PROSPECTIVE PROJECT AMORTIZATION                                           
                                                                   

STATE AID BUILDING - PROSPECTIVE PROJECT AMORTIZATION


DISTRICT: 580105 COPIAGUE DATE: 01/30/24


****************************************************************************************** PROJECT NUMBER: 0001-015 PROJECT NAME: DEAUVILLE GARDENS VOTER AUTHORIZATION DATE: 05/15/2001 BLD3 JULY 2003 INTERIM YEARS JULY 2018 ASSUMED PAYMENTS: 1 2 1 DEBT SERVICE: 398 796 398 AMORTIZED PRINCIPAL: 8,622 CAPITAL OUTLAY: 0 CMMSR APP DATE: 04/08/02 DATE CONTRACT SIGNED: 06/17/02 INT RATE: .045000 PPU: 15 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 02/09/2004 ****************************************************************************************** PROJECT NUMBER: 0001-016 PROJECT NAME: DEAUVILLE GARDENS VOTER AUTHORIZATION DATE: 10/29/2002 BLD3 JULY 2004 INTERIM YEARS JULY 2019 ASSUMED PAYMENTS: 1 2 1 DEBT SERVICE: 1,754 3,508 1,754 AMORTIZED PRINCIPAL: 39,629 CAPITAL OUTLAY: 0 CMMSR APP DATE: 06/05/03 DATE CONTRACT SIGNED: 10/20/03 INT RATE: .038750 PPU: 15 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 06/27/2005 ****************************************************************************************** PROJECT NUMBER: 0001-017 PROJECT NAME: DEAUVILLE GARDENS VOTER AUTHORIZATION DATE: 10/29/2002 BLD3 JULY 2004 INTERIM YEARS JULY 2019 ASSUMED PAYMENTS: 1 2 1 DEBT SERVICE: 0 0 0 AMORTIZED PRINCIPAL: 0 CAPITAL OUTLAY: 0 CMMSR APP DATE: 07/03/03 DATE CONTRACT SIGNED: 10/20/03 INT RATE: .038750 PPU: 15 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 06/27/2005 ****************************************************************************************** PROJECT NUMBER: 0001-018 PROJECT NAME: DEAUVILLE GARDENS VOTER AUTHORIZATION DATE: 10/29/2002 BLD3 JULY 2005 INTERIM YEARS JULY 2019 ASSUMED PAYMENTS: 2 2 2 DEBT SERVICE: 16,282 16,282 16,282 AMORTIZED PRINCIPAL: 183,905 CAPITAL OUTLAY: 0 CMMSR APP DATE: 03/29/04 DATE CONTRACT SIGNED: 04/27/04 INT RATE: .038750 PPU: 15 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 06/27/2005 ****************************************************************************************** PROJECT NUMBER: 0001-019 PROJECT NAME: DEAUVILLE GARDENS VOTER AUTHORIZATION DATE: 01/25/2007 BLD4 JULY 2008 INTERIM YEARS JULY 2023 ASSUMED PAYMENTS: 1 2 1 DEBT SERVICE: 67,071 134,142 67,071 AMORTIZED PRINCIPAL: 1,541,621 CAPITAL OUTLAY: 519,349 CMMSR APP DATE: 11/19/07 DATE CONTRACT SIGNED: 04/14/08 INT RATE: .036250 PPU: 15 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 05/21/2008 ****************************************************************************************** PROJECT NUMBER: 0001-020 PROJECT NAME: DEAUVILLE GARDENS ELEMENTARY VOTER AUTHORIZATION DATE: 11/23/2015 BLD4 ** CHAPTER 97 ** EARLY AID START APPROVAL DATE: 06/14/2019 JULY 2018 INTERIM YEARS JULY 2033 ASSUMED PAYMENTS: 1 2 1 DEBT SERVICE: 923,309 1,846,618 923,309 AMORTIZED PRINCIPAL: 23,828,480 CAPITAL OUTLAY: 0 CMMSR APP DATE: 01/07/17 DATE CONTRACT SIGNED: 04/27/17 INT RATE: .020000 PPU: 15 FINAL CSC RECEIVE DATE: 08/12/2019 FINAL FCR RECEIVE DATE: 10/04/2019 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 10/11/2017 ****************************************************************************************** PROJECT NUMBER: 0001-021 PROJECT NAME: DEAUVILLE GARDENS ELEMENTARY VOTER AUTHORIZATION DATE: 05/18/2021 BLD4 ** CHAPTER 97 ** COMMISSIONER APP DATE: 08/18/2021 DATE CONTRACT SIGNED: 01/20/22 SA-139 RECEIVE DATE: 03/10/2022 FINAL CSC RECEIVE DATE: 00/00/0000 FINAL FCR RECEIVE DATE: 00/00/0000 This is a Chapter 97 project. Chapter 97 projects are those with a Commissioner's Approval Date (CAD) on or after 7/1/11. They are subject to aid start rules included in Chapter 97 of the laws of 2011. Chapter 97 projects will not generate Building Aid or display data on this report until the SA-139, FINAL Certificate of Substantial Completion (CSC) and Final Cost Report all have been received and processed by SED. NOTE: Even if all three documents are received and on file, aid start for Chapter 97 projects may still be deferred if the SA-139 was not received in time to be included in the data file frozen in November of the school year prior to the aid year in which Building Aid could otherwise first start. ****************************************************************************************** PROJECT NUMBER: 0001-022 PROJECT NAME: DEAUVILLE GARDENS ELEMENTARY VOTER AUTHORIZATION DATE: 05/18/2021 BLD4 ** CHAPTER 97 ** COMMISSIONER APP DATE: 06/28/2023 DATE CONTRACT SIGNED: 00/00/00 SA-139 RECEIVE DATE: 00/00/0000 FINAL CSC RECEIVE DATE: 00/00/0000 FINAL FCR RECEIVE DATE: 00/00/0000 This is a Chapter 97 project. Chapter 97 projects are those with a Commissioner's Approval Date (CAD) on or after 7/1/11. They are subject to aid start rules included in Chapter 97 of the laws of 2011. Chapter 97 projects will not generate Building Aid or display data on this report until the SA-139, FINAL Certificate of Substantial Completion (CSC) and Final Cost Report all have been received and processed by SED. NOTE: Even if all three documents are received and on file, aid start for Chapter 97 projects may still be deferred if the SA-139 was not received in time to be included in the data file frozen in November of the school year prior to the aid year in which Building Aid could otherwise first start. ****************************************************************************************** PROJECT NUMBER: 0002-011 PROJECT NAME: GREAT NECK RD ELEMENTARY SCHOOL VOTER AUTHORIZATION DATE: 05/15/2001 BLD3 JULY 2003 INTERIM YEARS JULY 2018 ASSUMED PAYMENTS: 1 2 1 DEBT SERVICE: 1,129 2,258 1,129 AMORTIZED PRINCIPAL: 24,447 CAPITAL OUTLAY: 0 CMMSR APP DATE: 04/08/02 DATE CONTRACT SIGNED: 06/17/02 INT RATE: .045000 PPU: 15 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 02/09/2004 ****************************************************************************************** PROJECT NUMBER: 0002-012 PROJECT NAME: GREAT NECK RD ELEMENTARY SCHOOL VOTER AUTHORIZATION DATE: 10/29/2002 BLD3 JULY 2004 INTERIM YEARS JULY 2019 ASSUMED PAYMENTS: 1 2 1 DEBT SERVICE: 0 0 0 AMORTIZED PRINCIPAL: 0 CAPITAL OUTLAY: 0 CMMSR APP DATE: 06/05/03 DATE CONTRACT SIGNED: 10/20/03 INT RATE: .038750 PPU: 15 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 06/27/2005 ****************************************************************************************** PROJECT NUMBER: 0002-013 PROJECT NAME: GREAT NECK RD ELEMENTARY SCHOOL VOTER AUTHORIZATION DATE: 10/29/2002 BLD3 JULY 2004 INTERIM YEARS JULY 2019 ASSUMED PAYMENTS: 1 2 1 DEBT SERVICE: 0 0 0 AMORTIZED PRINCIPAL: 0 CAPITAL OUTLAY: 0 CMMSR APP DATE: 07/03/03 DATE CONTRACT SIGNED: 04/27/04 INT RATE: .038750 PPU: 15 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 06/27/2005 ****************************************************************************************** PROJECT NUMBER: 0002-014 PROJECT NAME: GREAT NECK RD ELEMENTARY SCHOOL VOTER AUTHORIZATION DATE: 10/29/2002 BLD3 JULY 2005 INTERIM YEARS JULY 2019 ASSUMED PAYMENTS: 2 2 2 DEBT SERVICE: 151,134 151,134 151,134 AMORTIZED PRINCIPAL: 1,707,064 CAPITAL OUTLAY: 0 CMMSR APP DATE: 03/29/04 DATE CONTRACT SIGNED: 04/27/04 INT RATE: .038750 PPU: 15 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 06/27/2005 ****************************************************************************************** PROJECT NUMBER: 0002-016 PROJECT NAME: GREAT NECK RD ELEMENTARY SCHOOL VOTER AUTHORIZATION DATE: 01/25/2007 BLD4 JULY 2008 INTERIM YEARS JULY 2022 ASSUMED PAYMENTS: 2 2 2 DEBT SERVICE: 81,174 81,174 81,174 AMORTIZED PRINCIPAL: 916,872 CAPITAL OUTLAY: 267,463 CMMSR APP DATE: 02/13/07 DATE CONTRACT SIGNED: 04/10/07 INT RATE: .038750 PPU: 15 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 10/12/2007 ****************************************************************************************** PROJECT NUMBER: 0002-017 PROJECT NAME: GREAT NECK RD ELEMENTARY SCHOOL VOTER AUTHORIZATION DATE: 01/25/2007 BLD4 JULY 2009 INTERIM YEARS JULY 2024 ASSUMED PAYMENTS: 1 2 1 DEBT SERVICE: 8,546 17,092 8,546 AMORTIZED PRINCIPAL: 196,424 CAPITAL OUTLAY: 54,793 CMMSR APP DATE: 11/19/07 DATE CONTRACT SIGNED: 06/16/09 INT RATE: .036250 PPU: 15 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 05/13/2010 ****************************************************************************************** PROJECT NUMBER: 0002-018 PROJECT NAME: GREAT NECK RD ELEMENTARY SCHOOL VOTER AUTHORIZATION DATE: 01/25/2007 BLD4 JULY 2011 INTERIM YEARS JULY 2025 ASSUMED PAYMENTS: 2 2 2 DEBT SERVICE: 57,364 57,364 57,364 AMORTIZED PRINCIPAL: 688,814 CAPITAL OUTLAY: 136,663 CMMSR APP DATE: 05/26/10 DATE CONTRACT SIGNED: 08/09/10 INT RATE: .030000 PPU: 15 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 10/19/2010 ****************************************************************************************** PROJECT NUMBER: 0002-019 PROJECT NAME: GREAT NECK RD. ELEMENTARY VOTER AUTHORIZATION DATE: 11/23/2015 BLD4 ** CHAPTER 97 ** EARLY AID START APPROVAL DATE: 06/14/2019 JULY 2018 INTERIM YEARS JULY 2033 ASSUMED PAYMENTS: 1 2 1 DEBT SERVICE: 67,008 134,016 67,008 AMORTIZED PRINCIPAL: 1,729,327 CAPITAL OUTLAY: 0 CMMSR APP DATE: 01/07/17 DATE CONTRACT SIGNED: 06/01/17 INT RATE: .020000 PPU: 15 FINAL CSC RECEIVE DATE: 08/12/2019 FINAL FCR RECEIVE DATE: 10/04/2019 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 10/11/2017 ****************************************************************************************** PROJECT NUMBER: 0002-020 PROJECT NAME: GREAT NECK RD. ELEMENTARY VOTER AUTHORIZATION DATE: 05/18/2021 BLD4 ** CHAPTER 97 ** COMMISSIONER APP DATE: 06/28/2023 DATE CONTRACT SIGNED: 00/00/00 SA-139 RECEIVE DATE: 00/00/0000 FINAL CSC RECEIVE DATE: 00/00/0000 FINAL FCR RECEIVE DATE: 00/00/0000 This is a Chapter 97 project. Chapter 97 projects are those with a Commissioner's Approval Date (CAD) on or after 7/1/11. They are subject to aid start rules included in Chapter 97 of the laws of 2011. Chapter 97 projects will not generate Building Aid or display data on this report until the SA-139, FINAL Certificate of Substantial Completion (CSC) and Final Cost Report all have been received and processed by SED. NOTE: Even if all three documents are received and on file, aid start for Chapter 97 projects may still be deferred if the SA-139 was not received in time to be included in the data file frozen in November of the school year prior to the aid year in which Building Aid could otherwise first start. ****************************************************************************************** PROJECT NUMBER: 0002-021 PROJECT NAME: GREAT NECK RD. ELEMENTARY VOTER AUTHORIZATION DATE: 05/17/2022 BLD4 ** CHAPTER 97 ** COMMISSIONER APP DATE: 11/29/2022 DATE CONTRACT SIGNED: 00/00/00 SA-139 RECEIVE DATE: 00/00/0000 FINAL CSC RECEIVE DATE: 00/00/0000 FINAL FCR RECEIVE DATE: 00/00/0000 This is a Chapter 97 project. Chapter 97 projects are those with a Commissioner's Approval Date (CAD) on or after 7/1/11. They are subject to aid start rules included in Chapter 97 of the laws of 2011. Chapter 97 projects will not generate Building Aid or display data on this report until the SA-139, FINAL Certificate of Substantial Completion (CSC) and Final Cost Report all have been received and processed by SED. NOTE: Even if all three documents are received and on file, aid start for Chapter 97 projects may still be deferred if the SA-139 was not received in time to be included in the data file frozen in November of the school year prior to the aid year in which Building Aid could otherwise first start. ****************************************************************************************** PROJECT NUMBER: 0004-014 PROJECT NAME: COPIAGUE JR HIGH VOTER AUTHORIZATION DATE: 05/15/2001 BLD3 JULY 2003 INTERIM YEARS JULY 2018 ASSUMED PAYMENTS: 1 2 1 DEBT SERVICE: 0 0 0 AMORTIZED PRINCIPAL: 0 CAPITAL OUTLAY: 0 CMMSR APP DATE: 04/08/02 DATE CONTRACT SIGNED: 06/17/02 INT RATE: .045000 PPU: 15 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 02/09/2004 ****************************************************************************************** PROJECT NUMBER: 0004-015 PROJECT NAME: COPIAGUE JR HIGH VOTER AUTHORIZATION DATE: 10/29/2002 BLD3 JULY 2004 INTERIM YEARS JULY 2019 ASSUMED PAYMENTS: 1 2 1 DEBT SERVICE: 10,171 20,342 10,171 AMORTIZED PRINCIPAL: 229,768 CAPITAL OUTLAY: 0 CMMSR APP DATE: 06/05/03 DATE CONTRACT SIGNED: 10/20/03 INT RATE: .038750 PPU: 15 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 06/27/2005 ****************************************************************************************** PROJECT NUMBER: 0004-016 PROJECT NAME: COPIAGUE JR HIGH VOTER AUTHORIZATION DATE: 10/29/2002 BLD3 JULY 2004 INTERIM YEARS JULY 2019 ASSUMED PAYMENTS: 1 2 1 DEBT SERVICE: 0 0 0 AMORTIZED PRINCIPAL: 0 CAPITAL OUTLAY: 0 CMMSR APP DATE: 07/03/03 DATE CONTRACT SIGNED: 04/27/04 INT RATE: .038750 PPU: 15 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 06/27/2005 ****************************************************************************************** PROJECT NUMBER: 0004-017 PROJECT NAME: COPIAGUE JR HIGH VOTER AUTHORIZATION DATE: 10/29/2002 BLD3 JULY 2005 INTERIM YEARS JULY 2019 ASSUMED PAYMENTS: 2 2 2 DEBT SERVICE: 81,332 81,332 81,332 AMORTIZED PRINCIPAL: 918,651 CAPITAL OUTLAY: 0 CMMSR APP DATE: 03/29/04 DATE CONTRACT SIGNED: 04/27/04 INT RATE: .038750 PPU: 15 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 06/27/2005 ****************************************************************************************** PROJECT NUMBER: 0004-018 PROJECT NAME: COPIAGUE JR HIGH VOTER AUTHORIZATION DATE: 01/25/2007 BLD4 JULY 2008 INTERIM YEARS JULY 2023 ASSUMED PAYMENTS: 1 2 1 DEBT SERVICE: 98,835 197,670 98,835 AMORTIZED PRINCIPAL: 2,271,704 CAPITAL OUTLAY: 1,152,552 CMMSR APP DATE: 11/19/07 DATE CONTRACT SIGNED: 04/07/08 INT RATE: .036250 PPU: 15 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 08/25/2008 ****************************************************************************************** PROJECT NUMBER: 0004-019 PROJECT NAME: COPIAGUE JR HIGH VOTER AUTHORIZATION DATE: 01/25/2007 BLD4 ** CHAPTER 97 ** COMMISSIONER APP DATE: 07/13/2011 DATE CONTRACT SIGNED: 00/00/00 SA-139 RECEIVE DATE: 00/00/0000 FINAL CSC RECEIVE DATE: 00/00/0000 FINAL FCR RECEIVE DATE: 00/00/0000 This is a Chapter 97 project. Chapter 97 projects are those with a Commissioner's Approval Date (CAD) on or after 7/1/11. They are subject to aid start rules included in Chapter 97 of the laws of 2011. Chapter 97 projects will not generate Building Aid or display data on this report until the SA-139, FINAL Certificate of Substantial Completion (CSC) and Final Cost Report all have been received and processed by SED. NOTE: Even if all three documents are received and on file, aid start for Chapter 97 projects may still be deferred if the SA-139 was not received in time to be included in the data file frozen in November of the school year prior to the aid year in which Building Aid could otherwise first start. ****************************************************************************************** PROJECT NUMBER: 0004-022 PROJECT NAME: COPIAGUE MIDDLE SCHOOL VOTER AUTHORIZATION DATE: 11/23/2015 BLD4 ** CHAPTER 97 ** EARLY AID START APPROVAL DATE: 06/14/2019 JULY 2018 INTERIM YEARS JULY 2033 ASSUMED PAYMENTS: 1 2 1 DEBT SERVICE: 146,150 292,300 146,150 AMORTIZED PRINCIPAL: 3,771,788 CAPITAL OUTLAY: 0 CMMSR APP DATE: 01/07/17 DATE CONTRACT SIGNED: 04/27/17 INT RATE: .020000 PPU: 15 FINAL CSC RECEIVE DATE: 08/12/2019 FINAL FCR RECEIVE DATE: 12/30/2019 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 10/11/2017 ****************************************************************************************** PROJECT NUMBER: 0004-024 PROJECT NAME: COPIAGUE MIDDLE SCHOOL VOTER AUTHORIZATION DATE: 11/23/2015 BLD4 ** CHAPTER 97 ** EARLY AID START APPROVAL DATE: 06/14/2019 JULY 2018 INTERIM YEARS JULY 2033 ASSUMED PAYMENTS: 1 2 1 DEBT SERVICE: 60,901 121,802 60,901 AMORTIZED PRINCIPAL: 1,571,708 CAPITAL OUTLAY: 0 CMMSR APP DATE: 12/27/16 DATE CONTRACT SIGNED: 03/27/17 INT RATE: .020000 PPU: 15 FINAL CSC RECEIVE DATE: 08/12/2019 FINAL FCR RECEIVE DATE: 12/30/2019 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 10/11/2017 ****************************************************************************************** PROJECT NUMBER: 0004-025 PROJECT NAME: COPIAGUE MIDDLE SCHOOL VOTER AUTHORIZATION DATE: 06/09/2020 BLD4 ** CHAPTER 97 ** JULY 2022 INTERIM YEARS JULY 2036 ASSUMED PAYMENTS: 2 2 2 DEBT SERVICE: 41,248 41,248 41,248 AMORTIZED PRINCIPAL: 552,199 CAPITAL OUTLAY: 544,008 CMMSR APP DATE: 10/01/20 DATE CONTRACT SIGNED: 07/20/21 INT RATE: .015000 PPU: 15 FINAL CSC RECEIVE DATE: 06/16/2022 FINAL FCR RECEIVE DATE: 11/11/2022 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 11/11/2022 ****************************************************************************************** PROJECT NUMBER: 0004-027 PROJECT NAME: COPIAGUE MIDDLE SCHOOL VOTER AUTHORIZATION DATE: 05/18/2021 BLD4 ** CHAPTER 97 ** COMMISSIONER APP DATE: 06/28/2023 DATE CONTRACT SIGNED: 00/00/00 SA-139 RECEIVE DATE: 00/00/0000 FINAL CSC RECEIVE DATE: 00/00/0000 FINAL FCR RECEIVE DATE: 00/00/0000 This is a Chapter 97 project. Chapter 97 projects are those with a Commissioner's Approval Date (CAD) on or after 7/1/11. They are subject to aid start rules included in Chapter 97 of the laws of 2011. Chapter 97 projects will not generate Building Aid or display data on this report until the SA-139, FINAL Certificate of Substantial Completion (CSC) and Final Cost Report all have been received and processed by SED. NOTE: Even if all three documents are received and on file, aid start for Chapter 97 projects may still be deferred if the SA-139 was not received in time to be included in the data file frozen in November of the school year prior to the aid year in which Building Aid could otherwise first start. ****************************************************************************************** PROJECT NUMBER: 0004-029 PROJECT NAME: COPIAGUE MIDDLE SCHOOL VOTER AUTHORIZATION DATE: 05/17/2022 BLD4 ** CHAPTER 97 ** COMMISSIONER APP DATE: 11/29/2022 DATE CONTRACT SIGNED: 00/00/00 SA-139 RECEIVE DATE: 00/00/0000 FINAL CSC RECEIVE DATE: 00/00/0000 FINAL FCR RECEIVE DATE: 00/00/0000 This is a Chapter 97 project. Chapter 97 projects are those with a Commissioner's Approval Date (CAD) on or after 7/1/11. They are subject to aid start rules included in Chapter 97 of the laws of 2011. Chapter 97 projects will not generate Building Aid or display data on this report until the SA-139, FINAL Certificate of Substantial Completion (CSC) and Final Cost Report all have been received and processed by SED. NOTE: Even if all three documents are received and on file, aid start for Chapter 97 projects may still be deferred if the SA-139 was not received in time to be included in the data file frozen in November of the school year prior to the aid year in which Building Aid could otherwise first start. ****************************************************************************************** PROJECT NUMBER: 0005-016 PROJECT NAME: SUSAN E WILEY ELEMENTARY VOTER AUTHORIZATION DATE: 05/15/2001 BLD3 JULY 2003 INTERIM YEARS JULY 2018 ASSUMED PAYMENTS: 1 2 1 DEBT SERVICE: 357 714 357 AMORTIZED PRINCIPAL: 7,721 CAPITAL OUTLAY: 0 CMMSR APP DATE: 04/08/02 DATE CONTRACT SIGNED: 06/17/02 INT RATE: .045000 PPU: 15 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 02/09/2004 ****************************************************************************************** PROJECT NUMBER: 0005-017 PROJECT NAME: SUSAN E WILEY ELEMENTARY VOTER AUTHORIZATION DATE: 10/29/2002 BLD3 JULY 2004 INTERIM YEARS JULY 2019 ASSUMED PAYMENTS: 1 2 1 DEBT SERVICE: 2,336 4,672 2,336 AMORTIZED PRINCIPAL: 52,761 CAPITAL OUTLAY: 0 CMMSR APP DATE: 06/05/03 DATE CONTRACT SIGNED: 10/20/03 INT RATE: .038750 PPU: 15 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 06/27/2005 ****************************************************************************************** PROJECT NUMBER: 0005-018 PROJECT NAME: SUSAN E WILEY ELEMENTARY VOTER AUTHORIZATION DATE: 10/29/2002 BLD3 JULY 2004 INTERIM YEARS JULY 2019 ASSUMED PAYMENTS: 1 2 1 DEBT SERVICE: 2,714 5,428 2,714 AMORTIZED PRINCIPAL: 61,320 CAPITAL OUTLAY: 0 CMMSR APP DATE: 07/03/03 DATE CONTRACT SIGNED: 10/20/03 INT RATE: .038750 PPU: 15 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 02/17/2004 ****************************************************************************************** PROJECT NUMBER: 0005-019 PROJECT NAME: SUSAN E WILEY ELEMENTARY VOTER AUTHORIZATION DATE: 01/25/2007 BLD4 JULY 2008 INTERIM YEARS JULY 2023 ASSUMED PAYMENTS: 1 2 1 DEBT SERVICE: 79,825 159,650 79,825 AMORTIZED PRINCIPAL: 1,834,760 CAPITAL OUTLAY: 484,375 CMMSR APP DATE: 11/19/07 DATE CONTRACT SIGNED: 03/17/08 INT RATE: .036250 PPU: 15 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 04/04/2008 ****************************************************************************************** PROJECT NUMBER: 0005-020 PROJECT NAME: SUSAN E WILEY ELEMENTARY VOTER AUTHORIZATION DATE: 01/25/2010 BLD4 JULY 2011 INTERIM YEARS JULY 2025 ASSUMED PAYMENTS: 2 2 2 DEBT SERVICE: 11,298 11,298 11,298 AMORTIZED PRINCIPAL: 135,664 CAPITAL OUTLAY: 0 CMMSR APP DATE: 05/26/10 DATE CONTRACT SIGNED: 08/11/10 INT RATE: .030000 PPU: 15 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 10/19/2010 ****************************************************************************************** PROJECT NUMBER: 0005-021 PROJECT NAME: SUSAN E. WILEY ELEMENTARY VOTER AUTHORIZATION DATE: 11/23/2015 BLD4 ** CHAPTER 97 ** EARLY AID START APPROVAL DATE: 06/14/2019 JULY 2018 INTERIM YEARS JULY 2033 ASSUMED PAYMENTS: 1 2 1 DEBT SERVICE: 98,311 196,622 98,311 AMORTIZED PRINCIPAL: 2,537,190 CAPITAL OUTLAY: 0 CMMSR APP DATE: 01/07/17 DATE CONTRACT SIGNED: 04/27/17 INT RATE: .020000 PPU: 15 FINAL CSC RECEIVE DATE: 08/12/2019 FINAL FCR RECEIVE DATE: 10/04/2019 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 10/11/2017 ****************************************************************************************** PROJECT NUMBER: 0005-023 PROJECT NAME: SUSAN E. WILEY ELEMENTARY VOTER AUTHORIZATION DATE: 05/18/2021 BLD4 ** CHAPTER 97 ** COMMISSIONER APP DATE: 08/18/2021 DATE CONTRACT SIGNED: 01/20/22 SA-139 RECEIVE DATE: 03/10/2022 FINAL CSC RECEIVE DATE: 00/00/0000 FINAL FCR RECEIVE DATE: 00/00/0000 This is a Chapter 97 project. Chapter 97 projects are those with a Commissioner's Approval Date (CAD) on or after 7/1/11. They are subject to aid start rules included in Chapter 97 of the laws of 2011. Chapter 97 projects will not generate Building Aid or display data on this report until the SA-139, FINAL Certificate of Substantial Completion (CSC) and Final Cost Report all have been received and processed by SED. NOTE: Even if all three documents are received and on file, aid start for Chapter 97 projects may still be deferred if the SA-139 was not received in time to be included in the data file frozen in November of the school year prior to the aid year in which Building Aid could otherwise first start. ****************************************************************************************** PROJECT NUMBER: 0005-024 PROJECT NAME: SUSAN E. WILEY ELEMENTARY VOTER AUTHORIZATION DATE: 05/18/2021 BLD4 ** CHAPTER 97 ** COMMISSIONER APP DATE: 06/28/2023 DATE CONTRACT SIGNED: 00/00/00 SA-139 RECEIVE DATE: 00/00/0000 FINAL CSC RECEIVE DATE: 00/00/0000 FINAL FCR RECEIVE DATE: 00/00/0000 This is a Chapter 97 project. Chapter 97 projects are those with a Commissioner's Approval Date (CAD) on or after 7/1/11. They are subject to aid start rules included in Chapter 97 of the laws of 2011. Chapter 97 projects will not generate Building Aid or display data on this report until the SA-139, FINAL Certificate of Substantial Completion (CSC) and Final Cost Report all have been received and processed by SED. NOTE: Even if all three documents are received and on file, aid start for Chapter 97 projects may still be deferred if the SA-139 was not received in time to be included in the data file frozen in November of the school year prior to the aid year in which Building Aid could otherwise first start. ****************************************************************************************** PROJECT NUMBER: 0005-026 PROJECT NAME: SUSAN E. WILEY ELEMENTARY VOTER AUTHORIZATION DATE: 05/17/2022 BLD4 ** CHAPTER 97 ** COMMISSIONER APP DATE: 10/26/2023 DATE CONTRACT SIGNED: 00/00/00 SA-139 RECEIVE DATE: 00/00/0000 FINAL CSC RECEIVE DATE: 00/00/0000 FINAL FCR RECEIVE DATE: 00/00/0000 This is a Chapter 97 project. Chapter 97 projects are those with a Commissioner's Approval Date (CAD) on or after 7/1/11. They are subject to aid start rules included in Chapter 97 of the laws of 2011. Chapter 97 projects will not generate Building Aid or display data on this report until the SA-139, FINAL Certificate of Substantial Completion (CSC) and Final Cost Report all have been received and processed by SED. NOTE: Even if all three documents are received and on file, aid start for Chapter 97 projects may still be deferred if the SA-139 was not received in time to be included in the data file frozen in November of the school year prior to the aid year in which Building Aid could otherwise first start. ****************************************************************************************** PROJECT NUMBER: 0006-012 PROJECT NAME: SENIOR HIGH SCHOOL VOTER AUTHORIZATION DATE: 05/15/2001 BLD3 JULY 2003 INTERIM YEARS JULY 2018 ASSUMED PAYMENTS: 1 2 1 DEBT SERVICE: 0 0 0 AMORTIZED PRINCIPAL: 0 CAPITAL OUTLAY: 0 CMMSR APP DATE: 04/08/02 DATE CONTRACT SIGNED: 11/06/02 INT RATE: .045000 PPU: 15 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 01/30/2004 ****************************************************************************************** PROJECT NUMBER: 0006-013 PROJECT NAME: SENIOR HIGH SCHOOL VOTER AUTHORIZATION DATE: 10/29/2002 BLD3 JULY 2004 INTERIM YEARS JULY 2019 ASSUMED PAYMENTS: 1 2 1 DEBT SERVICE: 4,068 8,136 4,068 AMORTIZED PRINCIPAL: 91,902 CAPITAL OUTLAY: 0 CMMSR APP DATE: 06/05/03 DATE CONTRACT SIGNED: 10/20/03 INT RATE: .038750 PPU: 15 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 06/27/2005 ****************************************************************************************** PROJECT NUMBER: 0006-014 PROJECT NAME: SENIOR HIGH SCHOOL VOTER AUTHORIZATION DATE: 10/29/2002 BLD3 JULY 2005 INTERIM YEARS JULY 2019 ASSUMED PAYMENTS: 2 2 2 DEBT SERVICE: 0 0 0 AMORTIZED PRINCIPAL: 0 CAPITAL OUTLAY: 0 CMMSR APP DATE: 07/03/03 DATE CONTRACT SIGNED: 04/27/04 INT RATE: .038750 PPU: 15 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 07/05/2005 ****************************************************************************************** PROJECT NUMBER: 0006-015 PROJECT NAME: SENIOR HIGH SCHOOL VOTER AUTHORIZATION DATE: 10/29/2002 BLD3 JULY 2005 INTERIM YEARS JULY 2019 ASSUMED PAYMENTS: 2 2 2 DEBT SERVICE: 464,330 464,330 464,330 AMORTIZED PRINCIPAL: 5,244,633 CAPITAL OUTLAY: 0 CMMSR APP DATE: 03/29/04 DATE CONTRACT SIGNED: 04/27/04 INT RATE: .038750 PPU: 15 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 06/27/2005 ****************************************************************************************** PROJECT NUMBER: 0006-018 PROJECT NAME: SENIOR HIGH SCHOOL VOTER AUTHORIZATION DATE: 01/25/2007 BLD4 JULY 2008 INTERIM YEARS JULY 2022 ASSUMED PAYMENTS: 2 2 2 DEBT SERVICE: 324,328 324,328 324,328 AMORTIZED PRINCIPAL: 3,663,306 CAPITAL OUTLAY: 1,035,359 CMMSR APP DATE: 02/13/07 DATE CONTRACT SIGNED: 04/10/07 INT RATE: .038750 PPU: 15 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 10/12/2007 ****************************************************************************************** PROJECT NUMBER: 0006-020 PROJECT NAME: SENIOR HIGH SCHOOL VOTER AUTHORIZATION DATE: 01/25/2007 BLD4 COMMISSIONER APP DATE: 09/11/2008 SA-139 HAS NOT BEEN RECEIVED FOR THIS PROJECT ****************************************************************************************** PROJECT NUMBER: 0006-022 PROJECT NAME: SENIOR HIGH SCHOOL VOTER AUTHORIZATION DATE: 01/25/2010 BLD4 JULY 2011 INTERIM YEARS JULY 2025 ASSUMED PAYMENTS: 2 2 2 DEBT SERVICE: 17,958 17,958 17,958 AMORTIZED PRINCIPAL: 215,632 CAPITAL OUTLAY: 0 CMMSR APP DATE: 05/26/10 DATE CONTRACT SIGNED: 09/19/10 INT RATE: .030000 PPU: 15 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 10/19/2010 ****************************************************************************************** PROJECT NUMBER: 0006-023 PROJECT NAME: WALTER G. O'CONNELL HIGH SCHOOL VOTER AUTHORIZATION DATE: 11/23/2015 BLD4 ** CHAPTER 97 ** EARLY AID START APPROVAL DATE: 06/14/2019 JULY 2018 INTERIM YEARS JULY 2033 ASSUMED PAYMENTS: 1 2 1 DEBT SERVICE: 291,835 583,670 291,835 AMORTIZED PRINCIPAL: 7,531,603 CAPITAL OUTLAY: 0 CMMSR APP DATE: 01/07/17 DATE CONTRACT SIGNED: 04/27/17 INT RATE: .020000 PPU: 15 FINAL CSC RECEIVE DATE: 08/12/2019 FINAL FCR RECEIVE DATE: 12/30/2019 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 10/11/2017 ****************************************************************************************** PROJECT NUMBER: 0006-027 PROJECT NAME: WALTER G. O'CONNELL HIGH SCHOOL VOTER AUTHORIZATION DATE: 11/23/2015 BLD4 ** CHAPTER 97 ** EARLY AID START APPROVAL DATE: 06/14/2019 JULY 2018 INTERIM YEARS JULY 2033 ASSUMED PAYMENTS: 1 2 1 DEBT SERVICE: 52,277 104,554 52,277 AMORTIZED PRINCIPAL: 1,349,142 CAPITAL OUTLAY: 0 CMMSR APP DATE: 12/27/16 DATE CONTRACT SIGNED: 03/27/17 INT RATE: .020000 PPU: 15 FINAL CSC RECEIVE DATE: 08/12/2019 FINAL FCR RECEIVE DATE: 12/30/2019 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 10/11/2017 ****************************************************************************************** PROJECT NUMBER: 0006-029 PROJECT NAME: WALTER G. O'CONNELL HIGH SCHOOL VOTER AUTHORIZATION DATE: 05/18/2021 BLD4 ** CHAPTER 97 ** COMMISSIONER APP DATE: 06/28/2023 DATE CONTRACT SIGNED: 00/00/00 SA-139 RECEIVE DATE: 00/00/0000 FINAL CSC RECEIVE DATE: 00/00/0000 FINAL FCR RECEIVE DATE: 00/00/0000 This is a Chapter 97 project. Chapter 97 projects are those with a Commissioner's Approval Date (CAD) on or after 7/1/11. They are subject to aid start rules included in Chapter 97 of the laws of 2011. Chapter 97 projects will not generate Building Aid or display data on this report until the SA-139, FINAL Certificate of Substantial Completion (CSC) and Final Cost Report all have been received and processed by SED. NOTE: Even if all three documents are received and on file, aid start for Chapter 97 projects may still be deferred if the SA-139 was not received in time to be included in the data file frozen in November of the school year prior to the aid year in which Building Aid could otherwise first start. ****************************************************************************************** PROJECT NUMBER: 0006-030 PROJECT NAME: WALTER G. O'CONNELL HIGH SCHOOL VOTER AUTHORIZATION DATE: 05/18/2021 BLD4 ** CHAPTER 97 ** COMMISSIONER APP DATE: 02/18/2022 DATE CONTRACT SIGNED: 00/00/00 SA-139 RECEIVE DATE: 00/00/0000 FINAL CSC RECEIVE DATE: 05/19/2023 FINAL FCR RECEIVE DATE: 00/00/0000 This is a Chapter 97 project. Chapter 97 projects are those with a Commissioner's Approval Date (CAD) on or after 7/1/11. They are subject to aid start rules included in Chapter 97 of the laws of 2011. Chapter 97 projects will not generate Building Aid or display data on this report until the SA-139, FINAL Certificate of Substantial Completion (CSC) and Final Cost Report all have been received and processed by SED. NOTE: Even if all three documents are received and on file, aid start for Chapter 97 projects may still be deferred if the SA-139 was not received in time to be included in the data file frozen in November of the school year prior to the aid year in which Building Aid could otherwise first start. ****************************************************************************************** PROJECT NUMBER: 0006-034 PROJECT NAME: WALTER G. O'CONNELL HIGH SCHOOL VOTER AUTHORIZATION DATE: 05/17/2022 BLD4 ** CHAPTER 97 ** COMMISSIONER APP DATE: 11/29/2022 DATE CONTRACT SIGNED: 00/00/00 SA-139 RECEIVE DATE: 00/00/0000 FINAL CSC RECEIVE DATE: 00/00/0000 FINAL FCR RECEIVE DATE: 00/00/0000 This is a Chapter 97 project. Chapter 97 projects are those with a Commissioner's Approval Date (CAD) on or after 7/1/11. They are subject to aid start rules included in Chapter 97 of the laws of 2011. Chapter 97 projects will not generate Building Aid or display data on this report until the SA-139, FINAL Certificate of Substantial Completion (CSC) and Final Cost Report all have been received and processed by SED. NOTE: Even if all three documents are received and on file, aid start for Chapter 97 projects may still be deferred if the SA-139 was not received in time to be included in the data file frozen in November of the school year prior to the aid year in which Building Aid could otherwise first start. ****************************************************************************************** PROJECT NUMBER: 0006-035 PROJECT NAME: WALTER G. O'CONNELL HIGH SCHOOL VOTER AUTHORIZATION DATE: 05/17/2022 BLD4 ** CHAPTER 97 ** COMMISSIONER APP DATE: 11/28/2022 DATE CONTRACT SIGNED: 00/00/00 SA-139 RECEIVE DATE: 00/00/0000 FINAL CSC RECEIVE DATE: 00/00/0000 FINAL FCR RECEIVE DATE: 00/00/0000 This is a Chapter 97 project. Chapter 97 projects are those with a Commissioner's Approval Date (CAD) on or after 7/1/11. They are subject to aid start rules included in Chapter 97 of the laws of 2011. Chapter 97 projects will not generate Building Aid or display data on this report until the SA-139, FINAL Certificate of Substantial Completion (CSC) and Final Cost Report all have been received and processed by SED. NOTE: Even if all three documents are received and on file, aid start for Chapter 97 projects may still be deferred if the SA-139 was not received in time to be included in the data file frozen in November of the school year prior to the aid year in which Building Aid could otherwise first start. ****************************************************************************************** PROJECT NUMBER: 2003-001 PROJECT NAME: DISTRICT GARAGE VOTER AUTHORIZATION DATE: 10/29/2002 BLD3 JULY 2005 INTERIM YEARS JULY 2024 ASSUMED PAYMENTS: 2 2 2 DEBT SERVICE: 0 0 0 AMORTIZED PRINCIPAL: 0 CAPITAL OUTLAY: 0 CMMSR APP DATE: 03/29/04 DATE CONTRACT SIGNED: 07/12/04 INT RATE: .038750 PPU: 20 CONTRACT DATE NOTIFICATION TO SED (SA-139 RECEIVE DATE): 06/27/2005 ******************************************************************************************

NYSED HOME PAGE | STATE AID HOME PAGE | DISTRICT HOME PAGE