,16                    0   RDR

General Douglas MacArthur HS:
Reconstruction               0-018-021  09/02/05   16                             0   RDR



ROOSEVELT UFSD
District No.: 28-02-08-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

High School Renovation:
Reconstruction               0-005-016  05/12/05   4,9,14,155,16                  0   RDR
Reconstruction               0-005-017  05/12/05   155,16                         0   RDR
Reconstruction               0-005-018  05/12/05   16                             0   RDR
Reconstruction               0-005-019  08/24/05   14,15,16                 850,000   RDR



FREEPORT UFSD
District No.: 28-02-09-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Freeport Memorial Library:
Reconstruction               6-008-005  10/27/05   7,155                          0   HCM



BALDWIN UNION FREE SD
District No.: 28-02-10-03
BUILDING NAME/               BLDG./     LETTER OF                        ESTIMATED    PRJ.
PROJECT SCOPE                PROJ. NO.  INTENT     CSI CODES             COST         MGR.
__________________________________________________________________________________________

Brookside Elementary:
Reconstruction               0-001-010  03/11/05   16                             0   DDJ
Reconstruction               0-001-011  03/11/05   2,155                     75,000   DDJ
Reconstruction