STATE AID BUILDING - PROSPECTIVE PROJECT AMORTIZATION
DISTRICT: 440102 WASHINGTONVILL DATE: 11/23/09
******************************************************************************************
PROJECT NUMBER: 0001-009 PROJECT NAME: JR HIGH SCHOOL
VOTER AUTHORIZATION DATE: 11/13/2003 BLD3
SA-139 HAS NOT BEEN RECEIVED FOR THIS PROJECT
******************************************************************************************
PROJECT NUMBER: 0001-010 PROJECT NAME: JR HIGH SCHOOL
VOTER AUTHORIZATION DATE: 05/15/2001 BLD3
JULY 2002 INTERIM YEARS JULY 2017
ASSUMED PAYMENTS: 1 2 1
DEBT SERVICE: 38,084 76,168 38,084
AMORTIZED PRINCIPAL: 824,340 CAPITAL OUTLAY: 198,349
CMMSR APP DATE: 12/27/01 DATE CONTRACT SIGNED: 03/19/02 INT RATE: 0.04500 PPU: 15
CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 03/19/2002
PROJECTS APPROVED BY THE COMMISSIONER PRIOR TO 7/1/2002 BUT AFTER 12/1/2001, THAT HAVE A
CAPITAL OUTLAY BALANCE AS OF 7/1/2002, WILL BE AMORTIZED STARTING 7/1/2004.
CLICK HERE FOR CAPITAL OUTLAY INFORMATION
******************************************************************************************
PROJECT NUMBER: 0001-011 PROJECT NAME: JR HIGH SCHOOL
VOTER AUTHORIZATION DATE: 04/19/2004 BLD3
JULY 2006 INTERIM YEARS JULY 2021
ASSUMED PAYMENTS: 1 2 1
DEBT SERVICE: 28,572 57,144 28,572
AMORTIZED PRINCIPAL: 639,908 CAPITAL OUTLAY: 0
CMMSR APP DATE: 09/19/05 DATE CONTRACT SIGNED: 11/10/05 INT RATE: 0.04000 PPU: 15
CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 03/28/2006
******************************************************************************************
PROJECT NUMBER: 0001-013 PROJECT NAME: JR HIGH SCHOOL
VOTER AUTHORIZATION DATE: 05/17/2005 BLD3
SA-139 HAS NOT BEEN RECEIVED FOR THIS PROJECT
******************************************************************************************
PROJECT NUMBER: 0001-014 PROJECT NAME: JR HIGH SCHOOL
VOTER AUTHORIZATION DATE: 05/16/2006 BLD4
JULY 2008 INTERIM YEARS JULY 2022
ASSUMED PAYMENTS: 2 2 2
DEBT SERVICE: 233,552 233,552 233,552
AMORTIZED PRINCIPAL: 2,637,801 CAPITAL OUTLAY: 626,978
CMMSR APP DATE: 06/19/07 DATE CONTRACT SIGNED: 12/18/07 INT RATE: 0.03875 PPU: 15
CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 02/26/2008
******************************************************************************************
PROJECT NUMBER: 0001-015 PROJECT NAME: JR HIGH SCHOOL
VOTER AUTHORIZATION DATE: 05/20/2009 BLD4
SA-139 HAS NOT BEEN RECEIVED FOR THIS PROJECT
******************************************************************************************
PROJECT NUMBER: 0001-016 PROJECT NAME: JR HIGH SCHOOL
VOTER AUTHORIZATION DATE: 05/20/2008 BLD4
SA-139 HAS NOT BEEN RECEIVED FOR THIS PROJECT
******************************************************************************************
PROJECT NUMBER: 0002-007 PROJECT NAME: TAFT ELEM SCHOOL
VOTER AUTHORIZATION DATE: 06/03/2003 BLD3
JULY 2005 INTERIM YEARS JULY 2019
ASSUMED PAYMENTS: 2 2 2
DEBT SERVICE: 114,340 114,340 114,340
AMORTIZED PRINCIPAL: 1,291,389 CAPITAL OUTLAY: 0
CMMSR APP DATE: 04/06/04 DATE CONTRACT SIGNED: 05/11/04 INT RATE: 0.03875 PPU: 15
CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 07/29/2004
******************************************************************************************
PROJECT NUMBER: 0002-008 PROJECT NAME: TAFT ELEM SCHOOL
VOTER AUTHORIZATION DATE: 04/19/2004 BLD3
JULY 2006 INTERIM YEARS JULY 2021
ASSUMED PAYMENTS: 1 2 1
DEBT SERVICE: 16,842 33,684 16,842
AMORTIZED PRINCIPAL: 377,196 CAPITAL OUTLAY: 0
CMMSR APP DATE: 09/19/05 DATE CONTRACT SIGNED: 11/10/05 INT RATE: 0.04000 PPU: 15
CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 03/28/2006
******************************************************************************************
PROJECT NUMBER: 0002-011 PROJECT NAME: TAFT ELEM SCHOOL
VOTER AUTHORIZATION DATE: 05/17/2005 BLD3
JULY 2008 INTERIM YEARS JULY 2022
ASSUMED PAYMENTS: 2 2 2
DEBT SERVICE: 3,422 3,422 3,422
AMORTIZED PRINCIPAL: 38,660 CAPITAL OUTLAY: 0
CMMSR APP DATE: 02/07/07 DATE CONTRACT SIGNED: 04/26/07 INT RATE: 0.03875 PPU: 15
CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 07/12/2007
******************************************************************************************
PROJECT NUMBER: 0002-012 PROJECT NAME: TAFT ELEM SCHOOL
VOTER AUTHORIZATION DATE: 05/16/2006 BLD4
JULY 2008 INTERIM YEARS JULY 2022
ASSUMED PAYMENTS: 2 2 2
DEBT SERVICE: 150,488 150,488 150,488
AMORTIZED PRINCIPAL: 1,699,657 CAPITAL OUTLAY: 431,473
CMMSR APP DATE: 06/19/07 DATE CONTRACT SIGNED: 08/22/07 INT RATE: 0.03875 PPU: 15
CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 02/26/2008
******************************************************************************************
PROJECT NUMBER: 0002-013 PROJECT NAME: TAFT ELEM SCHOOL
VOTER AUTHORIZATION DATE: 05/20/2009 BLD4
SA-139 HAS NOT BEEN RECEIVED FOR THIS PROJECT
******************************************************************************************
PROJECT NUMBER: 0004-009 PROJECT NAME: LITTLE BRITAIN ELEMENTARY SCHOOL
VOTER AUTHORIZATION DATE: 06/03/2003 BLD3
JULY 2005 INTERIM YEARS JULY 2019
ASSUMED PAYMENTS: 2 2 2
DEBT SERVICE: 83,724 83,724 83,724
AMORTIZED PRINCIPAL: 945,598 CAPITAL OUTLAY: 0
CMMSR APP DATE: 04/06/04 DATE CONTRACT SIGNED: 05/11/04 INT RATE: 0.03875 PPU: 15
CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 07/29/2004
******************************************************************************************
PROJECT NUMBER: 0004-010 PROJECT NAME: LITTLE BRITAIN ELEMENTARY SCHOOL
VOTER AUTHORIZATION DATE: 04/19/2004 BLD3
JULY 2006 INTERIM YEARS JULY 2021
ASSUMED PAYMENTS: 1 2 1
DEBT SERVICE: 27,613 55,226 27,613
AMORTIZED PRINCIPAL: 618,444 CAPITAL OUTLAY: 0
CMMSR APP DATE: 09/19/05 DATE CONTRACT SIGNED: 11/10/05 INT RATE: 0.04000 PPU: 15
CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 03/28/2006
******************************************************************************************
PROJECT NUMBER: 0004-012 PROJECT NAME: LITTLE BRITAIN ELEMENTARY SCHOOL
VOTER AUTHORIZATION DATE: 05/17/2005 BLD3
JULY 2008 INTERIM YEARS JULY 2022
ASSUMED PAYMENTS: 2 2 2
DEBT SERVICE: 19,906 19,906 19,906
AMORTIZED PRINCIPAL: 224,815 CAPITAL OUTLAY: 4,496
CMMSR APP DATE: 02/07/07 DATE CONTRACT SIGNED: 04/26/07 INT RATE: 0.03875 PPU: 15
CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 07/12/2007
******************************************************************************************
PROJECT NUMBER: 0004-013 PROJECT NAME: LITTLE BRITAIN ELEMENTARY SCHOOL
VOTER AUTHORIZATION DATE: 05/16/2006 BLD4
JULY 2008 INTERIM YEARS JULY 2022
ASSUMED PAYMENTS: 2 2 2
DEBT SERVICE: 28,706 28,706 28,706
AMORTIZED PRINCIPAL: 324,207 CAPITAL OUTLAY: 110,275
CMMSR APP DATE: 06/19/07 DATE CONTRACT SIGNED: 12/18/07 INT RATE: 0.03875 PPU: 15
CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 02/26/2008
******************************************************************************************
PROJECT NUMBER: 0004-014 PROJECT NAME: LITTLE BRITAIN ELEMENTARY SCHOOL
VOTER AUTHORIZATION DATE: 05/20/2009 BLD4
SA-139 HAS NOT BEEN RECEIVED FOR THIS PROJECT
******************************************************************************************
PROJECT NUMBER: 0004-015 PROJECT NAME: LITTLE BRITAIN ELEMENTARY SCHOOL
VOTER AUTHORIZATION DATE: 00/00/0000 BLD
SA-139 HAS NOT BEEN RECEIVED FOR THIS PROJECT
******************************************************************************************
PROJECT NUMBER: 0007-008 PROJECT NAME: SENIOR HIGH SCHOOL
VOTER AUTHORIZATION DATE: 06/03/2003 BLD3
JULY 2005 INTERIM YEARS JULY 2019
ASSUMED PAYMENTS: 2 2 2
DEBT SERVICE: 15,914 15,914 15,914
AMORTIZED PRINCIPAL: 179,733 CAPITAL OUTLAY: 0
CMMSR APP DATE: 04/07/04 DATE CONTRACT SIGNED: 05/11/04 INT RATE: 0.03875 PPU: 15
CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 07/29/2004
******************************************************************************************
PROJECT NUMBER: 0007-011 PROJECT NAME: SENIOR HIGH SCHOOL
VOTER AUTHORIZATION DATE: 11/13/2003 BLD3
JULY 2006 INTERIM YEARS JULY 2025
ASSUMED PAYMENTS: 2 2 2
DEBT SERVICE: 651,710 651,710 651,710
AMORTIZED PRINCIPAL: 9,011,605 CAPITAL OUTLAY: 0
CMMSR APP DATE: 05/25/05 DATE CONTRACT SIGNED: 06/06/06 INT RATE: 0.03875 PPU: 20
CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 08/03/2006
******************************************************************************************
PROJECT NUMBER: 0007-012 PROJECT NAME: SENIOR HIGH SCHOOL
VOTER AUTHORIZATION DATE: 04/19/2004 BLD3
JULY 2006 INTERIM YEARS JULY 2021
ASSUMED PAYMENTS: 1 2 1
DEBT SERVICE: 64,853 129,706 64,853
AMORTIZED PRINCIPAL: 1,452,476 CAPITAL OUTLAY: 0
CMMSR APP DATE: 09/19/05 DATE CONTRACT SIGNED: 11/10/05 INT RATE: 0.04000 PPU: 15
CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 03/28/2006
******************************************************************************************
PROJECT NUMBER: 0007-013 PROJECT NAME: SENIOR HIGH SCHOOL
VOTER AUTHORIZATION DATE: 05/17/2005 BLD3
JULY 2007 INTERIM YEARS JULY 2021
ASSUMED PAYMENTS: 2 2 2
DEBT SERVICE: 217,986 217,986 217,986
AMORTIZED PRINCIPAL: 2,441,049 CAPITAL OUTLAY: 0
CMMSR APP DATE: 04/20/06 DATE CONTRACT SIGNED: 06/29/06 INT RATE: 0.04000 PPU: 15
CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 08/03/2006
******************************************************************************************
PROJECT NUMBER: 0007-014 PROJECT NAME: SENIOR HIGH SCHOOL
VOTER AUTHORIZATION DATE: 05/17/2005 BLD3
JULY 2008 INTERIM YEARS JULY 2022
ASSUMED PAYMENTS: 2 2 2
DEBT SERVICE: 22,858 22,858 22,858
AMORTIZED PRINCIPAL: 258,169 CAPITAL OUTLAY: 248,446
CMMSR APP DATE: 02/07/07 DATE CONTRACT SIGNED: 04/26/07 INT RATE: 0.03875 PPU: 15
CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 07/12/2007
******************************************************************************************
PROJECT NUMBER: 0007-015 PROJECT NAME: SENIOR HIGH SCHOOL
VOTER AUTHORIZATION DATE: 05/16/2006 BLD4
JULY 2008 INTERIM YEARS JULY 2022
ASSUMED PAYMENTS: 2 2 2
DEBT SERVICE: 78,512 78,512 78,512
AMORTIZED PRINCIPAL: 886,736 CAPITAL OUTLAY: 251,984
CMMSR APP DATE: 06/19/07 DATE CONTRACT SIGNED: 09/12/07 INT RATE: 0.03875 PPU: 15
CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 02/26/2008
******************************************************************************************
PROJECT NUMBER: 0007-017 PROJECT NAME: SENIOR HIGH SCHOOL
VOTER AUTHORIZATION DATE: 05/20/2008 BLD4
SA-139 HAS NOT BEEN RECEIVED FOR THIS PROJECT
******************************************************************************************
PROJECT NUMBER: 0008-009 PROJECT NAME: ROUND HILL ELEM SCHOOL
VOTER AUTHORIZATION DATE: 04/19/2004 BLD3
JULY 2006 INTERIM YEARS JULY 2021
ASSUMED PAYMENTS: 1 2 1
DEBT SERVICE: 32,798 65,596 32,798
AMORTIZED PRINCIPAL: 734,548 CAPITAL OUTLAY: 0
CMMSR APP DATE: 09/19/05 DATE CONTRACT SIGNED: 11/10/05 INT RATE: 0.04000 PPU: 15
CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 03/28/2006
******************************************************************************************
PROJECT NUMBER: 0008-010 PROJECT NAME: ROUND HILL ELEM SCHOOL
VOTER AUTHORIZATION DATE: 05/17/2005 BLD3
JULY 2007 INTERIM YEARS JULY 2021
ASSUMED PAYMENTS: 2 2 2
DEBT SERVICE: 89,480 89,480 89,480
AMORTIZED PRINCIPAL: 1,002,017 CAPITAL OUTLAY: 0
CMMSR APP DATE: 04/20/06 DATE CONTRACT SIGNED: 06/29/06 INT RATE: 0.04000 PPU: 15
CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 08/03/2006
******************************************************************************************
PROJECT NUMBER: 0008-011 PROJECT NAME: ROUND HILL ELEM SCHOOL
VOTER AUTHORIZATION DATE: 05/17/2005 BLD3
SA-139 HAS NOT BEEN RECEIVED FOR THIS PROJECT
******************************************************************************************
PROJECT NUMBER: 0008-012 PROJECT NAME: ROUND HILL ELEM SCHOOL
VOTER AUTHORIZATION DATE: 05/16/2006 BLD4
JULY 2008 INTERIM YEARS JULY 2022
ASSUMED PAYMENTS: 2 2 2
DEBT SERVICE: 64,828 64,828 64,828
AMORTIZED PRINCIPAL: 732,182 CAPITAL OUTLAY: 161,401
CMMSR APP DATE: 06/19/07 DATE CONTRACT SIGNED: 07/31/07 INT RATE: 0.03875 PPU: 15
CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 02/26/2008
******************************************************************************************
PROJECT NUMBER: 0008-013 PROJECT NAME: ROUND HILL ELEM SCHOOL
VOTER AUTHORIZATION DATE: 05/20/2008 BLD4
SA-139 HAS NOT BEEN RECEIVED FOR THIS PROJECT
******************************************************************************************
PROJECT NUMBER: 0008-014 PROJECT NAME: ROUND HILL ELEM SCHOOL
VOTER AUTHORIZATION DATE: 05/17/2005 BLD3
JULY 2009 INTERIM YEARS JULY 2024
ASSUMED PAYMENTS: 1 2 1
DEBT SERVICE: 8,215 16,430 8,215
AMORTIZED PRINCIPAL: 190,476 CAPITAL OUTLAY: 0
CMMSR APP DATE: 09/29/08 DATE CONTRACT SIGNED: 04/27/09 INT RATE: 0.03500 PPU: 15
CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 08/21/2009
******************************************************************************************
PROJECT NUMBER: 0024-001 PROJECT NAME: XXXPROPOSED MIDDLE SCHOOL XXX
VOTER AUTHORIZATION DATE: 11/13/2003 BLD3
SA-139 HAS NOT BEEN RECEIVED FOR THIS PROJECT
******************************************************************************************
PROJECT NUMBER: 5013-008 PROJECT NAME: BUS GARAGE
VOTER AUTHORIZATION DATE: 04/19/2004 BLD3
JULY 2006 INTERIM YEARS JULY 2021
ASSUMED PAYMENTS: 1 2 1
DEBT SERVICE: 6,545 13,090 6,545
AMORTIZED PRINCIPAL: 146,582 CAPITAL OUTLAY: 0
CMMSR APP DATE: 09/19/05 DATE CONTRACT SIGNED: 11/10/05 INT RATE: 0.04000 PPU: 15
CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 03/28/2006
******************************************************************************************
PROJECT NUMBER: 5013-009 PROJECT NAME: BUS GARAGE
VOTER AUTHORIZATION DATE: 05/16/2006 BLD4
JULY 2008 INTERIM YEARS JULY 2022
ASSUMED PAYMENTS: 2 2 2
DEBT SERVICE: 4,156 4,156 4,156
AMORTIZED PRINCIPAL: 46,941 CAPITAL OUTLAY: 0
CMMSR APP DATE: 06/19/07 DATE CONTRACT SIGNED: 12/18/07 INT RATE: 0.03875 PPU: 15
CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 02/29/2008
******************************************************************************************
NYSED HOME PAGE | STATE AID HOME PAGE | DISTRICT HOME PAGE